Annex 4.3. Tabulation of the train path allocation process

Annex 4.3. Tabulation of the train path allocation process

Annex 4.3. Tabulation of the train path allocation process

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Slovenske železnice - Infrastruktura d.o.o. – Network Statement <strong>of</strong> <strong>the</strong> RS 2013 – <strong>Annex</strong> 4/3 – 11.12.2011 – 1<br />

3. TABULATION OF THE TR AIN PATH ALLOCATION PROCESS<br />

3.1. TRAIN PATH REQUEST FOR THE NEW NETWORK TIMETABLE<br />

PROCEDURE TYPE<br />

TIMEFRAME<br />

ORDER<br />

ALLOCATION<br />

ISSUED BY ACCEPTED BY DECISION ISSUED BY DECISION ACCEPTED BY<br />

Regular X-12 to X-8 Applicant Agency Agency Applicant<br />

Late X-8 to X-5 Applicant Agency<br />

Agency<br />

Applicant<br />

Changes to <strong>the</strong><br />

allocated <strong>path</strong>s<br />

X–4 to X+12<br />

The Applicant /<br />

Undertaking<br />

Agency<br />

Agency<br />

Applicant /<br />

Undertaking<br />

3.2. AD HOC TRAIN PATH REQUEST<br />

PROCEDURE TYPE<br />

TIMEFRAME<br />

ORDER<br />

ALLOCATION<br />

ISSUED BY ACCEPTED BY DECISION ISSUED BY DECISION ACCEPTED BY<br />

regular<br />

od 30 do 5 dni pred<br />

vožnjo vlaka<br />

From 30 to 5 days prior to<br />

<strong>the</strong> departure <strong>of</strong> <strong>the</strong> <strong>train</strong><br />

Applicant Agency Applicant<br />

fast - track 1)<br />

od 5 dni do 12 oz. 6 ur<br />

pred vožnjo vlaka<br />

From 5 days to 12 or 6<br />

hours prior to <strong>the</strong><br />

departure <strong>of</strong> <strong>the</strong> <strong>train</strong><br />

Applicant / /<br />

exceptional 2)<br />

po nastanku izrednega<br />

dogodka (12 oz. 6 ur do 1<br />

uro pred vožnjo vlaka)<br />

After an exceptional event<br />

occurs (12 or 6 hours to 1<br />

hour prior to <strong>the</strong> departure<br />

<strong>of</strong> <strong>the</strong> <strong>train</strong>)<br />

Undertaking on Manager's<br />

order 3) / /<br />

1)<br />

2)<br />

3)<br />

this procedure is applied only if <strong>the</strong> <strong>path</strong> has already been allocated to <strong>the</strong> Applicant, o<strong>the</strong>rwise it is required to acquire a <strong>path</strong> according to <strong>the</strong> regular<br />

procedure (<strong>allocation</strong>).<br />

this procedure is applied only for handling <strong>the</strong> consequences <strong>of</strong> an exceptional events, o<strong>the</strong>rwise it is required to acquire a <strong>path</strong> according to <strong>the</strong> regular<br />

procedure (<strong>allocation</strong>).<br />

in this procedure <strong>the</strong> <strong>path</strong> order via <strong>the</strong> web application "Train <strong>path</strong> ordering" or prescribed form is not a necessary condition for <strong>path</strong> construction and <strong>train</strong><br />

introduction.<br />

PAGE 8