Annex 4.3. Tabulation of the train path allocation process

Annex 4.3. Tabulation of the train path allocation process

Annex 4.3. Tabulation of the train path allocation process

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

ANNEX 4/3<br />

TABULATION OF THE TRAIN PATH<br />

ALLOCATION PROCESS


Slovenske železnice - Infrastruktura d.o.o. – Network Statement <strong>of</strong> <strong>the</strong> RS 2013 – <strong>Annex</strong> 4/3 – 11.12.2011 – 1<br />

TABLE OF CONTENT<br />

1. THE PROCESSES OF TRAIN PATH REQUEST (ORDER) FOR NEW NETWORK<br />

TIMETABLE (TT) ......................................................................................................................... 2<br />

1.1. REGULAR PROCEDURE – APPLICATIONS ACCEPTED FROM 12 TO 8 MONTHS PRIOR TO<br />

THE NETWORK TT ENFORCEMENT .......................................................................................................... 2<br />

1.2. LATE REQUEST – APPLICATIONS ARE ACCEPTED FROM EIGHT TO FIVE MONTHS PRIOR<br />

TO THE NETWORK TT ENFORCEMENT .................................................................................................... 3<br />

2. AD HOC TRAIN PATH REQESTS ..................................................................................................... 5<br />

2.1. REGULAR PROCEDURE – APPLICATIONS ARE ACCEPTED FROM 30 TO 5 DAYS PRIOR<br />

TO THE DEPARTURE OF THE TRAIN ........................................................................................................ 5<br />

2.2. FAST-TRACK PROCEDURE – APPLICATIONS FROM 5 DAYS TO 12 OR 6 HOURS PRIOR<br />

TO THE DEPARTURE OF THE TRAIN ........................................................................................................ 6<br />

2.3. EXCEPTIONAL PROCEDURE – PATH REQUESTS IN CASE OF EXCEPTIONAL EVENTS ..................... 7<br />

3. TABULATION OF THE TRAIN PATH ALLOCATION PROCESS ...................................................... 8<br />

3.1. TRAIN PATH REQUEST FOR THE NEW NETWORK TIMETABLE ............................................................. 8<br />

3.2. AD HOC TRAIN PATH REQUEST ................................................................................................................ 8<br />

PAGE 1


Slovenske železnice - Infrastruktura d.o.o. – Network Statement <strong>of</strong> <strong>the</strong> RS 2013 – <strong>Annex</strong> 4/3 – 11.12.2011 – 1<br />

1. THE PROCESSES OF TRAIN P ATH REQUEST (ORDER) FOR NEW NETWORK TIMETABLE (TT)<br />

1.1. REGULAR PROCEDURE – APPLICATIONS ACCEPTED FROM 12 TO 8 MONTHS PRIOR TO THE NETWORK TT ENFORCEMENT<br />

Who issues <strong>the</strong> order<br />

An Applicant, registered with a competent authority prior to <strong>the</strong> application submission.<br />

TRAIN PATH<br />

REQUEST<br />

(ORDER)<br />

The following three ways are enforced for requesting (ordering) a <strong>train</strong> <strong>path</strong>:<br />

How<br />

Electronic form, via web application "Train <strong>path</strong> ordering",<br />

Path Coordination System (PCS) – completion <strong>of</strong> a form in PCS tool,<br />

Hard copy – completion <strong>of</strong> a written form, published in <strong>the</strong> Network Statement.<br />

When From twelve to eight months prior to <strong>the</strong> Network Statement enforcement (X – 12 to X – 8).<br />

To who<br />

Archiving <strong>the</strong> information, event<br />

tracking<br />

Who manages <strong>the</strong> coordination <strong>of</strong><br />

suggestions<br />

Public Agency <strong>of</strong> <strong>the</strong> Republic <strong>of</strong> Slovenia for Railway Transport (Agency).<br />

All activities and <strong>process</strong>es are registered in <strong>the</strong> database <strong>of</strong> <strong>the</strong> Agency.<br />

The Agency.<br />

COORDINATION<br />

OF PREPARED<br />

CONSTRUCTION<br />

How <strong>the</strong> prepared construction is<br />

forwarded for coordination<br />

Depends on <strong>the</strong> way <strong>of</strong> how <strong>the</strong> <strong>path</strong> order was accepted:<br />

Electronic form, via web application "Train <strong>path</strong> ordering",<br />

PCS,<br />

Hard copy.<br />

When Immediately, after accepting <strong>the</strong> prepared construction and not later than from X - 5 to X - 4.<br />

With who<br />

With <strong>the</strong> Applicant and <strong>the</strong> Manager elaborating <strong>the</strong> construction.<br />

Archiving <strong>the</strong> information, event<br />

tracking<br />

All activities, suggestions and coordination <strong>process</strong>es are registered in <strong>the</strong> databases <strong>of</strong> <strong>the</strong> Agency and <strong>the</strong><br />

Manager.<br />

CONFIRMATION<br />

AND<br />

ACCEPTANCE OF<br />

THE<br />

CONSTRUCTED<br />

TRAIN PATH<br />

Who confirms<br />

How <strong>the</strong> suggested construction is<br />

confirmed and accepted<br />

To who and when<br />

The Applicant.<br />

Depends on <strong>the</strong> way <strong>of</strong> how <strong>the</strong> <strong>path</strong> order was placed:<br />

Electronic form, via web application "Train <strong>path</strong> ordering",<br />

PCS, using certain key for completing <strong>the</strong> coordination <strong>process</strong>,<br />

Hard copy.<br />

To <strong>the</strong> Agency within 30 (thirty) days, not later than 4 (four) months prior to <strong>the</strong> Network timetable enforcement.<br />

PAGE 2


Slovenske železnice - Infrastruktura d.o.o. – Network Statement <strong>of</strong> <strong>the</strong> RS 2013 – <strong>Annex</strong> 4/3 – 11.12.2011 – 1<br />

ISSUING THE<br />

DECISION ON<br />

TRAIN PATH<br />

ALLOCATION<br />

Who issues <strong>the</strong> decision<br />

How<br />

When<br />

To who<br />

The Agency.<br />

Hard copy.<br />

Not later than 2 (two) months prior to <strong>the</strong> Network timetable enforcement.<br />

To <strong>the</strong> Applicant and to <strong>the</strong> Manager for information.<br />

1.2. LATE REQUEST – APPLICATIONS ARE ACCEPTED FROM EIGHT TO FIVE MONTHS PRIOR TO THE NETWORK TT ENFORCEMENT<br />

Who issues <strong>the</strong> order<br />

How<br />

An Applicant, registered with a competent authority prior to <strong>the</strong> application submission.<br />

The following three ways are enforced for requesting (ordering) a <strong>train</strong> <strong>path</strong>:<br />

Electronic form, via web application "Train <strong>path</strong> ordering",<br />

PCS – completion <strong>of</strong> a form in PCS tool,<br />

Hard copy – completion <strong>of</strong> a written form, published in <strong>the</strong> Network Statement.<br />

TRAIN PATH<br />

ORDERING<br />

When From eight to five months prior to <strong>the</strong> Network timetable enforcement (X – 8 to X – 5)<br />

To who<br />

Public Agency <strong>of</strong> <strong>the</strong> Republic <strong>of</strong> Slovenia for Railway Transport (Agency).<br />

Special provisions<br />

Who coordinates <strong>the</strong> suggestions<br />

The Agency shall send <strong>the</strong> confirmation on admission <strong>of</strong> <strong>the</strong> request to <strong>the</strong> Applicant within 5 (five) days.<br />

The Agency shall <strong>process</strong> only complete applications. If <strong>the</strong> Applicant submits an incomplete or<br />

incomprehensible application, <strong>the</strong> Agency within 5 (five) working days after <strong>the</strong> receipt <strong>of</strong> <strong>the</strong> application<br />

contacts <strong>the</strong> Applicant, asking it to complete <strong>the</strong> form, o<strong>the</strong>rwise <strong>the</strong> application shall not be <strong>process</strong>ed.<br />

The Agency.<br />

COORDINATION<br />

OF PREPARED<br />

CONSTRUCTION<br />

How <strong>the</strong> prepared construction is<br />

forwarded for coordination<br />

Depends on <strong>the</strong> way <strong>of</strong> how <strong>the</strong> <strong>path</strong> order was accepted:<br />

Electronic form, via web application "Train <strong>path</strong> ordering",<br />

PCS,<br />

Hard copy.<br />

When Immediately, after accepting <strong>the</strong> prepared construction, not later than from X - 5 to X - 4.<br />

With whom <strong>the</strong> coordination takes<br />

place<br />

Special provisions<br />

With Applicant and <strong>the</strong> Manager.<br />

If <strong>the</strong> Applicant during coordination <strong>process</strong> fails to submit its viewpoint in time, it is considered that <strong>the</strong> Applicant insists<br />

on its primary application.<br />

PAGE 3


Slovenske železnice - Infrastruktura d.o.o. – Network Statement <strong>of</strong> <strong>the</strong> RS 2013 – <strong>Annex</strong> 4/3 – 11.12.2011 – 1<br />

CONFIRMATION<br />

AND<br />

ACCEPTANCE OF<br />

THE<br />

CONSTRUCTED<br />

TRAIN PATH<br />

ISSUING THE<br />

DECISION ON<br />

TRAIN PATH<br />

ALLOCATION<br />

Who confirms<br />

How <strong>the</strong> suggested construction is<br />

confirmed and accepted<br />

When<br />

To who<br />

Who allocates <strong>the</strong> <strong>train</strong> <strong>path</strong><br />

How<br />

When<br />

Komu<br />

The Applicant<br />

Depends on <strong>the</strong> way <strong>of</strong> how <strong>the</strong> <strong>path</strong> order was accepted:<br />

Electronic form, via web application "Train <strong>path</strong> ordering",<br />

PCS,<br />

Hard copy.<br />

Within 30 (thirty) days, not later than 4 (four) months prior to <strong>the</strong> Network timetable enforcement.<br />

The Agency.<br />

The Agency.<br />

Hard copy.<br />

Not later than 2 (two) months prior to <strong>the</strong> Network timetable enforcement.<br />

To <strong>the</strong> Applicant and to <strong>the</strong> Manager for information.<br />

PAGE 4


2. AD HOC TRAIN PATH REQESTS<br />

Slovenske železnice - Infrastruktura d.o.o. – Network Statement <strong>of</strong> <strong>the</strong> RS 2013 – <strong>Annex</strong> 4/3 – 11.12.2011 – 1<br />

2.1. REGULAR PROCEDURE – APPLICATIONS ARE ACCEPTED FROM 30 TO 5 DAYS PRIOR TO THE DEPARTURE OF THE TRAIN<br />

TRAIN PATH<br />

ORDER<br />

COORDINATION<br />

OF PREPARED<br />

CONSTRUCTION<br />

Who issues <strong>the</strong> order<br />

How<br />

When<br />

To who<br />

Archiving <strong>the</strong> information, event<br />

tracking<br />

Who coordinates <strong>the</strong> suggestions<br />

How <strong>the</strong> prepared construction is<br />

forwarded for coordination<br />

When<br />

With who<br />

An Applicant, registered with a competent authority prior to <strong>the</strong> application submission.<br />

The following three ways are enforced for requesting (ordering) a <strong>train</strong> <strong>path</strong>:<br />

Electronic form, via web application "Train <strong>path</strong> ordering",<br />

PCS – completion <strong>of</strong> a form in PCS tool,<br />

Hard copy – completion <strong>of</strong> a written form, published in <strong>the</strong> Network Statement.<br />

From 30 to 5 days prior to <strong>the</strong> departure <strong>of</strong> <strong>the</strong> <strong>train</strong>.<br />

Public Agency <strong>of</strong> <strong>the</strong> Republic <strong>of</strong> Slovenia for Railway Transport (Agency).<br />

All activities and <strong>process</strong>es are registered in <strong>the</strong> database <strong>of</strong> <strong>the</strong> Agency.<br />

The Agency.<br />

Depends on <strong>the</strong> way <strong>of</strong> how <strong>the</strong> <strong>path</strong> order was placed:<br />

Electronic form, via web application "Train <strong>path</strong> ordering",<br />

PCS,<br />

Hard copy.<br />

Not later than 5 (five) days prior to <strong>the</strong> departure <strong>of</strong> <strong>the</strong> <strong>train</strong>.<br />

With <strong>the</strong> Applicant and <strong>the</strong> Manager elaborating <strong>the</strong> construction.<br />

CONFIRMATION<br />

AND<br />

ACCEPTANCE OF<br />

THE<br />

CONSTRUCTED<br />

TRAIN PATH<br />

Special provisions<br />

Who confirms<br />

How <strong>the</strong> suggested construction is<br />

confirmed and accepted<br />

To who and when<br />

If <strong>the</strong> Applicant during coordination <strong>process</strong> fails to submit its viewpoint in time, it is considered that <strong>the</strong><br />

Applicant insists on its primary application.<br />

The Applicant.<br />

Depends on <strong>the</strong> way <strong>of</strong> how <strong>the</strong> <strong>path</strong> order was accepted:<br />

Electronic form, via web application "Train <strong>path</strong> ordering",<br />

PCS,<br />

Hard copy.<br />

To <strong>the</strong> Agency not later than 5 (five) days prior to <strong>the</strong> departure <strong>of</strong> <strong>the</strong> <strong>train</strong>.<br />

PAGE 5


Slovenske železnice - Infrastruktura d.o.o. – Network Statement <strong>of</strong> <strong>the</strong> RS 2013 – <strong>Annex</strong> 4/3 – 11.12.2011 – 1<br />

ISSUING THE<br />

DECISION ON<br />

TRAIN PATH<br />

ALLOCATION<br />

Who issues <strong>the</strong> decision<br />

How<br />

When<br />

To who<br />

The Agency.<br />

Hard copy.<br />

Not later than 5 (five) days prior to <strong>the</strong> departure <strong>of</strong> <strong>the</strong> <strong>train</strong>.<br />

To <strong>the</strong> Applicant and <strong>the</strong> Manager for information.<br />

2.2. FAST-TRACK PROCEDURE – APPLICATIONS FROM 5 DAYS TO 12 OR 6 HOURS PRIOR TO THE DEPARTURE OF THE TRAIN<br />

ORDER FOR<br />

DELIVERY OF THE<br />

ALLOCATED<br />

TRAIN PATH<br />

PREPARATION OF<br />

PATH<br />

CONSTRUCTION<br />

Who issues <strong>the</strong> order<br />

How<br />

When<br />

To who<br />

Special provisions<br />

Special provisions<br />

Who coordinates <strong>the</strong> suggestions<br />

An Applicant, registered with a competent authority prior to <strong>the</strong> application submission.<br />

The following two ways are enforced for requesting (ordering) a <strong>train</strong> <strong>path</strong>:<br />

Electronic form, using <strong>the</strong> web application "Train <strong>path</strong> ordering",<br />

Hard copy – completing a written form, published in <strong>the</strong> Network Statement.<br />

From 5 days to 12 hours prior to <strong>the</strong> departure <strong>of</strong> <strong>the</strong> <strong>train</strong> or 6 hours prior to <strong>the</strong> departure <strong>of</strong> <strong>the</strong> <strong>train</strong> in<br />

international freight traffic.<br />

Traffic center <strong>of</strong> <strong>the</strong> Manager.<br />

The Manager shall <strong>process</strong> only complete applications.<br />

The <strong>train</strong> <strong>path</strong>s are not adjusted to special requirements <strong>of</strong> <strong>the</strong> Applicants, but <strong>the</strong> available capacity is<br />

allocated. The Applicant can choose <strong>the</strong> best option among available <strong>path</strong>s.<br />

The Manager accepting <strong>the</strong> order for distribution <strong>of</strong> <strong>the</strong> allocated <strong>path</strong>.<br />

How <strong>the</strong> prepared construction is<br />

COORDINATION forwarded for coordination<br />

OF SUGGESTED<br />

CONSTRUCTION When<br />

With who <strong>the</strong> coordination takes<br />

place<br />

Electronic form, using <strong>the</strong> web application "Train <strong>path</strong> ordering",<br />

By phone.<br />

Not later than 6 hours prior to <strong>the</strong> departure <strong>of</strong> <strong>the</strong> <strong>train</strong>.<br />

With <strong>the</strong> Applicant.<br />

CONFIRMATION<br />

AND<br />

ACCEPTANCE OF<br />

THE<br />

CONSTRUCTED<br />

TRAIN PATH<br />

Who confirms<br />

How <strong>the</strong> suggested construction is<br />

confirmed and accepted<br />

To who and when<br />

The Applicant.<br />

Depends on <strong>the</strong> way <strong>of</strong> how <strong>the</strong> <strong>path</strong> order was accepted:<br />

Electronic form, using <strong>the</strong> web application "Train <strong>path</strong> ordering",<br />

Hard copy.<br />

To <strong>the</strong> Manager not later than 6 hours prior to <strong>the</strong> departure <strong>of</strong> <strong>the</strong> <strong>train</strong>.<br />

PAGE 6


Slovenske železnice - Infrastruktura d.o.o. – Network Statement <strong>of</strong> <strong>the</strong> RS 2013 – <strong>Annex</strong> 4/3 – 11.12.2011 – 1<br />

TRAIN PATH<br />

DISTRIBUTION<br />

Who distributes <strong>the</strong> <strong>path</strong><br />

How<br />

When<br />

To who<br />

Traffic center <strong>of</strong> <strong>the</strong> Manager.<br />

Depends on <strong>the</strong> way <strong>of</strong> how <strong>the</strong> <strong>path</strong> order was accepted:<br />

Electronic form, using <strong>the</strong> web application "Train <strong>path</strong> ordering",<br />

Hard copy, sent by fax.<br />

Not later than 6 hours prior to <strong>the</strong> departure <strong>of</strong> <strong>the</strong> <strong>train</strong>.<br />

To <strong>the</strong> Applicant and <strong>the</strong> Agency for information.<br />

2.3. EXCEPTIONAL PROCEDURE – PATH REQUESTS IN CASE OF EXCEPTIONAL EVENTS<br />

TRAIN PATH USE<br />

CONSTRUCTION<br />

AND<br />

COORDINATION<br />

TRAIN PATH<br />

DISTRIBUTION<br />

Who decides on use<br />

What are <strong>the</strong> conditions for<br />

initiative<br />

When<br />

Special provisions<br />

Who adjusts <strong>the</strong> construction<br />

How <strong>the</strong> prepared construction is<br />

forwarded for coordination<br />

When<br />

To who<br />

Special provisions<br />

Who distributes <strong>the</strong> <strong>path</strong><br />

How<br />

When<br />

Traffic center <strong>of</strong> <strong>the</strong> Manager.<br />

The Manager informs <strong>the</strong> Undertaking or Applicants on exceptional event and requires a <strong>train</strong> <strong>path</strong> order.<br />

From <strong>the</strong> moment <strong>the</strong> exceptional event occurred to 1 hour prior to <strong>the</strong> <strong>train</strong> departure.<br />

In exceptional procedure <strong>the</strong> <strong>path</strong> order via web application "Train <strong>path</strong> ordering" or prescribed form is not a<br />

necessary condition for <strong>path</strong> construction and <strong>train</strong> introduction.<br />

Traffic center <strong>of</strong> <strong>the</strong> Manager.<br />

<br />

<br />

Electronic form, using <strong>the</strong> web application "Train <strong>path</strong> ordering",<br />

By phone.<br />

Immediately, after accepting <strong>the</strong> order.<br />

To <strong>the</strong> Undertaking.<br />

The <strong>train</strong> <strong>path</strong> is constructed in accordance to <strong>the</strong> actual situation, possibilities and available capacities.<br />

Traffic center <strong>of</strong> <strong>the</strong> Manager.<br />

Depends on <strong>the</strong> way <strong>of</strong> how <strong>the</strong> <strong>path</strong> order was accepted:<br />

Electronic form, using <strong>the</strong> web application "Train <strong>path</strong> ordering",<br />

Hard copy, sent by fax,<br />

By phone.<br />

Immediately, after <strong>the</strong> construction is prepared.<br />

PAGE 7


Slovenske železnice - Infrastruktura d.o.o. – Network Statement <strong>of</strong> <strong>the</strong> RS 2013 – <strong>Annex</strong> 4/3 – 11.12.2011 – 1<br />

3. TABULATION OF THE TR AIN PATH ALLOCATION PROCESS<br />

3.1. TRAIN PATH REQUEST FOR THE NEW NETWORK TIMETABLE<br />

PROCEDURE TYPE<br />

TIMEFRAME<br />

ORDER<br />

ALLOCATION<br />

ISSUED BY ACCEPTED BY DECISION ISSUED BY DECISION ACCEPTED BY<br />

Regular X-12 to X-8 Applicant Agency Agency Applicant<br />

Late X-8 to X-5 Applicant Agency<br />

Agency<br />

Applicant<br />

Changes to <strong>the</strong><br />

allocated <strong>path</strong>s<br />

X–4 to X+12<br />

The Applicant /<br />

Undertaking<br />

Agency<br />

Agency<br />

Applicant /<br />

Undertaking<br />

3.2. AD HOC TRAIN PATH REQUEST<br />

PROCEDURE TYPE<br />

TIMEFRAME<br />

ORDER<br />

ALLOCATION<br />

ISSUED BY ACCEPTED BY DECISION ISSUED BY DECISION ACCEPTED BY<br />

regular<br />

od 30 do 5 dni pred<br />

vožnjo vlaka<br />

From 30 to 5 days prior to<br />

<strong>the</strong> departure <strong>of</strong> <strong>the</strong> <strong>train</strong><br />

Applicant Agency Applicant<br />

fast - track 1)<br />

od 5 dni do 12 oz. 6 ur<br />

pred vožnjo vlaka<br />

From 5 days to 12 or 6<br />

hours prior to <strong>the</strong><br />

departure <strong>of</strong> <strong>the</strong> <strong>train</strong><br />

Applicant / /<br />

exceptional 2)<br />

po nastanku izrednega<br />

dogodka (12 oz. 6 ur do 1<br />

uro pred vožnjo vlaka)<br />

After an exceptional event<br />

occurs (12 or 6 hours to 1<br />

hour prior to <strong>the</strong> departure<br />

<strong>of</strong> <strong>the</strong> <strong>train</strong>)<br />

Undertaking on Manager's<br />

order 3) / /<br />

1)<br />

2)<br />

3)<br />

this procedure is applied only if <strong>the</strong> <strong>path</strong> has already been allocated to <strong>the</strong> Applicant, o<strong>the</strong>rwise it is required to acquire a <strong>path</strong> according to <strong>the</strong> regular<br />

procedure (<strong>allocation</strong>).<br />

this procedure is applied only for handling <strong>the</strong> consequences <strong>of</strong> an exceptional events, o<strong>the</strong>rwise it is required to acquire a <strong>path</strong> according to <strong>the</strong> regular<br />

procedure (<strong>allocation</strong>).<br />

in this procedure <strong>the</strong> <strong>path</strong> order via <strong>the</strong> web application "Train <strong>path</strong> ordering" or prescribed form is not a necessary condition for <strong>path</strong> construction and <strong>train</strong><br />

introduction.<br />

PAGE 8