19.01.2015 Views

Budget Message / Highlights - Metropolitan Water Reclamation ...

Budget Message / Highlights - Metropolitan Water Reclamation ...

Budget Message / Highlights - Metropolitan Water Reclamation ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

METROPOLITAN WATER RECLAMATION DISTRICT OF GREATER CHICAGO<br />

2009 BUDGET<br />

Fund: Construction POSITION ANALYSIS<br />

Dept: Engineering<br />

Division: 2007 2008 2009<br />

PAY PLAN<br />

& GRADE<br />

CLASS TITLE<br />

ACTUAL<br />

POSITIONS<br />

BUDGETED<br />

POSITIONS<br />

ACTUAL<br />

POSITIONS<br />

APPROPRIATION<br />

IN DOLLARS<br />

NUMBER<br />

APPROPRIATION<br />

IN DOLLARS<br />

HP12 Electronic Control Technician II 2 - - - - -<br />

HP12 Engineering Technician IV 1 3 3 190,182.46 3 173,187.04<br />

TOTAL Construction North and Central Area Section 8 6 6 415,093.38 6 410,324.46<br />

TOTAL Construction Division 18 16 16 1,288,977.82 15 1,269,874.32<br />

TOTAL Engineering Construction 49 45 45 4,145,885.38 45 4,309,233.76<br />

NOTE: Departmental appropriation totals for salaries in the Position Analysis differ from those contained in the Line Item Analysis by a factor identified to adjust for vacancies.<br />

Salary ranges corresponding to the pay plan and grade for each class title can be found in the table of Salary Schedules in the Appendix.<br />

395<br />

395

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!