METROPOLITAN WATER RECLAMATION DISTRICT OF GREATER CHICAGO<br />

2009 BUDGET<br />

Capital Improvements Bond Fund Program Impacts<br />

Projects Under Development (continued)<br />

Justification<br />

Impact<br />

# Project Name<br />

Project<br />

Number<br />

40 Wet Weather Equalization Ponds, EWRP 07-497-3D x x = = =<br />

41 Mainstream South Pump House TARP Pumps Rehabilitation, 05-146-3M x = = =<br />

SWRP<br />

42 North Branch of the Chicago River and North Shore Channel 07-030-3D x = = =<br />

Restoration<br />

43 Westside Grit Handling Improvements, SWRP 04-129-3P x x + ++ =<br />

44 Distributed Control System for Westside, SWRP 91-177-DE x + = =<br />

45 Lemont Pumping Station and Forcemains, CSA, SSA 08-714-3P x - + =<br />

46 Westside Primary Settling Tanks - Battery A Imhoff<br />

04-128-3P x x x ++ = =<br />

Replacement, SWRP<br />

47 ∴ Digester Facility Improvements, HPWRP 08-530-3P x = = =<br />

48 Final Clarifier Collectors Replacement at Batteries A, B & C, 02-113-3P x x + = =<br />

SWRP<br />

49 Lagoons 3 and 4 Lining, CWRP 06-215-3D x = = =<br />

50 Gate Control Equipment Upgrade at TARP Control Structures, 06-358-3M x = = =<br />

KWRP, NSA<br />

51 A/B & C/D Service Tunnels Rehabilitation - Phase 4, SWRP 04-134-3D x = = =<br />

52 Des Plaines River Intercepting Sewer Rehabilitation, SSA 06-158-3S x = = =<br />

53 Battery D Air Diffuser System Replacement, NSWRP 97-090-2P x = + =<br />

54 Inverted Siphon Reconstruction, SSA 08-172-3S x = = =<br />

55 Retention Ponds Deepening, Lining and Modifications, HPWRP 08-529-3D x = = =<br />

56 Battery E, NSWRP 06-020-3P x x - - =<br />

57 C/D Service Tunnel and Connecting Tunnel Rehabilitation- 04-132-3D x = = =<br />

Phase 2, SWRP<br />

58 Digester Upgrades for Class A Biosolids, CWRP 05-210-3P x = = =<br />

59 Digester Gas Storage Facility, Stickney WRP and Hanover Park 08-867-3P x = + =<br />

WRP<br />

60 R&D Laboratory Facility at Stickney WRP 06-151-3V x = = =<br />

61 Inverted Siphon Reconstruction, CSA 08-227-3S x = = =<br />

62 Upper Des Plaines Intercepting Sewer 14B Rehabilitation, NSA 06-360-3S x = = =<br />

63 Upper Des Plaines Intercepting Sewer 20B Rehabilitation, NSA 06-357-3S x -- = =<br />

64 Lagoons 14 & 15 Lining, CWRP 08-224-3D x = = =<br />

65 McCook Reservoir Expanded Stage 2 Overburden<br />

73-161-DH x x x - -- =<br />

Removal, SSA<br />

66 A/B Service Tunnel Rehabilitation - Phase 3, SWRP 04-133-3D x = = =<br />

67 39th Street Conduit Rehabilitation-Phase II & 43rd St. Structure 01-103-AS x x = = =<br />

Rehab, SSA<br />

68 Westside Circular Primary Settling Tanks - Battery B Imhoff 04-135-3P x x x ++ = =<br />

Replacement, SWRP<br />

Bold type indicates projects to be financed by "Unlimited Tax Bonds."<br />

∴ These projects are funded by the Bond and Corporate Funds.<br />

The related Corporate Fund portion is detailed in the Corporate Fund's section<br />

LEGEND<br />

Under "Justification", the marked columns note the categories of benefits expected from each project.<br />

Manpower<br />

+ or - Labor savings (+) or increases (-) expected to result in ++ or -- Labor impact significant enough to ultimately result in reduction (++)<br />

redirecting existing manpower away from or toward facility<br />

or increase (--) in personnel. See additional cost details contained<br />

or process to other tasks with no net change in total position costs.<br />

in "Description of Capital Projects" section.<br />

Energy<br />

+ or - Minor energy savings (+) or costs (-) having a negligible ++ or -- Major energy savings (++) or costs (--) expected to result in significant<br />

impact on the District's overall energy budget.<br />

revisions to a facility's energy budget. See additional cost details<br />

in "Description of Capital Projects" section.<br />

Chemical<br />

+ or - Chemical savings (+) or costs (-) having a negligible ++ or -- Major chemical savings (++) or costs (--) expected to result in<br />

impact on the District's overall chemical costs.<br />

significant revisions to the budgeted chemical expenditures for the<br />

associated process. See additional cost details contained in<br />

= No budgetary impact expected.<br />

"Description of Capital Projects" section.<br />

Capacity Needs<br />

Useful Life<br />

Economic Benefit<br />

Safety/Regulatory<br />

Manpower<br />

Energy<br />

Chemical<br />

375<br />

375