METROPOLITAN WATER RECLAMATION DISTRICT OF GREATER CHICAGO<br />

2009 BUDGET<br />

Construction Fund Program Impacts<br />

Justification<br />

Impact<br />

# Project Name<br />

Awards in 2009<br />

Project<br />

Number<br />

Capacity Needs<br />

Useful Life<br />

Economic Benefit<br />

Safety/Regulatory<br />

Manpower<br />

Energy<br />

Chemical<br />

1 ** Westdale Gardens Pumping Station & Force Main, Northwest<br />

8A Extension A, SSA<br />

2 ** Touhy Avenue Bridge Rehabilitation and Repairs of other<br />

Bridges on the North Shore Channel, NSA<br />

07-162-2S x - - -<br />

05-834-2D x = = =<br />

3 HVAC Improvements, SWRP 05-147-2M x = = =<br />

4 Aquatic Ecology & <strong>Water</strong> Quality Equipment Storage 08-173-2V x = - =<br />

Building, SWRP<br />

5 Underground Potable and Effluent <strong>Water</strong> Piping Upgrades,<br />

NSWRP<br />

06-024-2M x = = =<br />

Projects Under Development<br />

$2,250<br />

6 Primary Odor Control Equipment Installation O'Hare TARP 07-364-2M x + + +<br />

DS-5<br />

7 ** Lockport Power House Interior North Wall Repairs, SSA 08-862-2D x x = = =<br />

8 ** HVAC Improvements at 95th, 122nd, & 125th Street Pumping<br />

Stations, CSA<br />

06-213-2M x = = =<br />

9 Roof Renovation, Lockport Powerhouse 05-828-2V x = = =<br />

** These projects are funded by the Construction and Corporate Funds.<br />

The related Corporate Fund portion is detailed in the Corporate Fund's section.<br />

Note: All cost figures are in thousands of dollars; inflation factor is 0%.<br />

LEGEND<br />

Under "Justification", the marked columns note the categories of benefits expected from each project.<br />

Manpower<br />

+ or - Labor savings (+) or increases (-) expected to result in ++ or -- Labor impact significant enough to ultimately result in reduction (++)<br />

redirecting existing manpower away from or toward facility<br />

or increase (--) in personnel. See additional cost details contained<br />

or process to other tasks with no net change in total position costs.<br />

in "Description of Capital Projects" section.<br />

Energy<br />

+ or - Minor energy savings (+) or costs (-) having a negligible ++ or -- Major energy savings (++) or costs (--) expected to result in significant<br />

impact on the District's overall energy budget.<br />

revisions to a facility's energy budget. See additional cost details<br />

in "Description of Capital Projects" section.<br />

Chemical<br />

+ or - Chemical savings (+) or costs (-) having a negligible ++ or -- Major chemical savings (++) or costs (--) expected to result in<br />

impact on the District's overall chemical costs.<br />

significant revisions to the budgeted chemical expenditures for the<br />

associated process. See additional cost details contained in<br />

= No budgetary impact expected.<br />

"Description of Capital Projects" section.<br />

∗ This project is funded by the Capital Improvements Bond Fund, Construction Fund and Corporate Fund.<br />

The related Corporate Fund portion is detailed in the Corporate Fund's section.<br />

370<br />