METROPOLITAN WATER RECLAMATION DISTRICT OF GREATER CHICAGO<br />

2009 BUDGET<br />

DESCRIPTION OF CAPITAL PROJECTS (continued)<br />

08-227-3S<br />

08-529-3D<br />

08-530-3P<br />

08-714-3P<br />

08-862-2D<br />

08-865-3P<br />

08-867-3P<br />

Inverted Siphon Reconstruction, CSA<br />

Reconstruction of the inverted siphons located in the Calumet Service Area.<br />

Retention Pond Deepening, Lining and Modifications, HPWRP<br />

Deepening of the retention ponds and elimination of two intermediate berms to increase the storage<br />

volume from an estimated 40 million gallons, to a volume of 80 million gallons, to serve as<br />

temporary storage during storm events; lining of the ponds. Lining and paving of lagoon bottoms,<br />

retaining wall construction, protection of side slopes of the lagoons, construction of new draw-off<br />

boxes, modifications to the sludge and supernatant draw-off pipe lines and other ancillary features as<br />

needed.<br />

Digester Facility Improvements, HPWRP<br />

All work to be performed in the digester complex: Install automatic gas isolation system to isolate<br />

the digesters from the gas header system; rehabilitate the HVAC system; modify the hot water<br />

circulating system; install a magnetic flow meter in the primary sludge line; and modify the gas<br />

piping system.<br />

Lemont Pumping Station and Forcemains, CSA, SSA<br />

It is expected that the capacity of the Lemont WRP will soon be exceeded due to population growth<br />

in the area. Therefore, this project consists of constructing a pump station and forcemains in order to<br />

transport all of Lemont’s sewage to the collection system for the Stickney WRP, where it will be<br />

treated. The pump station and forcemains will also operate in conjunction with the reservoir being<br />

built at the Lemont WRP under Contract 05-711-3P.<br />

Lockport Power House Interior North Wall Repairs, SSA<br />

Repair of leaking construction joint and replacement of masonry on the interior north wall of the<br />

Lockport Power House.<br />

Aeration Tanks and Elevators Rehabilitation, NSWRP, KWRP, EWRP<br />

Replacement of disc membrane fine bubble diffusers with ceramic plate fine bubble diffusers in<br />

North Aeration Battery at EWRP. Replacement of fine bubble diffuser plates, damaged plate<br />

holders, and air drops in South Aeration Battery at EWRP and in Batteries A and B at KWRP.<br />

Replacement of fine bubble diffusers with coarse bubble diffusers in channels of Batteries A and B at<br />

KWRP. Replacement of flow transmitters in North Aeration Battery at EWRP and in Batteries A<br />

and B at KWRP. Rehabilitation of elevators at KWRP and NSWRP. Replacement of slide gate for<br />

fine screen isolation at EWRP. Miscellaneous concrete repairs at EWRP and KWRP.<br />

Digester Gas Storage Facility, Stickney WRP and Hanover Park WRP<br />

Construction of underground storage tanks for digester gas, associated collection and transmission<br />

piping, compression/pumping station and ancillary equipment.<br />

CAPITAL IMPROVEMENTS BOND FUND<br />

Under the powers derived from the <strong>Metropolitan</strong> <strong>Water</strong> <strong>Reclamation</strong> District Act (70 ILCS 2605) section 9.6a, the<br />

Board of Commissioners of the <strong>Metropolitan</strong> <strong>Water</strong> <strong>Reclamation</strong> District of Greater Chicago has authorized the<br />

issuance and sale of general obligation bonds to provide funds required for the replacement, remodeling,<br />

completing, altering and enlarging of sewage treatment works or flood control facilities and additions thereto,<br />

acquire air pollution stations, tunnels, conduits, intercepting sewers and outlet sewers together with the equipment<br />

and appurtenances thereto, and for the acquisition of the sites and rights-of-way necessary thereto, and for<br />

engineering expenses for designing and supervising the construction of such works, which for 2009 amount to<br />

$932,866,800.<br />

368<br />