METROPOLITAN WATER RECLAMATION DISTRICT OF GREATER CHICAGO<br />

2009 BUDGET<br />

06-218-3M<br />

06-357-3S<br />

06-358-3M<br />

06-359-3S<br />

06-360-3S<br />

06-363-3D<br />

06-494-3P<br />

06-526-3P<br />

06-839-3E<br />

06-842-3E<br />

Blower Nos. 9 & 10 and Air Main Installation, CWRP<br />

Furnish, deliver and install two new 75,000 SCFM blowers (Nos. 9 and 10), replace existing 5700 hp<br />

motors on Blowers Nos. 6 and 7 with 6000 hp motors, and provide blower system master controller,<br />

install new 60" air main header to provide a "looped" plant process air piping system, relocation of<br />

underground utilities for the installation of the 60" air main. Replace primary and secondary air filter<br />

elements, rearrange stored material in blower building basement for installation of new blowers,<br />

misc. modifications in the blower building and provide an uninterruptible power supply system in<br />

Control Building.<br />

Upper Des Plaines Intercepting Sewer 20B Rehabilitation, NSA<br />

Project consists of rehabilitating 6,100 feet of 60 inch diameter circular pipe sewer by cured-in-place<br />

pipe lining process, rehabilitating two entrance conduits to Drop Shaft 5 by spray-on products and<br />

rehabilitating 9 manholes by spray-on products.<br />

Gate Control Equipment Upgrade at TARP Control Structures, KWRP, NSA<br />

Upgrading about 25 TARP control structures including hydraulic power units, actuators,<br />

accumulators and stem assemblies.<br />

Upper Des Plaines Intercepting Sewer 14A Rehabilitation, NSA<br />

Project consists of rehabilitating 18,600 feet of 69 inch diameter circular sewer by cured-in-place<br />

pipe lining and/or slip lining process, and 32 manholes and structures.<br />

Upper Des Plaines Intercepting Sewer 14B Rehabilitation, NSA<br />

Project consists of rehabilitating 3,000 feet of 48 inch diameter sewer and 11,000 feet of 69 inch<br />

diameter sewer by cured-in-place pipe lining and/or slip lining method. Rehabilitating 26<br />

manholes/structures and constructing one new manhole on an existing junction structure.<br />

O'Hare CUP Reservoir Repair & Rehabilitation, NSA<br />

Project includes a two phase approach to implement the most economical remediation measure to<br />

stop the seepage and to stabilize the slopes of the O'Hare CUP Reservoir.<br />

Centrifuge Building & Sludge Loading System Upgrades, EWRP<br />

Rehabilitate the floor drain system in the lower level of the Centrifuge Building. Remove the<br />

Serpentex Belt in the Centrifuge Loading Building. Remove the hoppers and conveyors and replace<br />

with a pumping system.<br />

Hanover Park Master Plan Projects, HPWRP<br />

Based on the 40 year plan for the Hanover Park <strong>Water</strong> <strong>Reclamation</strong> Plant, development of major<br />

infrastructure needs, process needs and solids handling needs projects will be done. The Master Plan<br />

will prioritize major construction projects for the next 20 years.<br />

TARP Radio Upgrade and Backup Antenna, CSA, SSA, NSA<br />

This project upgrades the current TARP radio system. The new system will have double the data<br />

speed of the current system, allowing for faster communications and a higher capacity. This project<br />

also provides a fully redundant backup repeater radio site that can take over in the event of a problem<br />

at the existing repeater site at Presidential Towers.<br />

DCS and Electrical Work, HPWRP, KWRP, EWRP<br />

This project is a clean-up contract to the Distributed Control System Installation contract. Scope<br />

includes items below plus assorted issues. Hanover Park: Miscellaneous small items and other work.<br />

Kirie: Blower controls and Filter Building switchgear. Egan: Filter valve controls.<br />