METROPOLITAN WATER RECLAMATION DISTRICT OF GREATER CHICAGO 2009 BUDGET 05-147-2M 05-210-3P 05-711-3P 05-828-2V 05-834-2D 05-836-3D 06-020-3P 06-023-3P 06-024-2M HVAC Improvements, SWRP Remove and replace three air handling units, two chillers, effluent water pumps and strainers in the Central Control Building; remove and replace one air handling unit, one A/C rooftop unit and six rooftop exhaust units in the Central Heat Building; remove and replace two air handling units in the SW Preliminary Control House; remove and replace two air handling units in the Aerated Grit Building; remove and replace one air handling unit, four cooling towers serving the R&D Building; design and install a dedicated A/C unit for the Greenhouse in the R&D Building; remove and replace the existing ozone generators at the digesters with new ozone units; install large capacity exhaust fans to increase the air changes in the North and South Gate Houses; install an exhaust fan arrangement to allow for better ventilation in the Offices, Shops and Storage Complex; replace two air handling units and ductwork in the Post Centrifuge Facility; replace one fan, one unit heater, four coils and update control system for the air handling units, design and install a supply fan for the blower floor, replace steam radiation system in the Pump & Blower Building; replace three coils at air handling units in the Imhoff Batteries A, Pump & Blower Building; replace three coils at air handling units in the Imhoff Batteries A, B, and C; and replace one air handling unit in the tunnel from the Central Heat Building. Digester Upgrades for Class A Biosolids, CWRP Project will include changes to existing digesters and sludge heating process. New heat exchangers and steam injectors will be provided. Project will include new digester gas piping, new controls for sludge pumping, digester operation and modifications of existing digester floating covers. Reservoir, LWRP Construction of a reservoir to temporarily store wet weather flows near the Lemont Water Reclamation Plant. Roof Renovation, Lockport Powerhouse Repair and renovate existing Powerhouse Roof. Touhy Avenue Bridge Rehabilitation and Repairs of other Bridges on the North Shore Channel, NSA Replace concrete deck. Repair concrete abutment walls, wing walls and piers. Replace base plates and bearings. Replace deteriorated steel stringers. Replace expansion joints. Repair slope protection. Lockport Power House Sluice Gates Replacement, SSA One of the sluice gates in Bay 7 is stuck in position and is inoperable. Another gate is experiencing significant leakage. The sluice gates in Bay 3 and 4 are also having difficulties in operation. The bulkhead system will be installed on Bay 3, 4 and 7. After the bulkhead system is in place, the sluice gates and steel guides will be replaced. The underwater concrete structure will be rehabilitated. The gates are over 45 years old, served their useful life, and now need replacement. Battery E, NSWRP New primary settling tanks, aeration tanks, and final settling tanks comprising Battery E. All major influent and effluent conduits, power distribution, force mains and air mains. Stop Log Gates and Diversion Pumps at Wilmette Pumping Station and Evanston Pumping Station Repairs, NSA Installation of a bulkhead structure at the Wilmette Diversion Gate that would isolate the date for inspection and maintenance purposes. Installation of two diversion pumps. The project also includes replacement of screen, concrete repairs and HVAC modifications at the Evanston Pump Station. Underground Potable and Effluent Water Piping Upgrades, NSWRP Replacing and upgrading areas of effluent and potable water piping that were determined to be in need of immediate replacement by a recent hydraulic study of the plant. Also includes the replacement of some condensate piping. 363 363

METROPOLITAN WATER RECLAMATION DISTRICT OF GREATER CHICAGO 2009 BUDGET DESCRIPTION OF CAPITAL PROJECTS (continued) 06-151-3V 06-154-3S 06-155-3S R & D Laboratory Facility, SWRP New Laboratory building to house all analytical and research laboratories and related offices for the M&R Department. Summit Conduit Rehabilitation, SSA Project consists of rehabilitating 1,650 feet of 6-foot ovoid/semi-elliptic/elliptic sewer by cured-inplace lining/slip lining/ segmental lining method and inlet and outlet structures by spray-on products. Salt Creek Intercepting Sewer 2 Rehabilitation, SSA Project consists of rehabilitating 30,000 feet of sewer ranging in size from 12 inch circular to 7' x 7' semi-elliptic sewer by cured-in-place and/or slip lining process and lining approx. 72 manholes. 06-156-3P 06-157-3P 06-158-3S 06-212-3M 06-213-2M Drain Valves at Scum Conc. & Post Bldg. and Support Structures at Grit Tanks Replacement, SWRP The drain valves and associated piping need to be removed and replaced in the Southwest Scum Concentration Building. New drain pans and drain valves are required in the Post Digestion Building. Isolation valves are needed on the water piping for the sludge heat exchangers for Digesters 13-24. Remove and replace cantilever support structures at the aerated grit tanks. Diffuser Plate Replacement - Batteries C & D, SWRP Remove and replace the drop piping, diffuser plates and air lifts in Battery C. Remove and replace the drop piping, diffuser plates and air lifts in Battery D. Remove and replace the mixed liquor and return activated sludge channel piping and diffusers in Battery D. Des Plaines River Intercepting Sewer Rehabilitation, SSA Project consists of rehabilitating approximately 18,000 feet of sewer ranging in size from 20 inch circular to 8' x 4'-6" semi-elliptic conduit and approximately 52 manholes by spray-on product. Calumet TARP Pumping Station Pumps E1/W1 Improvements, CWRP Replace existing 28.8 MGD pumps with larger 72 MGD pumps. The pumps will be variable frequency controlled (VFD) controlled with the VFDs being housed in grade level structure, also being built for this project. HVAC Improvements at 95th, 122nd, & 125th St. Pumping Stations, CSA Replacement of HVAC systems at 95th St., 122nd St., and 125th St. Pump Stations and also at Calumet Digesters, Clusters 1 & 2, and Control Room. 06-215-3D 06-216-3E Lagoons 3 and 4 Lining, CWRP Lining and paving of bottom of lagoons, retaining wall construction, protection of side slopes of the lagoons, construction of new draw-off boxes, modifications to the sludge and supernatant draw-off pipe line, and all other ancillary features as needed. Electrical Upgrades, CWRP, CSA At Calumet WRP, replace low level pump variable frequency drives; replace digester motor control centers 301, 304, 305; upgrade fire and gas alarm systems into DCS at Digesters; and add miscellaneous controls from Digester Control Room to DCS. At Melvina Ditch, replace eddy current drives for Pumps 2 and 3. At Palos Hills P.S., add more pumps. At 122nd Street P.S., replace Motor Control Center. 364 364

METROPOLITAN WATER RECLAMATION DISTRICT OF GREATER CHICAGO<br />

2009 BUDGET<br />

DESCRIPTION OF CAPITAL PROJECTS (continued)<br />

06-151-3V<br />

06-154-3S<br />

06-155-3S<br />

R & D Laboratory Facility, SWRP<br />

New Laboratory building to house all analytical and research laboratories and related offices for the<br />

M&R Department.<br />

Summit Conduit Rehabilitation, SSA<br />

Project consists of rehabilitating 1,650 feet of 6-foot ovoid/semi-elliptic/elliptic sewer by cured-inplace<br />

lining/slip lining/ segmental lining method and inlet and outlet structures by spray-on products.<br />

Salt Creek Intercepting Sewer 2 Rehabilitation, SSA<br />

Project consists of rehabilitating 30,000 feet of sewer ranging in size from 12 inch circular to 7' x 7'<br />

semi-elliptic sewer by cured-in-place and/or slip lining process and lining approx. 72 manholes.<br />

06-156-3P<br />

06-157-3P<br />

06-158-3S<br />

06-212-3M<br />

06-213-2M<br />

Drain Valves at Scum Conc. & Post Bldg. and Support Structures at Grit Tanks Replacement, SWRP<br />

The drain valves and associated piping need to be removed and replaced in the Southwest Scum<br />

Concentration Building. New drain pans and drain valves are required in the Post Digestion<br />

Building. Isolation valves are needed on the water piping for the sludge heat exchangers for<br />

Digesters 13-24. Remove and replace cantilever support structures at the aerated grit tanks.<br />

Diffuser Plate Replacement - Batteries C & D, SWRP<br />

Remove and replace the drop piping, diffuser plates and air lifts in Battery C. Remove and replace<br />

the drop piping, diffuser plates and air lifts in Battery D. Remove and replace the mixed liquor and<br />

return activated sludge channel piping and diffusers in Battery D.<br />

Des Plaines River Intercepting Sewer Rehabilitation, SSA<br />

Project consists of rehabilitating approximately 18,000 feet of sewer ranging in size from 20 inch<br />

circular to 8' x 4'-6" semi-elliptic conduit and approximately 52 manholes by spray-on product.<br />

Calumet TARP Pumping Station Pumps E1/W1 Improvements, CWRP<br />

Replace existing 28.8 MGD pumps with larger 72 MGD pumps. The pumps will be variable<br />

frequency controlled (VFD) controlled with the VFDs being housed in grade level structure, also<br />

being built for this project.<br />

HVAC Improvements at 95th, 122nd, & 125th St. Pumping Stations, CSA<br />

Replacement of HVAC systems at 95th St., 122nd St., and 125th St. Pump Stations and also at<br />

Calumet Digesters, Clusters 1 & 2, and Control Room.<br />

06-215-3D<br />

06-216-3E<br />

Lagoons 3 and 4 Lining, CWRP<br />

Lining and paving of bottom of lagoons, retaining wall construction, protection of side slopes of the<br />

lagoons, construction of new draw-off boxes, modifications to the sludge and supernatant draw-off<br />

pipe line, and all other ancillary features as needed.<br />

Electrical Upgrades, CWRP, CSA<br />

At Calumet WRP, replace low level pump variable frequency drives; replace digester motor control<br />

centers 301, 304, 305; upgrade fire and gas alarm systems into DCS at Digesters; and add<br />

miscellaneous controls from Digester Control Room to DCS. At Melvina Ditch, replace eddy current<br />

drives for Pumps 2 and 3. At Palos Hills P.S., add more pumps. At 122nd Street P.S., replace Motor<br />

Control Center.<br />