METROPOLITAN WATER RECLAMATION DISTRICT OF GREATER CHICAGO<br />

2009 BUDGET<br />

DESCRIPTION OF CAPITAL PROJECTS (continued)<br />

03-122-3S<br />

Upper Des Plaines Intercepting Sewers 12 & 13B Rehabilitation, SSA<br />

Project consists of rehabilitating 3.5' diameter 3,700 foot long sewer and 6 manholes in Bryn Mayer<br />

Avenue in the Village of Rosemont; and 27" diameter, 2,650 foot long sewer and 8 manholes in<br />

Lawrence Avenue in the Village of Schiller Park.<br />

03-296-3M<br />

04-015-3V<br />

Installation of Central Boiler Facility, Calumet WRP<br />

A central boiler facility at Calumet WRP is required to satisfy the additional heating demands of new<br />

infrastructure additions, i.e. influent pumping station, TARP valve chamber, grit dewatering facility,<br />

primary settling tanks, and new laboratory building. Existing heating demands will also be handled<br />

from the new central boiler facility.<br />

New and planned process facilities at the Calumet WRP could require the plant to add and maintain<br />

up to 16 boilers, located across the plant. Construction of a Central Boiler Facility will consolidate all<br />

steam loads to 5 large boilers in one location. This will reduce labor costs by eliminating the need for<br />

hiring an additional operating engineer, and eliminating the need for additional contracted<br />

maintenance services. This results in an annual labor savings of $260,000.<br />

Storage Building, NSWRP<br />

A new storage building for items secured through the Procurement and Materials Management and<br />

Maintenance and Operations Departments.<br />

04-125-3S<br />

Upper Des Plaines Pump Station Rehabilitation and TARP Connection, SSA<br />

Structural/Architectural, Mechanical and Electrical Improvements to P.S. - New Pumps, Lighting,<br />

HVAC and design of gated diversion structure. Structure to intercept flows during peak periods and<br />

divert to TARP drop shaft. Located at North Ave. and Thatcher, River Forest, IL.<br />

04-128-3P<br />

Westside Primary Settling Tanks - Battery A Imhoff Replacement, SWRP<br />

The Imhoff tanks are at the end of their useful life. This project will provide conventional primary<br />

treatment to flows through the Westside Plant by converting the existing Imhoff tanks to circular<br />

primary tanks. Nine 150 ft. diameter tanks will be constructed in each of the existing batteries A, B,<br />

and C of the Imhoff tank area. Construction will be phased to do one battery at a time.<br />

Currently, the sludge that is digested in the Imhoff tanks produces gas, but the gas is not captured.<br />

The Imhoff tanks will be replaced with primary settling tanks. The sludge will be sent from the<br />

primary tanks to the digesters, where the gas will be captured and used in the plant’s central boiler<br />

facility as a heating fuel. The equivalent heating value of the digester gas compared to natural gas, at<br />

today’s prices, is approximately $700,000 per year. This project will increase the amount of digester<br />

gas used in the plant by 15%, thus reducing the District's reliance on natural gas.<br />

04-129-3P<br />

Westside Grit Handling Improvements, SWRP<br />

Convert a portion of the existing Westside skimming tanks into grit removal basins. Involves<br />

modification to flow distribution and collection channels, demolition of the existing tanks and<br />

construction of new grit collection tanks. New grit slurry pumping and washing facilities will be<br />

provided. Tanks will be covered for odor control.<br />

04-130-3M<br />

Digester Upgrades for Class A Biosolids, SWRP<br />

Modifications to existing 24 anaerobic digesters to enable operation as a sequential batch temperature<br />

phased anaerobic digestion mode for production of Class A biosolids. Modifications to existing<br />

sludge holding tanks, new heat exchangers, heat recovery units, steam injectors, pumping facilities<br />

and replacement of floating covers to fixed covers on 12 digesters.<br />

360<br />