METROPOLITAN WATER RECLAMATION DISTRICT OF GREATER CHICAGO 2009 BUDGET Projects for 2009 Award 91-177-CE Distributed Control System for Solids Processes at SWRP, MSPS and other $ 39,000,000 Remote Locations, SSA 96-114-2P Sludge Thickening Facilities, SWRP 173,700,000 01-101-1M Biosolids Processing Facility – Pelletizer Plant, SWRP 89,172,000 02-111-3M TARP Pumps Rehabilitation in North Pump House, MSPS 3,000,000 03-122-3S Upper Des Plaines Intercepting Sewers 12 & 13B Rehabilitation, SSA 1,380,000 04-131-2D C/D Service Tunnel Rehabilitation - Phase I, SWRP 5,200,000 05-147-2M HVAC Improvements, SWRP 5,000,000 06-154-3S Summit Conduit Rehabilitation, SSA 1,700,000 06-155-3S Salt Creek Intercepting Sewer 2 Rehabilitation, SSA 25,000,000 06-157-3P∴ Diffuser Plate Replacement - Batteries C & D, SWRP 20,000,000 07-162-2S** Westdale Gardens Pumping Station & Force Main, Northwest 8A Extension 2,200,000 A, SSA 07-163-3M R & D Building HVAC Improvements, SWRP 7,400,000 07-168-3P Scum Concentration, Post Centrifuge Building, Preliminary Tank and 4,000,000 Elevator Improvements, SWRP Racine Avenue PS 08-170-3D Office, Shop and Storage Facility Service Tunnel Rehabilitation and Paving 5,000,000 of B&F Streets, SWRP 08-171-3P Westside Imhoff Battery A and Skimming Tank Demolition, SWRP 30,000,000 08-173-2V Aquatic Ecology and Water Quality Equipment Storage Building, SWRP 600,000 Total $ 412,352,000 Projects Under Development 73-161-DH McCook Reservoir Expanded Stage 2 Overburden Removal, SSA $ 27,000,000 91-177-DE Distributed Control System for Westside, SWRP 17,500,000 01-103-AS 39th Street Conduit Rehabilitation - Phase II and 43 rd St. Structure 25,000,000 Rehabilitation, SSA 02-113-3P Final Clarifier Collectors Replacement at Batteries A, B & C, SWRP 13,900,000 04-128-3P Westside Primary Settling Tanks - Batteries A Imhoff Replacement, SWRP 150,000,000 04-129-3P Westside Grit Handling Improvements, SWRP 130,000,000 04-132-3D C/D Service Tunnel and Connecting Tunnel Rehabilitation - Phase 2, SWRP 3,500,000 04-133-3D A/B Service Tunnel Rehabilitation - Phase 3, SWRP 2,500,000 04-134-3D A/B & C/D Service Tunnels Rehabilitation - Phase 4, SWRP 3,500,000 04-135-3P Westside Circular Primary Settling Tanks – Battery B Imhoff Replacement, 150,000,000 SWRP 05-146-3M Mainstream South Pump House TARP Pumps Rehabilitation, SWRP 4,000,000 06-151-3V R & D Laboratory Facility at Stickney WRP 80,000,000 06-158-3S Des Plaines River Intercepting Sewer Rehabilitation, SSA 8,400,000 08-172-3S Inverted Siphon Reconstruction, SSA 44,000,000 08-862-2D** Lockport Powerhouse Interior North Wall Repairs, SSA 650,000 Total $ 659,950,000 Stickney Service Area Grand Total $ 1,410,512,000 351 351

METROPOLITAN WATER RECLAMATION DISTRICT OF GREATER CHICAGO 2009 BUDGET North Side WRP LAKE MICHIGAN NORTH SERVICE AREA (NSA) Hanover Park WRP Egan WRP Kirie WRP North Side Water Reclamation Plant Projects Under Construction (with estimated completion date) Estimated Construction Cost 02-013-3E Electrical Distribution Improvements, NSA (10/2009) $ 2,877,000 04-825-3M Install New Blower No. 2 at SWRP and Replace Blower Nos. 1 and 7 at 4,941,000 NSWRP (8/2009) Total $ 7,818,000 Projects for 2009 Award 02-010-3S Evanston Intercepting Sewer Orrington Avenue Leg Rehabilitation, NSA $ 5,977,000 05-018-2S Sewer & Structure Rehabilitation, NSA, SSA 5,000,000 05-834-2D ** Touhy Avenue Bridge Rehabilitation and Repairs of other Bridges on the 2,500,000 North Shore Channel, NSA 06-024-2M Underground Potable and Effluent Water Piping Upgrades, NSWRP 1,000,000 06-363-3D O'Hare CUP Reservoir Repair & Rehabilitation, NSA 6,500,000 06-843-3E Switchgear Replacement at Devon & Webster Instream Aeration Stations and 2,000,000 O'Hare CUP Reservoir & Emergency Generator Installation at LASMA and Bartlett P.S. 07-027-3S Northside Sludge Pipeline Replacement - Section 1, NSA 16,600,000 07-028-3S Harms Road 2 Rehabilitation, NSA 5,400,000 08-040-3P Rehabilitation of Fine Bubble Diffuser System, NSWRP 2,000,000 08-865-3P Aeration Tanks and Elevators Rehabilitation, NSWRP, KWRP, EWRP 20,400,000 Total $ 67,377,000 Projects Under Development 97-090-2P Battery D Air Diffuser System Replacement, NSWRP $ 6,000,000 04-015-3V Storage Building, NSWRP 4,210,000 06-020-3P Battery E, NSWRP 315,000,000 06-023-3P∴ Stop Logs and Diversion Pumps at Wilmette Pumping Station & Evanston 6,500,000 Pumping Station Repairs, NSA 07-030-3D North Branch of the Chicago River and North Shore Channel Restoration 6,300,000 08-034-3S Inverted Siphon Reconstruction, NSA 48,000,000 08-035-3V∴ Data Center, North Side WRP 10,000,000 Total $ 396,010,000 352 352

METROPOLITAN WATER RECLAMATION DISTRICT OF GREATER CHICAGO<br />

2009 BUDGET<br />

Projects for 2009 Award<br />

91-177-CE Distributed Control System for Solids Processes at SWRP, MSPS and other<br />

$ 39,000,000<br />

Remote Locations, SSA<br />

96-114-2P Sludge Thickening Facilities, SWRP 173,700,000<br />

01-101-1M Biosolids Processing Facility – Pelletizer Plant, SWRP 89,172,000<br />

02-111-3M TARP Pumps Rehabilitation in North Pump House, MSPS 3,000,000<br />

03-122-3S Upper Des Plaines Intercepting Sewers 12 & 13B Rehabilitation, SSA 1,380,000<br />

04-131-2D C/D Service Tunnel Rehabilitation - Phase I, SWRP 5,200,000<br />

05-147-2M HVAC Improvements, SWRP 5,000,000<br />

06-154-3S Summit Conduit Rehabilitation, SSA 1,700,000<br />

06-155-3S Salt Creek Intercepting Sewer 2 Rehabilitation, SSA 25,000,000<br />

06-157-3P∴ Diffuser Plate Replacement - Batteries C & D, SWRP 20,000,000<br />

07-162-2S** Westdale Gardens Pumping Station & Force Main, Northwest 8A Extension<br />

2,200,000<br />

A, SSA<br />

07-163-3M R & D Building HVAC Improvements, SWRP 7,400,000<br />

07-168-3P Scum Concentration, Post Centrifuge Building, Preliminary Tank and<br />

4,000,000<br />

Elevator Improvements, SWRP Racine Avenue PS<br />

08-170-3D Office, Shop and Storage Facility Service Tunnel Rehabilitation and Paving<br />

5,000,000<br />

of B&F Streets, SWRP<br />

08-171-3P Westside Imhoff Battery A and Skimming Tank Demolition, SWRP 30,000,000<br />

08-173-2V Aquatic Ecology and <strong>Water</strong> Quality Equipment Storage Building, SWRP 600,000<br />

Total $ 412,352,000<br />

Projects Under Development<br />

73-161-DH McCook Reservoir Expanded Stage 2 Overburden Removal, SSA $ 27,000,000<br />

91-177-DE Distributed Control System for Westside, SWRP 17,500,000<br />

01-103-AS 39th Street Conduit Rehabilitation - Phase II and 43 rd St. Structure<br />

25,000,000<br />

Rehabilitation, SSA<br />

02-113-3P Final Clarifier Collectors Replacement at Batteries A, B & C, SWRP 13,900,000<br />

04-128-3P Westside Primary Settling Tanks - Batteries A Imhoff Replacement, SWRP 150,000,000<br />

04-129-3P Westside Grit Handling Improvements, SWRP 130,000,000<br />

04-132-3D C/D Service Tunnel and Connecting Tunnel Rehabilitation - Phase 2, SWRP 3,500,000<br />

04-133-3D A/B Service Tunnel Rehabilitation - Phase 3, SWRP 2,500,000<br />

04-134-3D A/B & C/D Service Tunnels Rehabilitation - Phase 4, SWRP 3,500,000<br />

04-135-3P Westside Circular Primary Settling Tanks – Battery B Imhoff Replacement,<br />

150,000,000<br />

SWRP<br />

05-146-3M Mainstream South Pump House TARP Pumps Rehabilitation, SWRP 4,000,000<br />

06-151-3V R & D Laboratory Facility at Stickney WRP 80,000,000<br />

06-158-3S Des Plaines River Intercepting Sewer Rehabilitation, SSA 8,400,000<br />

08-172-3S Inverted Siphon Reconstruction, SSA 44,000,000<br />

08-862-2D** Lockport Powerhouse Interior North Wall Repairs, SSA 650,000<br />

Total $ 659,950,000<br />

Stickney Service Area Grand Total $ 1,410,512,000<br />