19.01.2015 Views

Budget Message / Highlights - Metropolitan Water Reclamation ...

Budget Message / Highlights - Metropolitan Water Reclamation ...

Budget Message / Highlights - Metropolitan Water Reclamation ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

METROPOLITAN WATER RECLAMATION DISTRICT OF GREATER CHICAGO<br />

2009 BUDGET<br />

50000 ENGINEERING - CORPORATE FUND OBJECTIVES AND PROGRAM SUMMARY<br />

PROGRAMS BY PRIORITY: 2007 <strong>Budget</strong>ed Change<br />

Number Name Actuals Positions Dollars Dollars Percent<br />

4000 Flood and Pollution Control $941,022 2009 0 $1,666,000 $86,900 5.5<br />

2008 0 $1,579,100<br />

4216 Bridge and Road Maintenance $4,004 2009 0 $401,000 $336,500 521.7 g)<br />

2008 0 $64,500<br />

4219 Maintenance of <strong>Water</strong>ways-All Other (General) $467,394 2009 0 $50,000 ($127,000) (71.8) h)<br />

2008 0 $177,000<br />

4700 Flood and Pollution Control Design $468,274 2009 0 $1,215,000 ($122,600) (9.2) i)<br />

2008 0 $1,337,600<br />

4800 Flood and Pollution Control Construction $1,350 2009 0 $0 $0 0.0<br />

2008 0 $0<br />

5000 Solids Disposal $0 2009 0 $3,285,000 $1,600,600 95.0<br />

2008 0 $1,684,400<br />

5800 Solids Disposal Construction $0 2009 0 $3,285,000 $1,600,600 95.0 j)<br />

2008 0 $1,684,400<br />

7000 General Support $0 2009 0 $225,000 ($750,000) (76.9) k)<br />

2008 0 $975,000<br />

Totals $4,324,876 2009 34 $17,566,400 $1,539,900 9.6%<br />

2008 34 $16,026,500<br />

g) Increase due to the planned award of project 05-834-2D Touhy Avenue bridge rehabilitation and repairs of other bridges on the North Shore<br />

Channel, NSA.<br />

h) Decrease due to the reduction of need for demolition of structures.<br />

i) Decrease due to anticipated completion of project 07-859-1C Economic and Environmental Assessment of <strong>Water</strong> Quality Chicago Area <strong>Water</strong>ways<br />

System.<br />

j) Increase due to project 01-198-AD Demolition of Sludge Disposal Building, Rehabilitation of Blower House and Course Screen building.<br />

k) Decrease due to the reduction of professional surveying requirements for 2009.<br />

335<br />

335

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!