19.01.2015 Views

Budget Message / Highlights - Metropolitan Water Reclamation ...

Budget Message / Highlights - Metropolitan Water Reclamation ...

Budget Message / Highlights - Metropolitan Water Reclamation ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

METROPOLITAN WATER RECLAMATION DISTRICT OF GREATER CHICAGO<br />

2009 BUDGET<br />

69000 M and O - STICKNEY DIVISION OBJECTIVES AND PROGRAM SUMMARY<br />

PROGRAMS BY PRIORITY: 2007 <strong>Budget</strong>ed Change<br />

Number Name Actuals Positions Dollars Dollars Percent<br />

3300 Dewatering $7,664,900 2009 34 $8,228,876 $365,241 4.6 h)<br />

2008 35 $7,863,635<br />

3900 Solids Processing - Indirect Costs $8,018,800 2009 57 $8,021,519 $151,739 1.9 i)<br />

2008 57 $7,869,780<br />

4000 Flood and Pollution Control $720,800 2009 5 $923,374 ($38,173) (4.0)<br />

2008 5 $961,547<br />

4200 <strong>Water</strong>ways Control and Stormwater Reservoirs $179,600 2009 3 $191,300 $3,900 2.1<br />

2008 3 $187,400<br />

4210 Maintenance of <strong>Water</strong>ways $209,700 2009 0 $90,300 $10,300 12.9<br />

2008 0 $80,000<br />

4400 Aeration Facilities $0 2009 0 $0 ($99,000) (100.0) j)<br />

2008 0 $99,000<br />

4900 Flood and Pollution Control - Indirect Costs $331,500 2009 2 $641,774 $46,627 7.8<br />

2008 2 $595,147<br />

5000 Solids Utilization $10,368,000 2009 13 $9,749,053 $227,570 2.4<br />

2008 13 $9,521,483<br />

5100 Solids Drying $2,430,600 2009 1 $87,200 $600 0.7<br />

2008 1 $86,600<br />

5200 Solids Distribution $5,543,900 2009 2 $7,624,635 $172,541 2.3 k)<br />

2008 2 $7,452,094<br />

5900 Solids Utilization - Indirect Costs $2,393,500 2009 10 $2,037,218 $54,429 2.7<br />

2008 10 $1,982,789<br />

7000 General Support $2,451,000 2009 20 $2,913,749 ($76,660) (2.6)<br />

2008 20 $2,990,409<br />

Totals $93,732,390 2009 464 $103,563,000 $7,923,400 8.3% *<br />

2008 461 $95,639,600<br />

$0<br />

h) Increase due to: furnish, deliver, and install a new liquid CO2 storage tank ($250,000); maintenance of contol system at post digestion<br />

centrifuge ($55,000); and maintenance of switchgear at post digestion last performed in 2005 ($50,000).<br />

i) Increase due to replacement of electric personnel carriers ($80,200) and replacement parts for post digestion centrifuges ($74,800).<br />

j) Correction of cost assignment to Program 2212 - Blowers and Air Mains, from prior years incorrect Program 4410 - Instream Aeration Facilities.<br />

k) Increase due to contracted rate adjustment for pelletizer operation in 2009 ($200,000).<br />

* The 2009 position total for the Stickney Service Area is 464. There are 6 additional positions funded by the Stormwater Management Fund.<br />

314<br />

314

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!