19.01.2015 Views

Budget Message / Highlights - Metropolitan Water Reclamation ...

Budget Message / Highlights - Metropolitan Water Reclamation ...

Budget Message / Highlights - Metropolitan Water Reclamation ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

METROPOLITAN WATER RECLAMATION DISTRICT OF GREATER CHICAGO<br />

2009 BUDGET<br />

69000 M and O - STICKNEY DIVISION OBJECTIVES AND PROGRAM SUMMARY<br />

OBJECTIVES BY PRIORITY: Cost Percent<br />

1. COLLECTION AND TREATMENT: The Stickney Service Area will collect and treat approximately<br />

300 billion gallons of sewage through its treatment facilities. $65,342,527 63.1%<br />

Design: Flows CBOD * SS *<br />

Stickney <strong>Water</strong> <strong>Reclamation</strong> Plant 1,200 MGD 10 mg/l 12 mg/l<br />

* NPDES monthly effluent quality standards: CBOD - Carbonaceous Biochemical Oxygen Demand<br />

SS - Suspended Solids<br />

2. SOLIDS PROCESSING: The Stickney Service Area will remove 155,000 dry tons and process solids from<br />

200,000 dry tons of concentrated sewage (includes 45,000 from North Side Plant) through various systems<br />

including heated digestion, centrifuging, concentration, and aging low solids sludge and centrifuge cake in<br />

lagoons. $24,634,297 23.8%<br />

3. SOLIDS UTILIZATION: The Stickney Service Area will provide support to utilize 101,000 dry tons of further<br />

dewatered sewage for application at final utilization sites such as farm application and as daily and final<br />

cover in sanitary landfills. $9,749,053 9.4%<br />

4. FLOOD AND POLLUTION CONTROL: The Stickney Service Area will work to prevent local area flooding<br />

through the operation of 6 retention reservoirs, in cooperation with local communities. They will also<br />

work to maintain the quality of the waterways system and associated District property in cooperation with<br />

the debris boats and the channel maintenance crews. $923,374 0.9%<br />

5. GENERAL SUPPORT: The Stickney Service Area provides technical and administrative support for other<br />

departments not directly related to the operational activities of Collection and Treatment, Solids<br />

Processing, Flood and Pollution Control, and Solids Utilization. $2,913,749 2.8%<br />

Total $103,563,000 100.0%<br />

MEASURABLE GOALS: 2007 2008 2009<br />

Unit of Measure Actual Estimated Proposed<br />

1. The Stickney Service Area will collect and treat approximately 300<br />

billion gallons of sewage in 2009. billion gallons 268 300 300<br />

2. The Stickney Service Area will remove and process solids from 200,000<br />

dry tons of concentrated sewage. dry tons process solids 156,316 200,000 200,000<br />

3. The Stickney Service Area will obtain 100 percent permit compliance in<br />

2009 for NPDES effluent limits. percent 100% 100% 100%<br />

4. The Stickney Service Area will provide support to utilize 101,000 dry<br />

tons of biosolids in 2009. dry tons 89,517 97,000 101,000<br />

312<br />

312

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!