METROPOLITAN WATER RECLAMATION DISTRICT OF GREATER CHICAGO<br />

2009 BUDGET<br />

68000 M and O - CALUMET DIVISION OBJECTIVES AND PROGRAM SUMMARY<br />

PROGRAMS BY PRIORITY: 2007 <strong>Budget</strong>ed Change<br />

Number Name Actuals Positions Dollars Dollars Percent<br />

1000 Collection $11,301,860 2009 72 $13,047,797 $2,587 0.0<br />

2008 71 $13,045,210<br />

1100 Surface Interceptor Systems $1,580,699 2009 15 $1,885,730 $86,309 4.8<br />

2008 15 $1,799,421<br />

1200 Tunnel and Reservoir System $3,145,872 2009 14 $4,182,823 $227,350 5.7 a)<br />

2008 14 $3,955,473<br />

1300 Pumping Station Facilities $2,874,535 2009 15 $2,978,530 $148,808 5.3 a)<br />

2008 15 $2,829,722<br />

1900 Collection - Indirect Costs $3,700,754 2009 28 $4,000,714 ($459,880) (10.3) b)<br />

2008 27 $4,460,594<br />

2000 Treatment $12,604,447 2009 90 $17,317,547 $248,403 1.5<br />

2008 88 $17,069,144<br />

2000 Pre-Treatment $673,261 2009 7 $614,345 ($1,598) (0.3)<br />

2008 7 $615,943<br />

2100 Primary Treatment $926,970 2009 11 $1,425,233 $309,694 27.8 c)<br />

2008 11 $1,115,539<br />

2200 Secondary Treatment $4,580,011 2009 23 $4,701,846 $138,359 3.0 d)<br />

2008 24 $4,563,487<br />

2300 Tertiary Treatment $67,203 2009 1 $154,900 $46,101 42.4 e)<br />

2008 0 $108,799<br />

2400 Wetlands $63,545 2009 0 $0 $0 0.0<br />

2008 0 $0<br />

2900 Treatment - Indirect Costs $6,293,457 2009 48 $10,421,223 ($244,153) (2.3) f)<br />

2008 46 $10,665,376<br />

3000 Solids Processing $7,623,393 2009 57 $9,516,658 $1,290,495 15.7<br />

2008 57 $8,226,163<br />

3100 Thickening $597,657 2009 8 $587,343 ($7,951) (1.3)<br />

2008 9 $595,294<br />

3200 Stabilization $1,758,240 2009 11 $1,990,666 $374,236 23.2 g)<br />

2008 11 $1,616,430<br />

a) Increased requests for electrical service ($324,900) due to higher cost.<br />

b) Decrease due to 2008 receipt of replacement sewer control truck ($150,000) and transferral of pump and blower elevator improvement funding<br />

responsibility to the Capital Improvement Bond Fund ($365,000).<br />

c) Increase request to rehabilitate four preliminary tanks ($300,000).<br />

d) Increase due to increased electricity request ($215,500) offset by receipt of new sodium hypochlorite tank ($40,000).<br />

e) Increase due to increased request for sodium hypochlorite used for odor control and cessation of using hydrogen peroxide for same.<br />

f) Decrease due to completion of major roof repairs and replacement in 2008 ($462,000); offset by new one-time request<br />

for a replacement truck crane with clam bucket ($246,000).<br />

g) Increase due to increased electrical service cost ($81,000) and cyclical requests: refurbish digester breakers ($100,000); replace four<br />

digester draw pumps ($120,000); and replacement of sludge pump piping ($50,000).<br />