19.01.2015 Views

Budget Message / Highlights - Metropolitan Water Reclamation ...

Budget Message / Highlights - Metropolitan Water Reclamation ...

Budget Message / Highlights - Metropolitan Water Reclamation ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

METROPOLITAN WATER RECLAMATION DISTRICT OF GREATER CHICAGO<br />

2009 BUDGET<br />

67000 M and O - NORTH DIVISION OBJECTIVES AND PROGRAM SUMMARY<br />

PROGRAMS BY PRIORITY: 2007 <strong>Budget</strong>ed Change<br />

Number Name Actuals Positions Dollars Dollars Percent<br />

3000 Solids Processing $4,356,560 2009 30 $5,130,595 $70,995 1.4<br />

2008 28 $5,059,600<br />

3100 Thickening $730,879 2009 7 $793,071 $38,318 5.1<br />

2008 7 $754,753<br />

3200 Stabilization $957,908 2009 8 $1,065,290 ($30,923) (2.8)<br />

2008 7 $1,096,213<br />

3300 Dewatering $1,302,830 2009 7 $1,598,472 $198,760 14.2 e)<br />

2008 7 $1,399,712<br />

3900 Solids Processing - Indirect Costs $1,364,943 2009 8 $1,673,762 ($135,160) (7.5) f)<br />

2008 7 $1,808,922<br />

4000 Flood and Pollution Control $699,481 2009 5 $778,876 ($56,062) (6.7)<br />

2008 5 $834,938<br />

4200 <strong>Water</strong>ways Control and Stormwater Reservoirs $395,570 2009 4 $334,419 ($9,179) (2.7)<br />

2008 4 $343,598<br />

4210 Maintenance of <strong>Water</strong>ways $300 2009 0 $0 $0 0.0<br />

2008 0 $0<br />

4400 Aeration Facilities $206,232 2009 0 $293,400 ($62,300) (17.5) g)<br />

2008 0 $355,700<br />

4900 Flood and Pollution Control - Indirect Costs $97,379 2009 1 $151,057 $15,417 11.4<br />

2008 1 $135,640<br />

5000 Solids Utilization $1,444,789 2009 1 $1,460,172 ($38,460) (2.6)<br />

2008 1 $1,498,632<br />

5200 Solids Distribution $764,580 2009 0 $661,729 $34,882 5.6<br />

2008 0 $626,847<br />

5900 Solids Utilization - Indirect Costs $680,209 2009 1 $798,443 ($73,342) (8.4)<br />

2008 1 $871,785<br />

7000 General Support $471,460 2009 1 $469,181 $29,500 6.7<br />

2008 1 $439,681<br />

Totals $41,556,151 2009 279 $49,665,300 $2,465,900 5.2% *<br />

2008 273 $47,199,400<br />

e) Increase due to one-time purchase of borescope for the Egan WRP ($35,000), increased requests for Polymer contract ($120,000) and repairs to<br />

centrifuge at the Egan WRP ($100,000); offset by decreased request for conveyor parts at the Egan WRP ($55,000).<br />

f) Decrease due to 2008 installation of gas detection system at the Egan WRP ($144,000) and lower estimate for payments to Fox River WRD<br />

($88,000); offset by painting services at the Hanover Park WRP ($25,000), higher estimate for natural gas usage ($10,000) and transfer of three<br />

full-time positions from General Division to the North Service Area to reestablish separate M&O <strong>Budget</strong> Management Units ($60,000).<br />

g) Decrease due to lower estimate for electrical energy usage for the Devon and Webster Aeration Stations ($62,300).<br />

* The 2009 position total for the North Service Area is 279. There are three additional positions funded by the Stormwater Management Fund.<br />

273<br />

273

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!