METROPOLITAN WATER RECLAMATION DISTRICT OF GREATER CHICAGO 2009 BUDGET 66000 - 69000 M and O - ALL DIVISIONS OBJECTIVES AND PROGRAM SUMMARY PROGRAMS BY PRIORITY: 2007 Budgeted Change Number Name Actuals Positions Dollars Dollars Percent 4000 Flood and Pollution Control $4,579,055 2009 32 $6,311,983 $715,750 12.8 2008 31 $5,596,233 4200 Waterways Control and Stormwater Reservoirs $2,560,454 2009 24 $2,947,975 $1,035 0.0 2008 23 $2,946,940 4210 Maintenance of Waterways $248,153 2009 0 $343,046 $236,246 221.2 2008 0 $106,800 4300 Stormwater Management $64,611 2009 1 $62,800 ($35,800) (36.3) 2008 1 $98,600 4400 Aeration Facilities $1,032,129 2009 2 $1,660,870 $328,810 24.7 2008 2 $1,332,060 4900 Flood and Pollution Control - Indirect Costs $673,708 2009 5 $1,297,292 $185,459 16.7 2008 5 $1,111,833 5000 Solids Utilization $16,924,809 2009 51 $30,716,065 ($542,445) (1.7) 2008 53 $31,258,510 5100 Solids Drying $3,500,337 2009 10 $4,520,866 ($1,190,129) (20.8) 2008 10 $5,710,995 5200 Solids Distribution $8,924,407 2009 10 $18,267,079 $640,159 3.6 2008 10 $17,626,920 5900 Solids Utilization - Indirect Costs $4,500,065 2009 31 $7,928,120 $7,525 0.1 2008 33 $7,920,595 7000 General Support $3,425,526 2009 25 $3,977,780 $47,388 1.2 2008 25 $3,930,392 Totals $177,801,341 2009 1,046 $221,406,300 $11,537,600 5.5% * 2008 1,045 $209,868,700 * The 2009 position total for M&O is 1,046. There are an additional 36 positions funded by the Stormwater Management Fund while the operations remain in the M&O Department. Note: Explanations of significant changes are provided by individual division. 248 248

METROPOLITAN WATER RECLAMATION DISTRICT OF GREATER CHICAGO 2009 BUDGET 66000 - 69000 M and O - ALL DIVISIONS PERFORMANCE DATA Program 2007 2008 2009 Number Measurable Activity Title Actual Budgeted Estimated 1000-2900 Collection and Treatment Collect and Treat Sewage at Seven Treatment Facilities and Mil. Gallons 484,279 515,500 518,750 Through a Contract Agreement with the Fox River Water Cost $116,060,139 $130,588,139 $140,417,633 Reclamation District Cost/Mil. Gallons $239.66 $253.32 $270.68 3000 Solids Processing Remove and Process Solids from Concentrated Sewage Through Dry Tons 7,795,324 8,442,113 9,732,608 Various Systems Including Heated Digestion, Centrifuging, Cost $36,811,812 $38,495,426 $39,982,839 Concentration, and Aging Low Solids Sludge and Centrifuge Cake Cost/Dry Ton $4.72 $4.56 $4.11 in Lagoons 4000 Flood and Pollution Control Operation and Maintenance of the Waterways to Minimize Area Flooding and Pollution 4200 Minimize Area Flooding and Pollution of Lake Michigan Through Cost $1,455,009 $1,718,568 $1,526,809 the Continuous Control of Water Levels in Major Rivers and Canals Minimize Diversion of Lake Michigan Water in Accordance mil gal/year diversion 71,804 71,967 71,967 with the U.S. Supreme Court Decree Cost $425,423 $456,900 $462,953 Cost/mil gal/year $5.92 $6.35 $6.43 Operation of Retention Reservoirs Reservoirs 32,976 27,485 28,282 Cost $179,600 $187,400 $191,300 Cost/Reservoir $5.45 $6.82 $6.76 Generate Electricity at Lockport Powerhouse to Obtain KWH 44,586,717 36,000,000 45,000,000 Approximately $2,100,000 in Revenue Cost $500,422 $584,072 $766,913 Cost/KWH $0.0112 $0.0162 $0.0170 * Revenue Generated $1,756,855 $1,400,000 $2,100,000 4210 Maintenance of the Waterways and Canal Banks Within the Waterway Miles 745 166 166 Jurisdiction of the District. Activities Include Debris Removal, Cost $248,153 $106,800 $343,046 Insect and Rodent Control, Bridge Repair, and Aeration Costs Cost/Mile $333.15 $644.80 $2,071.14 Along Navigable (76 miles) and Non-Navigable (125 miles) Waterways 4300 Stormwater Management Cost $64,611 $98,600 $62,800 4400 Aeration Facilities Cost $1,032,129 $1,332,060 $1,660,870 4900 Flood and Pollution Control - Indirect Costs Cost $673,708 $1,111,833 $1,297,292 5000 Solids Utilization Utilize Further Dewatered Sewage for Application at Final Dry Tons 96,278 133,600 131,600 Utilization Sites Such as the Land Reclamation Fields in Fulton Total Cost $16,924,809 $24,458,510 $23,246,565 County, the Fischer Farm, Daily and Final Cover at Sanitary Total Cost/Dry Ton $175.79 $183.07 $176.65 Landfills, and Other Farm Applications 5271 Pelletizer Disposal Dry Tons 553 54,750 54,600 Control management and disposal of solids by private Cost $0 $6,800,000 $7,469,500 contracts Cost/Dry Ton $0.00 $124.20 $136.80 7000 General Support Technical and Administrative Support for Other Departments' Cost $3,425,526 $3,930,392 $3,977,780 Activities Indirectly Related to the Operational Activities of Collection and Treatment, Solids Processing, Flood and Pollution Control, and Solids Utilization Departmental Total $177,801,341 $209,868,700 $221,406,300 Note: Explanations of significant changes are provided by individual division. * Revenue Generated not included in total costs. 249 249

METROPOLITAN WATER RECLAMATION DISTRICT OF GREATER CHICAGO<br />

2009 BUDGET<br />

66000 - 69000 M and O - ALL DIVISIONS PERFORMANCE DATA<br />

Program 2007 2008 2009<br />

Number Measurable Activity Title Actual <strong>Budget</strong>ed Estimated<br />

1000-2900 Collection and Treatment<br />

Collect and Treat Sewage at Seven Treatment Facilities and Mil. Gallons 484,279 515,500 518,750<br />

Through a Contract Agreement with the Fox River <strong>Water</strong> Cost $116,060,139 $130,588,139 $140,417,633<br />

<strong>Reclamation</strong> District Cost/Mil. Gallons $239.66 $253.32 $270.68<br />

3000 Solids Processing<br />

Remove and Process Solids from Concentrated Sewage Through Dry Tons 7,795,324 8,442,113 9,732,608<br />

Various Systems Including Heated Digestion, Centrifuging, Cost $36,811,812 $38,495,426 $39,982,839<br />

Concentration, and Aging Low Solids Sludge and Centrifuge Cake Cost/Dry Ton $4.72 $4.56 $4.11<br />

in Lagoons<br />

4000 Flood and Pollution Control<br />

Operation and Maintenance of the <strong>Water</strong>ways to Minimize Area<br />

Flooding and Pollution<br />

4200 Minimize Area Flooding and Pollution of Lake Michigan Through Cost $1,455,009 $1,718,568 $1,526,809<br />

the Continuous Control of <strong>Water</strong> Levels in Major Rivers and Canals<br />

Minimize Diversion of Lake Michigan <strong>Water</strong> in Accordance mil gal/year diversion 71,804 71,967 71,967<br />

with the U.S. Supreme Court Decree Cost $425,423 $456,900 $462,953<br />

Cost/mil gal/year $5.92 $6.35 $6.43<br />

Operation of Retention Reservoirs Reservoirs 32,976 27,485 28,282<br />

Cost $179,600 $187,400 $191,300<br />

Cost/Reservoir $5.45 $6.82 $6.76<br />

Generate Electricity at Lockport Powerhouse to Obtain KWH 44,586,717 36,000,000 45,000,000<br />

Approximately $2,100,000 in Revenue Cost $500,422 $584,072 $766,913<br />

Cost/KWH $0.0112 $0.0162 $0.0170<br />

* Revenue Generated $1,756,855 $1,400,000 $2,100,000<br />

4210 Maintenance of the <strong>Water</strong>ways and Canal Banks Within the <strong>Water</strong>way Miles 745 166 166<br />

Jurisdiction of the District. Activities Include Debris Removal, Cost $248,153 $106,800 $343,046<br />

Insect and Rodent Control, Bridge Repair, and Aeration Costs Cost/Mile $333.15 $644.80 $2,071.14<br />

Along Navigable (76 miles) and Non-Navigable (125 miles) <strong>Water</strong>ways<br />

4300 Stormwater Management Cost $64,611 $98,600 $62,800<br />

4400 Aeration Facilities Cost $1,032,129 $1,332,060 $1,660,870<br />

4900 Flood and Pollution Control - Indirect Costs Cost $673,708 $1,111,833 $1,297,292<br />

5000 Solids Utilization<br />

Utilize Further Dewatered Sewage for Application at Final Dry Tons 96,278 133,600 131,600<br />

Utilization Sites Such as the Land <strong>Reclamation</strong> Fields in Fulton Total Cost $16,924,809 $24,458,510 $23,246,565<br />

County, the Fischer Farm, Daily and Final Cover at Sanitary Total Cost/Dry Ton $175.79 $183.07 $176.65<br />

Landfills, and Other Farm Applications<br />

5271 Pelletizer Disposal Dry Tons 553 54,750 54,600<br />

Control management and disposal of solids by private Cost $0 $6,800,000 $7,469,500<br />

contracts Cost/Dry Ton $0.00 $124.20 $136.80<br />

7000 General Support<br />

Technical and Administrative Support for Other Departments' Cost $3,425,526 $3,930,392 $3,977,780<br />

Activities Indirectly Related to the Operational Activities<br />

of Collection and Treatment, Solids Processing, Flood and<br />

Pollution Control, and Solids Utilization<br />

Departmental Total $177,801,341 $209,868,700 $221,406,300<br />

Note: Explanations of significant changes are provided by individual division.<br />