Operating Manual Hopper loader

Operating Manual Hopper loader Operating Manual Hopper loader

hosa.dryer.com
from hosa.dryer.com More from this publisher
19.01.2015 Views

METRO 0.5 to 1.5 Transport and setup 4 Connections 4.2.2 Fastening material/vacuum hose MATERIAL DAMAGE! CAUTION! Incorrectly attached material tubes cause transport problems and damage to the hopper loader. Lay out material/vacuum hose to the hopper loader with a sufficiently wide curve. Ground the hose. Fig. 4.4 – Flow direction [1] Flow direction with PU tubes Note the flow direction (PU tubes only, optional), (see figure 4.4). Incorrect installation direction may influence the transport output. Fig. 4.5 – Grounding material/vacuum hose [1] Wire spiral Remove the wire spiral [1] from the tube and bend it inwards to make it contact the hopper loader. Slide the material/vacuum hose on to the connection on the hopper loader and fasten the hose with a suitable hose band clip (see Figure 4.5). Edition: November 2005 19

4 Transport and setup Connections METRO 0.5 to 1.5 4.2.3 Electrical connection Connecting the control cable CAUTION! MATERIAL DAMAGE! Radiant heat and hot surfaces may damage the controller cable. Lay out the controller cable so it will not be damaged by the heat of downstream units (hot surfaces or radiant heat)! Fig. 4.6 – Connecting control cable METRO *C/J* [1] Control cable connection Fig. 4.7 – Connecting control cable METRO *P* [1] Control cable connection The electrical power is supplied from the controller via the controller cable (see figure 4.64.7). 20 Edition: November 2005

METRO 0.5 to 1.5<br />

Transport and setup 4<br />

Connections<br />

4.2.2 Fastening material/vacuum hose<br />

MATERIAL DAMAGE!<br />

CAUTION!<br />

Incorrectly attached material tubes cause transport problems and damage to the hopper<br />

<strong>loader</strong>.<br />

Lay out material/vacuum hose to the hopper <strong>loader</strong> with a sufficiently wide curve.<br />

Ground the hose.<br />

Fig. 4.4 – Flow direction<br />

[1] Flow direction with PU tubes<br />

Note the flow direction (PU tubes only, optional), (see figure 4.4). Incorrect installation direction<br />

may influence the transport output.<br />

Fig. 4.5 – Grounding material/vacuum hose<br />

[1] Wire spiral<br />

Remove the wire spiral [1] from the tube and bend it inwards to make it contact the hopper <strong>loader</strong>.<br />

Slide the material/vacuum hose on to the connection on the hopper <strong>loader</strong> and fasten the hose<br />

with a suitable hose band clip (see Figure 4.5).<br />

Edition: November 2005 19

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!