Operating Manual Hopper loader

Operating Manual Hopper loader Operating Manual Hopper loader

hosa.dryer.com
from hosa.dryer.com More from this publisher
19.01.2015 Views

METRO 0.5 to 1.5 Appendix 12 Pneumatics diagram 12.3 Pneumatics diagram 12.3.1 METRO 0.5 to 1.5 [1] Vacuum valve Edition: November 2005 55

A B C D E 2 A1 +ZSW PE + 24V M VACV PE 1 2 3 W5F1 PVC Steuerleitung 12x1mmý GNYE 1 2 3 -XS PE 1 2 3 +KK -X41 3PE 2 1 W5Y1 H05VV-F/F 3x0,75 BU BN 1 2 -5Y1 F 2 1 Vakuum Ventil Vacuum Valve Datum 18.10.2005 Bearb. EKA Gepr. nderung Datum Name Norm 1 2 3 GNYE 1 1 PE 2 2 -5H1 -5H2 +F16 Vakuum Vacuum Niveau Level Projekt: METRO C basic SPS (PLC)/SELVAC 27.11.2001 3 4 5 6 7 ANFO ONLP ONTS NIBE ZWVV RES RES 6 5 7 4 8 9 10 6 5 7 4 8 9 10 6 5 7 4 8 9 10 6 4 5 7PE 10 8 9 12 11 14 13 15PE W5B1 SENSOR 3x0,34 BK BN W5B2 SENSOR 4x0,34 BU W5Y2 H05VV-F/F 3x0,75 BK BN BU BU BN GNYE BN BU +F H-LOADER -5B1 1 2 3 4 BN BU -5B2 1 2 BK BK * ** BN BU +F Ï -5Y2 -5H3 -5S1 ** WH +F M-LOADER -5B1 +F16 * Option 1 ** Option 2 Anforderung Material Demand Material Ein Aus Alarm Niveau Beh„lter Zwangsverschluss On Off Alarm Level Hopper Operated flap Vers. Motan GmbH Max-Eyth-Weg 42 + F1 Kommission: Zeichng.Nr.: Urspr. Ers. f. Ers. d. 88316 Isny Steuerung Control (unit) = F1 REG Convey 280A-90.0.00 4 5 6 7 8 RES 11 11 11 16PE +KAUE/1 1.0 Blatt Gr.: 8 5 A B C D E F

METRO 0.5 to 1.5<br />

Appendix 12<br />

Pneumatics diagram<br />

12.3 Pneumatics diagram<br />

12.3.1 METRO 0.5 to 1.5<br />

[1] Vacuum valve<br />

Edition: November 2005 55

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!