reporting - Metropolitan Water Reclamation District of Greater Chicago
reporting - Metropolitan Water Reclamation District of Greater Chicago reporting - Metropolitan Water Reclamation District of Greater Chicago
Over 11,000 Stickney Asset Records • The Stickney WRP – Main Sewage Pumps up to 3500HP – Blowers up to 10,000HP – 37 Centrifuges – 96 Final Clarifiers – 6 Boiler, 4 capably of 80,000lbs/hr steam – Miles and miles of piping
Over 11,000 Stickney Asset Records • 6 Pumping Stations – Mainstream 550MGD, 8 pumps 3,600 – 17,500HP – Racine Ave 3.9BGD, 14 pumps 1,000 - 1,750HP • 103 TARP Control Structures • 4 Reservoirs
- Page 1 and 2: Maintenance at the Stickney Water R
- Page 3 and 4: Increase Productivity
- Page 5 and 6: Maintenance More than just firefigh
- Page 7: Maintenance Mission To ensure relia
- Page 11 and 12: SWRP M&O Org Chart Maintenance Mana
- Page 13 and 14: M&O Master Mechanics and Skilled Tr
- Page 15 and 16: Pre-Computerized Maintenance System
- Page 17 and 18: WORK ORDER BASICS Corrective Preven
- Page 19 and 20: Preventive/Predictive Maintenance P
- Page 21 and 22: Work Volume • 1,300 - 1,500 Work
- Page 23 and 24: Contract Maintenance
- Page 25 and 26: Budget
- Page 27: SWRP Maintenance Budget 2009-2012
- Page 36: 10,000 HP
- Page 57: Emergencies
Over 11,000 Stickney Asset<br />
Records<br />
• 6 Pumping Stations<br />
– Mainstream 550MGD, 8 pumps 3,600 – 17,500HP<br />
– Racine Ave 3.9BGD, 14 pumps 1,000 - 1,750HP<br />
• 103 TARP Control Structures<br />
• 4 Reservoirs