reporting - Metropolitan Water Reclamation District of Greater Chicago
reporting - Metropolitan Water Reclamation District of Greater Chicago reporting - Metropolitan Water Reclamation District of Greater Chicago
10/3/2011 20.0 18.0 16.0 14.0 12.0 10.0 8.0 6.0 4.0 2.0 0.0 Backlog 11/26/2007 2/1/2008 4/1/2008 6/3/2008 8/1/2008 10/1/2008 12/1/2008 2/3/2009 5/1/2009 7/1/2009 9/3/2009 11/2/2009 1/5/2010 3/1/2010 5/3/2010 7/7/2010 9/7/2010 1/3/2011 3/7/2011 53/3/11 6/30/2011 Average Backlog in Weeks for Primary Trades C2 E2 F2 I2 M2 P2 S2 T2 G2 Total Backlog Average Ready Backlog Average
Contract Maintenance
- Page 1 and 2: Maintenance at the Stickney Water R
- Page 3 and 4: Increase Productivity
- Page 5 and 6: Maintenance More than just firefigh
- Page 7 and 8: Maintenance Mission To ensure relia
- Page 9 and 10: Over 11,000 Stickney Asset Records
- Page 11 and 12: SWRP M&O Org Chart Maintenance Mana
- Page 13 and 14: M&O Master Mechanics and Skilled Tr
- Page 15 and 16: Pre-Computerized Maintenance System
- Page 17 and 18: WORK ORDER BASICS Corrective Preven
- Page 19 and 20: Preventive/Predictive Maintenance P
- Page 21: Work Volume • 1,300 - 1,500 Work
- Page 25 and 26: Budget
- Page 27: SWRP Maintenance Budget 2009-2012
- Page 36: 10,000 HP
- Page 57: Emergencies
10/3/2011<br />
20.0<br />
18.0<br />
16.0<br />
14.0<br />
12.0<br />
10.0<br />
8.0<br />
6.0<br />
4.0<br />
2.0<br />
0.0<br />
Backlog<br />
11/26/2007<br />
2/1/2008<br />
4/1/2008<br />
6/3/2008<br />
8/1/2008<br />
10/1/2008<br />
12/1/2008<br />
2/3/2009<br />
5/1/2009<br />
7/1/2009<br />
9/3/2009<br />
11/2/2009<br />
1/5/2010<br />
3/1/2010<br />
5/3/2010<br />
7/7/2010<br />
9/7/2010<br />
1/3/2011<br />
3/7/2011<br />
53/3/11<br />
6/30/2011<br />
Average Backlog in Weeks for Primary Trades<br />
C2 E2 F2 I2 M2 P2 S2 T2 G2<br />
Total Backlog Average Ready Backlog Average