Europe, Africa & Middle East<br />
Storage. A contract by Abu Dhabi<br />
Gas Industries Ltd. (GASCO) for<br />
the engineering, procurement,<br />
fabrication and construction<br />
of six low temperature/<br />
cryogenic storage tanks, two<br />
ambient storage tanks and the<br />
associated piping, controls,<br />
power distribution and civil works<br />
systems. This project is part of the<br />
expansion of GASCO’s Integrated<br />
Gas Development project in<br />
Ruwais, in the Emirate of Abu<br />
Dhabi.<br />
Full-Field Development. A frontend<br />
engineering and design<br />
(FEED) services contract, in a joint<br />
venture with Aker Solutions and<br />
WorleyParsons, for Phase 2 of<br />
the full-field development of the<br />
giant Kashagan oil field offshore<br />
Kazakhstan, which contains<br />
an estimated 12 to 15 billion<br />
barrels of oil reserves. Work on<br />
the project is expected to be<br />
completed in the first quarter of<br />
2010, with additional options that<br />
could extend the work up to an<br />
8-year period.<br />
Refinery Modernization. A<br />
contract by NAFTNA INDUSTRIJA<br />
SRBIJE (NIS Petroleum Industry<br />
of Serbia) to upgrade its Pancevo<br />
Oil Refinery in Serbia. The<br />
scope of work includes detailed<br />
engineering, procurement<br />
services, construction<br />
management and commissioning<br />
for the hydrocracker/hydrotreater<br />
unit (licensed by Chevron<br />
Lummus Global) and the<br />
associated support units, auxiliary<br />
and offsites systems.<br />
Diesel Hydrotreater. A contract<br />
by Royal Dutch Shell plc for<br />
the engineering, procurement<br />
and construction of a diesel<br />
hydrotreater at the Pernis Refinery<br />
in Rotterdam, The Netherlands.<br />
Asia Pacific & Australia<br />
Chemical Plants. Contracts<br />
by Brahmaputra Cracker and<br />
Polymer Limited (BCPL) for the<br />
license and basic engineering<br />
of two new chemical plants to<br />
Lummus Technology. BCPL’s<br />
ethylene plant will utilize Lummus<br />
Technology’s proprietary ethylene<br />
technology, and the downstream<br />
polypropylene plant will utilize<br />
Novolen advanced gas-phase<br />
polypropylene technology.<br />
The two plants will be built in<br />
Lepetkata, Assam, India.<br />
<strong>LNG</strong>. A contract for an <strong>LNG</strong> import<br />
terminal expansion project in<br />
Fujian Province, China, by CNOOC<br />
Fujian <strong>LNG</strong> Co. Ltd. CB&I’s scope<br />
of work includes engineering,<br />
procurement and construction<br />
of two additional 160,000 cubic<br />
meter full containment <strong>LNG</strong><br />
storage tanks. This award follows<br />
CB&I’s successful completion of<br />
the first phase of the Fujian import<br />
terminal. The project is scheduled<br />
to be completed in 2011.<br />
Heaters. A material supply<br />
contract for eight cracking heaters.<br />
These heaters are for the No. 6<br />
Naphtha Cracker Ethylene Plant of<br />
CPC Corporation, Taiwan, located<br />
in Lin Yuan, Taiwan, Republic of<br />
China. Lummus Technology also<br />
provided the process technology<br />
and basic engineering under a<br />
separate contract with CPC.<br />
<strong>LNG</strong> Tanks. A contract by Chevron<br />
Australia Pty Ltd for the <strong>LNG</strong><br />
and condensate storage tanks<br />
at the Gorgon <strong>LNG</strong> liquefaction<br />
project on Barrow Island in<br />
Australia. CB&I’s scope includes<br />
the engineering, procurement,<br />
fabrication and construction<br />
of two 180,000 cubic meter<br />
full containment <strong>LNG</strong> tanks,<br />
four condensate tanks and the<br />
associated piping, electrical,<br />
instrumentation and civil works.<br />