2009 New Projects<br />

North America<br />

<strong>LNG</strong> Expansion. A contract by UGI<br />

<strong>LNG</strong>, Inc. to engineer, procure and<br />

construct the expansion of the<br />

Temple <strong>LNG</strong> peak shaving facility<br />

near Reading, Pennsylvania.<br />

Hydrotreating. A contract to<br />

design and fabricate a distillate<br />

hydrotreating unit for a North<br />

American refinery. CB&I’s scope<br />

of work includes the engineering,<br />

procurement and fabrication of<br />

the hydrotreating unit, which<br />

removes sulfur from diesel by<br />

utilizing a catalyst in the presence<br />

of hydrogen.<br />

Nuclear. A second engineering,<br />

procurement, fabrication<br />

and construction contract by<br />

Westinghouse Electric Company to<br />

build the containment vessels for<br />

a nuclear power plant expansion<br />

in the southeastern U.S. The first<br />

vessel is scheduled for completion<br />

in 2015 and the second in 2018.<br />

Storage. A contract by the<br />

Harrison County Utility Authority<br />

in Mississippi for the engineering,<br />

fabrication and construction of<br />

seven elevated water storage<br />

tanks. The project is an important<br />

part of the Mississippi Gulf Region<br />

Water and Wastewater Plan to<br />

rebuild and storm-proof water<br />

and wastewater infrastructure<br />

impacted by Hurricane Katrina.<br />

Work is scheduled to be<br />

completed in 2011.<br />

Central & South America<br />

Refinery. A project by Refinería de<br />

Cartagena S.A. (REFICAR) for the<br />

engineering, procurement services,<br />

and construction of a new refinery,<br />

with processing capacity of 165,000<br />

barrels per day. This project also<br />

includes revamping an existing<br />

80,000 barrel per day adjacent<br />

refinery in Cartagena, Colombia.<br />

Storage. A contract by Flota<br />

Petrolera Ecuatoriana (FLOPEC) to<br />

design and build storage facilities<br />

for a grassroots liquefied petroleum<br />

gas marine terminal in Ecuador. The<br />

project, located in Monteverde, will<br />

provide Ecuador additional options<br />

for importing LPG, a fuel used<br />

for heating and transportation.<br />

The project is scheduled to be<br />

completed in 2010.<br />

Pipeline. An engineering,<br />

procurement and construction<br />

contract by Petroterminal de<br />

Panama, S.A. for the Phase 2<br />

expansion of the Trans-Panama<br />

Pipeline facilities. The work<br />

scope includes the design and<br />

construction of 5.4 million barrels<br />

of crude oil storage and the<br />

associated civil, mechanical and<br />

electrical work at PTP’s terminal<br />

facilities in Chiriqui Grande on<br />

Panama’s Atlantic coast, and Puerto<br />

Armuelles on the Pacific Coast.<br />

18