Project Updates: <strong>LNG</strong> <strong>Regasification</strong> <strong>Terminal</strong><br />

<strong>Quintero</strong> <strong>Bay</strong>, <strong>Chile</strong><br />

One hundred percent of <strong>Chile</strong>an gas<br />

came from Argentina – until now.<br />

Gas demand all over South America<br />

is growing rapidly, and gas producers<br />

in this region have not kept up with<br />

demand. This <strong>LNG</strong> import terminal,<br />

located in <strong>Quintero</strong> <strong>Bay</strong>, <strong>Chile</strong>, will<br />

supply 40% of the country’s natural<br />

gas supply and will positively impact<br />

the <strong>Chile</strong>an economy. CB&I’s contract is<br />

for the engineering, procurement and<br />

construction of two 160,000 cubic meter<br />

full-containment <strong>LNG</strong> tanks with 205<br />

MTPA sendout capacity, and complete<br />

ship unloading facilities. CB&I’s scope<br />

also includes marine works, with a 1.7<br />

kilometer long jetty extending into the<br />

bay.<br />

CB&I’s craft labor peaked at 4,500,<br />

including thousands of local workers<br />

who were provided rigorous training to<br />

prepare them for this project-the first of its<br />

kind in <strong>Chile</strong>. Beginning in January 2009,<br />

CB&I has achieved 6 percent construction<br />

completion each month, and is on track<br />

to complete the first tank in the second<br />

quarter of 2010, and the second tank in<br />

the third quarter of 2010. CB&I has a long<br />

history of completing successful projects in<br />

<strong>Chile</strong>, where the company has maintained<br />

a presence since 1924.<br />

In order to meet client needs, this<br />

project required a small 10,000 cubic<br />

meters “early gas tank,” which has been<br />

functional since July 2009, until the<br />

larger, full-containment tanks are ready<br />

in mid-2010. Because the early gas tank is<br />

only large enough for approximately one<br />

day of production, an <strong>LNG</strong> ship will be<br />

docked at the unloading platform while<br />

the large tanks are completed.<br />

Exciting News:<br />

July 31, 2009: First gas export into the <strong>Chile</strong>an natural gas<br />

distribution system.<br />