Table C.5 (continued)<br />

Activity:<br />

Development<br />

Description: This activity includes all tasks involved in the planning, design, procurement, construction, installation<br />

and commissioning of offshore installations used for the exploitation of oil and gas resources.<br />

Subactivity: Detailed engineering.<br />

Hazard<br />

identification and<br />

risk assessment<br />

step<br />

Functional<br />

requirements<br />

Examples of aspects to be considered and<br />

activities undertaken<br />

Update functional requirements as necessary to<br />

achieve tolerable risk levels<br />

Prepare functional requirements for specific plant<br />

and equipment to allow procurement, testing and<br />

inspection<br />

Finalize functional requirements for operational<br />

matters such as inspection frequencies, maintenance<br />

requirements, emergency response, etc.<br />

Comments<br />

The functional requirements are updated as the critical<br />

systems are optimized and information becomes available<br />

from vendors.<br />

Consideration is also given at this stage to ensuring that the<br />

functional requirements can be adequately monitored and<br />

verified.<br />