Table C.7 — Examples of hazard identification and risk assessment considerations during<br />

the commissioning and handover phases of field development activities<br />

Activity: Field<br />

development<br />

Description: This activity includes all tasks involved in the planning, design, procurement, construction, installation<br />

and commissioning of offshore installations used for the exploitation of oil and gas resources.<br />

Subactivity: Commissioning and handover.<br />

Hazard<br />

identification and<br />

risk assessment<br />

step<br />

Identify hazards<br />

Hazards and risk<br />

assessment<br />

Screening criteria<br />

Risk-reducing<br />

measures<br />

Functional<br />

requirements<br />

Examples of aspects to be considered and<br />

activities undertaken<br />

Hazards arising from high manning levels and many<br />

different trades and contractors<br />

Hazards due to part operation of installation facilities<br />

for commissioning<br />

Hazards due to remedial works routines<br />

Hazards arising from incorrect or deficient<br />

documentation<br />

Experience of previous and similar work<br />

Codes, standards and procedures<br />

<strong>Checklist</strong>s and safety data sheets<br />

HAZID and JHA<br />

HAZOPs for non-standard commissioning tasks<br />

HRA<br />

Generally screening criteria are in line with<br />

operational criteria<br />

Temporary situations (e.g. abnormal discharges,<br />

flaring, short-term accommodation short-term<br />

chemical exposure limits)<br />

Employ extensive onshore pre-commissioning<br />

Integrate commissioning team of concession holder<br />

and contractor staff<br />

Ensure familiarity of staff with equipment by early<br />

project involvement and training (e.g. use of onshore<br />

simulator or training in equipment vendor’s works)<br />

Use lock-out systems<br />

Ensure availability and adequacy of all necessary<br />

documentation<br />

Schedule commissioning as much as possible to<br />

reduce risk due to concurrent activities<br />

Criteria for temporary HSE critical facilities<br />

Emergency response arrangements<br />

Discharges and emissions during commissioning<br />

activities<br />

Temporary environmental protection requirements<br />

Manning restrictions prior to commissioning of<br />

essential systems<br />

Comments<br />

The Permit-to-Work system is used extensively during this<br />

phase, together with the associated use of checklists and<br />

hazard evaluations such as JHA and sometimes HAZOP type<br />

assessments.<br />

Particular attention required to assessment of coordination<br />

procedures and liaison between different entities. Review of<br />

information distribution.<br />