y NIMR for malaria and RMRI for Kala-azar in collaboration with Regional<br />

Directorates in the different states. Assistance will be requested from<br />

medical colleges and other relevant institutions that have interest and<br />

expertise in collaboration with NIMR and RMRI. The proposed activity<br />

schedule and time lines for malaria control and Kala-azar will be the same.<br />

The description that follows therefore applies to both malaria control and<br />

Kala-azar elimination.<br />

7.1.1.4.1 Therapeutic efficacy monitoring<br />

Therapeutic efficacy monitoring is integral to the program, and will be<br />

carried out by NIMR and other ICMR institutions in collaboration with<br />

<strong>NVBDCP</strong>. A standard protocol for therapeutic efficacy will be used based on<br />

WHO recommendations and at least 15 studies will be undertaken every<br />

year. The <strong>National</strong> Institute of Malaria Research Centre (NIMR) will have<br />

overall responsibility for implementing this activity which involves<br />

finalization of protocols, recruitment and training of staff, assuring the<br />

quality, consolidation of the data and organizing annual consultation and<br />

feedback. Since the monitoring will be jointly done with the Regional<br />

Directors, NIMR will also be responsible for recruitment of Research Officers<br />

on contract for the units located with the Regional Directors of ROHFW<br />

where no post of Research Officer is in position. The 13 therapeutic teams<br />

under <strong>NVBDCP</strong> located at Regional Offices will work in close co-ordination<br />

with the NIMR. An MOU shall be signed with NIMR for effective utilization of<br />

manpower that exists in the Regional Offices.<br />

Activity schedules<br />

Result Indicator Activity<br />

Knowledge<br />

of the status<br />

of<br />

resistance<br />

level<br />

No. of<br />

studies<br />

conducted<br />

and<br />

completed<br />

Signing of agreement<br />

Finalize the study tools<br />

and protocol<br />

Selection of sites for<br />

monitoring<br />

Allocation of study to<br />

Regional Directors and<br />

NIMR field sites<br />

Training of researchers<br />

Studies commenced<br />

Report submission<br />

Review of findings<br />

jointly with <strong>NVBDCP</strong><br />

and action taken for<br />

program<br />

60<br />

Time<br />

schedule<br />

July 08<br />

Aug 08<br />

Sep 08<br />

Oct 08<br />

Nov 08<br />

Dec 08<br />

Quarterly<br />

starting Mar09<br />

Quarterly<br />

starting Mar<br />

09<br />

Responsibility<br />

<strong>NVBDCP</strong>/<br />

NIMR/RMRI<br />

<strong>NVBDCP</strong>/<br />

Agency<br />

Agency<br />

<strong>NVBDCP</strong><br />

<strong>NVBDCP</strong>/<br />

World Bank

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!