18.01.2015 Views

National Project Implementation Plan - NVBDCP

National Project Implementation Plan - NVBDCP

National Project Implementation Plan - NVBDCP

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

procurement agent) which are not prior reviewed by the World Bank. These<br />

reviews are meant to ensure that the agreed procurement procedures are<br />

being followed. The percentage of the contracts to be reviewed shall be based<br />

on the risk rating (20% based on the current “high” risk rating of the project<br />

but may change in future if risk rating is revised) and the sample shall be<br />

representative viz. various procurement methods and sizes of the contracts<br />

shall be proportionally included in the sample to the extent possible. The<br />

sample size may be increased or decreased based on the findings of the post<br />

reviews.<br />

The ex-post review by the World Bank will be conducted either by World Bank<br />

staff or by consultant hired by the Bank. <strong>NVBDCP</strong> will implement a document<br />

management and record-keeping system to ensure that the data and<br />

documentation pertaining to all the contracts are kept systematically by the<br />

implementing agencies and shall be provided to the World Bank in a timely<br />

manner.<br />

133

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!