- Page 9 and 10: Executive Summary Section 1221(a) o
- Page 11 and 12: Figure ES-3. One Critical Congestio
- Page 13 and 14: Acronyms Used in This Report AC AEP
- Page 15 and 16: FEDERAL POWER ACT 1. Introduction *
- Page 17 and 18: need to be made in the next few yea
- Page 19 and 20: Transmission Constraints, Paths, an
- Page 21: • On February 2, 2006, the Depart
- Page 24 and 25: 2.3. Scenario Analyses and Economic
- Page 26 and 27: not explicitly identified by WECC.
- Page 28 and 29: most limiting element is considered
- Page 30 and 31: 3. Development of analytical proced
- Page 32 and 33: Simulation modeling to estimate fut
- Page 35 and 36: 3. Congestion and Constraints in th
- Page 37 and 38: 6. American Electric Power and Firs
- Page 39 and 40: As shown in Figure 3-6, major const
- Page 41 and 42: model assumed dispatch on the basis
- Page 43: efficient gas-fired generation, and
- Page 46 and 47: Figure 4-1. Congestion on Western T
- Page 48 and 49: on a line designed specifically for
- Page 50 and 51: Figure 4-5. Projected Congestion on
- Page 52 and 53:
when path loading is at or above 75
- Page 54 and 55:
e most appropriate to consider desi
- Page 56 and 57:
proposed to address these problems,
- Page 58 and 59:
Similarly, because of close import
- Page 60 and 61:
service. 50 The California Energy C
- Page 62 and 63:
higher electricity costs in Washing
- Page 64 and 65:
energy from Wyoming to Utah, Arizon
- Page 66 and 67:
Figure 5-6. Potential Corridors on
- Page 68 and 69:
from buyers, significant financial
- Page 70 and 71:
Figure 5-10. Potential Wind Develop
- Page 72 and 73:
Figure 5-11. Locations of Proposed
- Page 74 and 75:
B. Are key transmission constraints
- Page 76 and 77:
meetings among relevant parties, su
- Page 78 and 79:
merits of possible solutions. DOE e
- Page 81 and 82:
Glossary Available transfer capabil
- Page 83 and 84:
Operating transfer capability (OTC)
- Page 85:
APPENDIXES
- Page 88 and 89:
SEC. 1221. SITING OF INTERSTATE ELE
- Page 91 and 92:
Appendix B Parties Responding to th
- Page 93 and 94:
Appendix C Agenda for DOE’s March
- Page 95:
March 29, 2006 — 8:30 am - 3:00 p
- Page 98 and 99:
Ellen Lutz, U.S. Department of Ener
- Page 100 and 101:
Michael Held, MidAmerican Energy Pa
- Page 103:
Appendix F Organizations Providing
- Page 106 and 107:
Organization/Event Outreach Type Lo
- Page 109:
Appendix H General Documents or Dat
- Page 112 and 113:
29. NPCC 2004 Report of the CP-10 W
- Page 115 and 116:
Appendix J Documents or Data Review
- Page 117:
35. U.S. Department of Energy 1982.