17.01.2015 Views

Track Record 34, January to March 2008 - Public Transport Victoria

Track Record 34, January to March 2008 - Public Transport Victoria

Track Record 34, January to March 2008 - Public Transport Victoria

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Track</strong> <strong>Record</strong><br />

Vic<strong>to</strong>ria’s <strong>Public</strong> <strong>Transport</strong> Services<br />

2.3 Passenger Compensation<br />

For details of thresholds for passenger compensation, please refer <strong>to</strong> the Glossary on page 18.<br />

Connex<br />

• No passenger compensation was payable during the quarter.<br />

Yarra Trams<br />

• Passenger compensation was payable in <strong>March</strong> due <strong>to</strong> punctuality not reaching the threshold.<br />

V/Line Passenger trains<br />

• <strong>January</strong> – punctuality did not meet the threshold and passenger compensation was payable on all short and long<br />

distance corridors.<br />

• February – punctuality did not meet the threshold and passenger compensation was payable on the following<br />

corridors:<br />

• Short distance: Ballarat, Bendigo, Geelong, Seymour, Traralgon<br />

• Long distance: Albury / Wodonga, Bairnsdale / Sale, Swan Hill / Echuca.<br />

• <strong>March</strong> – punctuality did not meet the threshold and passenger compensation was payable on all short and long<br />

distance corridors.<br />

6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!