MINING WELCOME 欢迎采矿 - The ASIA Miner
MINING WELCOME 欢迎采矿 - The ASIA Miner
MINING WELCOME 欢迎采矿 - The ASIA Miner
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Papau New Guinea<br />
Maiden gold resource for Nevera prospect<br />
A MAIDEN resource estimate has been completed<br />
in accordance with JORC guidelines<br />
for Gold Anomaly’s Nevera prospect, which<br />
is part of the Crater Mountain Gold Project.<br />
<strong>The</strong> initial inferred resource comprises 24 million<br />
tonnes @ 1.0 grams/tonne gold for<br />
790,000 contained ounces.<br />
<strong>The</strong> Crater Mountain project is in the Papua New Guinea<br />
Highlands and is about 50km southwest of Goroka.<br />
<strong>The</strong> maiden estimate only considers drilling<br />
in about 60% of the Main Zone identified to<br />
date, and does not include the artisanal zone.<br />
Further step out drilling success is likely to increase<br />
the resource significantly. Given that<br />
this zone is still partly open along strike, there<br />
is significant upside to increase the resource<br />
with more drilling in coming months.<br />
<strong>The</strong> upside potential to upgrade and increase<br />
the resource is also considered substantial<br />
given that drilling to date has been confined to<br />
the Nevera prospect. Gold Anomaly plans to<br />
extend exploration activities to adjacent prospects<br />
Masi Creek and Nimi in 2012, which<br />
have similar surface geology, mineralization and<br />
alteration to that seen at Nevera.<br />
Gold Anomaly’s executive chairman Greg<br />
Starr says, “This maiden resource marks a<br />
major milestone for the company, confirming<br />
the potential for Crater Mountain to ultimately<br />
become PNG’s next major gold discovery.<br />
“This is truly an exceptional result given that<br />
we only launched our maiden drilling program<br />
some 12 months ago. We are excited that<br />
several of our drill holes have encountered<br />
extensive gold mineralization mirroring that of<br />
previous exploration at Nevera, and supporting<br />
exploration director Peter Macnab’s mineralization<br />
model.”<br />
Now that the company has an initial resource<br />
for Nevera, preliminary metallurgical<br />
test work is planned on core from the mixing<br />
zone early in the new year.<br />
Creating access to a section of the Crater Mountain project.<br />
<strong>The</strong> company has received positive results<br />
from initial petrological studies completed on<br />
a sample of core from its first 1000 metreplus<br />
hole targeting a possible feeder system<br />
at depth at Nevera. <strong>The</strong> studies indicate that<br />
the intrusive intersected by the hole is a porphyry<br />
and bears all the hallmarks of a typical<br />
porphyry system, some of which are responsible<br />
for some of the largest copper gold deposits<br />
in PNG and the world.<br />
22 | <strong>ASIA</strong> <strong>Miner</strong> | January/February 2012