Adaro terus berkembang di 2013 - The ASIA Miner
Adaro terus berkembang di 2013 - The ASIA Miner
Adaro terus berkembang di 2013 - The ASIA Miner
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Product News<br />
Fluid couplings avoid AFC downtime<br />
THE Jin Cheng Coal Group, one of the biggest<br />
coal groups in China, found a way to avoid<br />
unexpected downtimes of the AFCs (armored<br />
face conveyor) and to raise the productivity of<br />
the Chang Ping Coal Mine. In the past, the<br />
underground mine was facing a lot of problems<br />
because of their AFC drives equipped with two<br />
two-speed motors but then the head of Jin<br />
Cheng decided to replace the two-speed motors<br />
with Voith Fluid Couplings (type 562 DTP-<br />
KWL2), in order to prevent chain breaks as well<br />
as gearbox and motor break downs in the future.<br />
<strong>The</strong> couplings provide a lot of benefits for<br />
AFC drives. “Based on the hydrodynamic principle,<br />
the fluid couplings protect the whole<br />
drive train from overload situations, which<br />
often happen at Chang Ping Coal Mine”, head<br />
of the Mechanical and Electrical Department of<br />
Chang Ping Coal Mine, Mao Weihong says.<br />
“<strong>The</strong> 562 DTPKWL2-1000 couplings are so<br />
powerful that they can easily handle blockages<br />
of the AFC without downtime or damage of the<br />
equipment.”<br />
Mao Weihong says he is very satisfied with<br />
the exchange of the equipment. Furthermore, he<br />
compliments the reliability of the couplings and<br />
especially their soft start function. “For upcoming<br />
mining projects, we will also rely on Voith<br />
Fluid Couplings to raise our productivity.”<br />
Since installation of the couplings in 2009,<br />
the AFC experienced no chain breaks, which<br />
also means significantly reduced maintenance<br />
efforts. Nowadays, the 225 metre wide and<br />
1000 metre long coal panels produce an annual<br />
output of 3 million tonnes in the Chang Ping<br />
mine and the situation of the coal mine has,<br />
Fluid couplings enable less downtimes and increased productivity at the AFC.<br />
therefore, greatly improved.<br />
Located near Jin Cheng City, Chang Ping<br />
Coal Mine employs more than 6000 people and<br />
produces 6 million tonnes of coal each year.<br />
Voith Turbo, the specialist for hydrodynamic<br />
drive, coupling and braking systems for road,<br />
rail and industrial applications, as well as for<br />
ship propulsion systems, is a group <strong>di</strong>vision of<br />
Voith GmbH. Voith sets standards in the markets<br />
of energy, oil & gas, paper, raw materials<br />
and transportation & automotive. Founded in<br />
1867, Voith employs more than 42,000 people,<br />
generates 5.7 billion Euro in sales, operates in<br />
more than 50 countries around the world and is<br />
today one of the biggest family-owned companies<br />
in Europe.<br />
Whittle implements new Prober C software<br />
WHITTLE Consulting, which provides strategic<br />
planning services for mining companies,<br />
has announced a significant upgrade to its inhouse<br />
Prober software. <strong>The</strong> company says that<br />
the new software can increase mining NPV by<br />
5% to 35%, or substantially more.<br />
After more than 3 years of development, prototyping<br />
and testing, Whittle says Prober C<br />
enables intricate modelling of multiple steps in<br />
the mining value chain, bringing technologies<br />
such as mine-to-mill, selective blasting, ore<br />
sorting, and complex comminution strategies<br />
into the strategic planning process.<br />
“New technologies in ore characterization<br />
and extraction processes enable substantial economic<br />
and energy saving opportunities,”<br />
explains Whittle Consulting CEO Gerald<br />
Whittle.<br />
“Developments in these areas, led by our<br />
alliance partner JKTech, have clear operational<br />
benefits, and now we can harness their strategic<br />
significance by re-optimizing the pits/phases or<br />
underground mines, mining methods, life-ofmine<br />
schedules, cut-off grade and stockpiling<br />
strategies, processing policies, product strategies,<br />
logistics and capital scaling decisions to<br />
apply these technologies in an integrated fashion.<br />
This will compound economic performance<br />
and capital efficiency to new levels,”<br />
Gerald Whittle says.<br />
For the last decade, Whittle Consulting has<br />
helped mining companies substantially improve<br />
the cash flow profiles of their mining projects<br />
and operations through an integrated approach<br />
‘Enterprise Optimization’. In many cases net<br />
cash flow is doubled in the first 3 to 5 years,<br />
usually with little or no capital expen<strong>di</strong>ture<br />
involved.<br />
As the trends continue towards lower grade<br />
and problematic ore bo<strong>di</strong>es, escalating costs,<br />
scarce capital and <strong>di</strong>minishing margins, it says<br />
the Enterprise Optimization capability will help<br />
progressive mining companies lead the way in<br />
terms of competitiveness and sustainability.<br />
Enterprise Optimization, often nicknamed<br />
the ‘Money Mining’ approach, is underpinned<br />
by Prober software developed by Jeff Whittle,<br />
founder of the Whittle business and the developer<br />
of the original Whittle Pit Optimization<br />
software that has become the industry standard<br />
for mine planning over the last three decades.<br />
Jeff Whittle, now 83-years-old, explains,<br />
“We have been using the previous version<br />
Prober B for more than a decade. It allows for<br />
three steps in the value chain: mining, processing<br />
and production, although with some clever<br />
but convoluted modelling more could be<br />
accommodated.<br />
“<strong>The</strong> new Prober C supports unlimited<br />
sequential or parallel procedures, making more<br />
detailed yet more intuitive modelling of complex<br />
mining and processing technologies possible.<br />
This is then simultaneously optimized to<br />
maximize the value of the business,” he adds.<br />
Whittle Consulting works with alliance partners<br />
Ausenco, Gemcom/Geovia, JKTech,<br />
Xstract, VBKom, MineQuest and E<strong>di</strong>son<br />
Research to deliver the Enterprise Optimization<br />
services worldwide.<br />
36 l Coal Age Indonesia l April <strong>2013</strong>