17.01.2015 Views

Adaro terus berkembang di 2013 - The ASIA Miner

Adaro terus berkembang di 2013 - The ASIA Miner

Adaro terus berkembang di 2013 - The ASIA Miner

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Product News<br />

Fluid couplings avoid AFC downtime<br />

THE Jin Cheng Coal Group, one of the biggest<br />

coal groups in China, found a way to avoid<br />

unexpected downtimes of the AFCs (armored<br />

face conveyor) and to raise the productivity of<br />

the Chang Ping Coal Mine. In the past, the<br />

underground mine was facing a lot of problems<br />

because of their AFC drives equipped with two<br />

two-speed motors but then the head of Jin<br />

Cheng decided to replace the two-speed motors<br />

with Voith Fluid Couplings (type 562 DTP-<br />

KWL2), in order to prevent chain breaks as well<br />

as gearbox and motor break downs in the future.<br />

<strong>The</strong> couplings provide a lot of benefits for<br />

AFC drives. “Based on the hydrodynamic principle,<br />

the fluid couplings protect the whole<br />

drive train from overload situations, which<br />

often happen at Chang Ping Coal Mine”, head<br />

of the Mechanical and Electrical Department of<br />

Chang Ping Coal Mine, Mao Weihong says.<br />

“<strong>The</strong> 562 DTPKWL2-1000 couplings are so<br />

powerful that they can easily handle blockages<br />

of the AFC without downtime or damage of the<br />

equipment.”<br />

Mao Weihong says he is very satisfied with<br />

the exchange of the equipment. Furthermore, he<br />

compliments the reliability of the couplings and<br />

especially their soft start function. “For upcoming<br />

mining projects, we will also rely on Voith<br />

Fluid Couplings to raise our productivity.”<br />

Since installation of the couplings in 2009,<br />

the AFC experienced no chain breaks, which<br />

also means significantly reduced maintenance<br />

efforts. Nowadays, the 225 metre wide and<br />

1000 metre long coal panels produce an annual<br />

output of 3 million tonnes in the Chang Ping<br />

mine and the situation of the coal mine has,<br />

Fluid couplings enable less downtimes and increased productivity at the AFC.<br />

therefore, greatly improved.<br />

Located near Jin Cheng City, Chang Ping<br />

Coal Mine employs more than 6000 people and<br />

produces 6 million tonnes of coal each year.<br />

Voith Turbo, the specialist for hydrodynamic<br />

drive, coupling and braking systems for road,<br />

rail and industrial applications, as well as for<br />

ship propulsion systems, is a group <strong>di</strong>vision of<br />

Voith GmbH. Voith sets standards in the markets<br />

of energy, oil & gas, paper, raw materials<br />

and transportation & automotive. Founded in<br />

1867, Voith employs more than 42,000 people,<br />

generates 5.7 billion Euro in sales, operates in<br />

more than 50 countries around the world and is<br />

today one of the biggest family-owned companies<br />

in Europe.<br />

Whittle implements new Prober C software<br />

WHITTLE Consulting, which provides strategic<br />

planning services for mining companies,<br />

has announced a significant upgrade to its inhouse<br />

Prober software. <strong>The</strong> company says that<br />

the new software can increase mining NPV by<br />

5% to 35%, or substantially more.<br />

After more than 3 years of development, prototyping<br />

and testing, Whittle says Prober C<br />

enables intricate modelling of multiple steps in<br />

the mining value chain, bringing technologies<br />

such as mine-to-mill, selective blasting, ore<br />

sorting, and complex comminution strategies<br />

into the strategic planning process.<br />

“New technologies in ore characterization<br />

and extraction processes enable substantial economic<br />

and energy saving opportunities,”<br />

explains Whittle Consulting CEO Gerald<br />

Whittle.<br />

“Developments in these areas, led by our<br />

alliance partner JKTech, have clear operational<br />

benefits, and now we can harness their strategic<br />

significance by re-optimizing the pits/phases or<br />

underground mines, mining methods, life-ofmine<br />

schedules, cut-off grade and stockpiling<br />

strategies, processing policies, product strategies,<br />

logistics and capital scaling decisions to<br />

apply these technologies in an integrated fashion.<br />

This will compound economic performance<br />

and capital efficiency to new levels,”<br />

Gerald Whittle says.<br />

For the last decade, Whittle Consulting has<br />

helped mining companies substantially improve<br />

the cash flow profiles of their mining projects<br />

and operations through an integrated approach<br />

‘Enterprise Optimization’. In many cases net<br />

cash flow is doubled in the first 3 to 5 years,<br />

usually with little or no capital expen<strong>di</strong>ture<br />

involved.<br />

As the trends continue towards lower grade<br />

and problematic ore bo<strong>di</strong>es, escalating costs,<br />

scarce capital and <strong>di</strong>minishing margins, it says<br />

the Enterprise Optimization capability will help<br />

progressive mining companies lead the way in<br />

terms of competitiveness and sustainability.<br />

Enterprise Optimization, often nicknamed<br />

the ‘Money Mining’ approach, is underpinned<br />

by Prober software developed by Jeff Whittle,<br />

founder of the Whittle business and the developer<br />

of the original Whittle Pit Optimization<br />

software that has become the industry standard<br />

for mine planning over the last three decades.<br />

Jeff Whittle, now 83-years-old, explains,<br />

“We have been using the previous version<br />

Prober B for more than a decade. It allows for<br />

three steps in the value chain: mining, processing<br />

and production, although with some clever<br />

but convoluted modelling more could be<br />

accommodated.<br />

“<strong>The</strong> new Prober C supports unlimited<br />

sequential or parallel procedures, making more<br />

detailed yet more intuitive modelling of complex<br />

mining and processing technologies possible.<br />

This is then simultaneously optimized to<br />

maximize the value of the business,” he adds.<br />

Whittle Consulting works with alliance partners<br />

Ausenco, Gemcom/Geovia, JKTech,<br />

Xstract, VBKom, MineQuest and E<strong>di</strong>son<br />

Research to deliver the Enterprise Optimization<br />

services worldwide.<br />

36 l Coal Age Indonesia l April <strong>2013</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!