17.01.2015 Views

Proline Promass 83E/F/O Description of Device Functions - FMC ...

Proline Promass 83E/F/O Description of Device Functions - FMC ...

Proline Promass 83E/F/O Description of Device Functions - FMC ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

10 Block SPECIAL FUNCTION <strong>Device</strong> <strong>Functions</strong> <strong>Proline</strong> <strong>Promass</strong> 83<br />

– Quantity data for when the second valve should open:<br />

Function OPEN VALVE 2 (7224) page 154 = 0 [kg]<br />

– Quantity data for when the second valve should close:<br />

Function CLOSE VALVE 2 (7223) page 154 = 8 [kg]<br />

– Quantity data for when the message should be generated:<br />

Function PROGRESS NOTE (7243) page 160 = 9 [kg]<br />

Example 1 a<br />

Batching specifications identical to those in example 1, however the new batching quantity is<br />

20 kg and the message should be generated once 18 kg are batched.<br />

The following parameters must be set manually:<br />

– Enter the new batching quantity:<br />

Function BATCH QUANTITY (7203) page 148 = 20 [kg]<br />

– New quantity data for when the message should be generated:<br />

Function PROGRESS NOTE (7243) page 160 = 18 [kg]<br />

The following functions are automatically adjusted to suit the new batching quantity:<br />

– Function OPEN VALVE 1 = 0 [kg]<br />

– Function OPEN VALVE 2 = 0 [kg]<br />

– Function CLOSE VALVE 2 = 16 [kg]<br />

Example 2<br />

The second example explains the parameter settings <strong>of</strong> the various functions for batching with the<br />

entry format in % for the switch points <strong>of</strong> the valves.<br />

The following batching is to take place:<br />

• 2-stage batching with a batching quantity <strong>of</strong> 15 kg in total.<br />

• Coarse batching quantity from 3 to 12 kg. Valve 2 opens when 20% (3 kg) <strong>of</strong> the batching<br />

quantity is achieved and closes when 80% (12 kg) is achieved.<br />

• Valve 1 opens at the start <strong>of</strong> the batching and closes (automatically) when the batching quantity<br />

(15 kg) is achieved.<br />

•%-input should be entered.<br />

v<br />

➁<br />

➂<br />

➃<br />

➀<br />

t<br />

0<br />

3 V 2<br />

12 15<br />

V 1<br />

x<br />

v = Flow velocity [m/s]<br />

t = Time<br />

V 1 = Valve 1 open<br />

V 2 = Valve 2 open<br />

m= Start batching, valve 1 (7220) opens<br />

n= Valve 2 (7222) opens, coarse batching quantity starts<br />

o= Valve 2 (7223) closes, coarse batching quantity achieved<br />

p= Valve 1 (7221) closes, end <strong>of</strong> batching<br />

x = After run quantity<br />

A0004684<br />

Page 156 • MN0M023<br />

Issue/Rev. 0.2 (12/12)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!