10 Block SPECIAL FUNCTION <strong>Device</strong> <strong>Functions</strong> <strong>Proline</strong> <strong>Promass</strong> 83<br />
– Quantity data for when the second valve should open:<br />
Function OPEN VALVE 2 (7224) page 154 = 0 [kg]<br />
– Quantity data for when the second valve should close:<br />
Function CLOSE VALVE 2 (7223) page 154 = 8 [kg]<br />
– Quantity data for when the message should be generated:<br />
Function PROGRESS NOTE (7243) page 160 = 9 [kg]<br />
Example 1 a<br />
Batching specifications identical to those in example 1, however the new batching quantity is<br />
20 kg and the message should be generated once 18 kg are batched.<br />
The following parameters must be set manually:<br />
– Enter the new batching quantity:<br />
Function BATCH QUANTITY (7203) page 148 = 20 [kg]<br />
– New quantity data for when the message should be generated:<br />
Function PROGRESS NOTE (7243) page 160 = 18 [kg]<br />
The following functions are automatically adjusted to suit the new batching quantity:<br />
– Function OPEN VALVE 1 = 0 [kg]<br />
– Function OPEN VALVE 2 = 0 [kg]<br />
– Function CLOSE VALVE 2 = 16 [kg]<br />
Example 2<br />
The second example explains the parameter settings <strong>of</strong> the various functions for batching with the<br />
entry format in % for the switch points <strong>of</strong> the valves.<br />
The following batching is to take place:<br />
• 2-stage batching with a batching quantity <strong>of</strong> 15 kg in total.<br />
• Coarse batching quantity from 3 to 12 kg. Valve 2 opens when 20% (3 kg) <strong>of</strong> the batching<br />
quantity is achieved and closes when 80% (12 kg) is achieved.<br />
• Valve 1 opens at the start <strong>of</strong> the batching and closes (automatically) when the batching quantity<br />
(15 kg) is achieved.<br />
•%-input should be entered.<br />
v<br />
➁<br />
➂<br />
➃<br />
➀<br />
t<br />
0<br />
3 V 2<br />
12 15<br />
V 1<br />
x<br />
v = Flow velocity [m/s]<br />
t = Time<br />
V 1 = Valve 1 open<br />
V 2 = Valve 2 open<br />
m= Start batching, valve 1 (7220) opens<br />
n= Valve 2 (7222) opens, coarse batching quantity starts<br />
o= Valve 2 (7223) closes, coarse batching quantity achieved<br />
p= Valve 1 (7221) closes, end <strong>of</strong> batching<br />
x = After run quantity<br />
A0004684<br />
Page 156 • MN0M023<br />
Issue/Rev. 0.2 (12/12)