17.01.2015 Views

Proline Promass 83E/F/O Description of Device Functions - FMC ...

Proline Promass 83E/F/O Description of Device Functions - FMC ...

Proline Promass 83E/F/O Description of Device Functions - FMC ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

10 Block SPECIAL FUNCTION <strong>Device</strong> <strong>Functions</strong> <strong>Proline</strong> <strong>Promass</strong> 83<br />

Function description<br />

SPECIAL FUNCTION BATCHING FUNCTION CONFIGURATION<br />

COMPENSATION MODE<br />

(continued)<br />

• Response when MODE 2 is selected:<br />

For batchings where batching accuracy is vital and where process-related fluctuations<br />

in flow occur during after running. Batching ends before the quantity specified in the<br />

function BATCH QUANTITY (7203) is achieved and the after run quantity is recorded.<br />

The exact batching switch-<strong>of</strong>f time is calculated based on the previous after run<br />

quantities.<br />

The number <strong>of</strong> after run quantities which are to influence the calculation can be<br />

specified in the functions AVERAGING DRIP (7207) and CALCULATION MODE<br />

(7206). The after run quantity in MODE 2 is determined between the switch-<strong>of</strong>f point<br />

and the constant undershooting <strong>of</strong> the low-flow cut <strong>of</strong>f. This means that the lower the<br />

setting is for the low-flow cut <strong>of</strong>f, the longer the after run quantity is recorded. The<br />

batching is very accurate.<br />

Example diagram <strong>of</strong> a batching sequence and the respective response in MODE 1 and<br />

MODE 2:<br />

Q<br />

t 1<br />

A<br />

a<br />

b<br />

B<br />

s<br />

1 2 3 4 5<br />

C<br />

t<br />

A0004711<br />

Q = Flow<br />

t = Time<br />

t 1 = time period shorter than or equal to the maximum batching time<br />

A = Coarse batching quantity<br />

B = Fine batching quantity<br />

C = After run quantity<br />

(Effective batching quantity = A + B + C)<br />

1 = Coarse batching starts and valve 2 opens (two-stage batching)<br />

2 = Coarse batching ends / fine batching starts, valve 2 closes, valve 1 opens<br />

3 = Fine batching ends, valve 1 closes (automatically when the specified batching quantity is<br />

achieved)<br />

4 = After run quantity recording in MODE 1 ends<br />

5 = After run quantity recording in MODE 2 ends<br />

a = After run quantity recorded in MODE 1<br />

b = After run quantity recorded in MODE 2<br />

s = Low flow cut <strong>of</strong>f<br />

Page 150 • MN0M023<br />

Issue/Rev. 0.2 (12/12)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!