STEELE FOUNDATION, LLC NOTES<br />
12" SAN. S<br />
INV1 45.7±<br />
INV2 45.86±<br />
EXISTING CURB<br />
EXISTING CURB<br />
1<br />
R4409-2<br />
WISCONSIN AVENUE NW<br />
4" WATER<br />
INV 47.6±<br />
SAN S.<br />
INV1 46.3±<br />
INV2 46.2±<br />
TEL<br />
EL. 52.48±<br />
12" WATER<br />
INV 52.6±<br />
UGE<br />
EL. 47.5±<br />
EXISTING CURB<br />
UGE<br />
EL. 46.48±<br />
EXISTING SIDEWALK<br />
+57±<br />
86'-10"<br />
2 SPACES @ 5'-0"± = 10'-0"± 2 SPACES @ 6'-0"± = 12'-0"±<br />
3 SPACES @5'-9"± = 17'-3"± 7 SPACES @ 5'-6"± = 38'-6"± 3 SPACES @ 6'-0"± = 18'-0"±<br />
PL<br />
2'-5"<br />
2'-2"<br />
2'-0"<br />
5<br />
1'-10"<br />
PL<br />
+56±<br />
+55±<br />
+54±<br />
+53±<br />
+52±<br />
+51±<br />
1<br />
15<br />
10<br />
EXISTING<br />
GRAVITY WALL<br />
4'-3"<br />
+48± +46± +44±<br />
+50±<br />
4'-3"<br />
+44± +44± +44±<br />
(26.6)<br />
(28.2)<br />
(28.2)<br />
(28.2)<br />
(28.2)<br />
(28.2)<br />
(26.6)<br />
8'-11"±<br />
(26.6)<br />
(26.6)<br />
(26.6) (26.6)<br />
4"Ø STD. PIPE<br />
(TYP. LACING)<br />
6'-6"<br />
+43±<br />
(28.2)<br />
(35.3)<br />
(26.4) (28.3)<br />
+50±<br />
(28.2)<br />
55'-0"<br />
2<br />
R4409-2<br />
45<br />
(35.0)<br />
RAMP<br />
UP<br />
1st FLOOR EL. 47.8<br />
GARAGE 1 EL. 39.1<br />
GARAGE 2 T/SLAB EL. 30.4<br />
S.G. EL. 29.4±<br />
+49±<br />
+42±<br />
WATERS ALLEY NW<br />
C&O CANAL<br />
UNEXCAVATED<br />
(26.6)<br />
(26.6)<br />
(28.2) (26.6)<br />
(28.2)<br />
(28.2)<br />
(28.2)<br />
12 SPACES @ 6'-0"± = 72'-0"±<br />
89'-9"<br />
(28.2)<br />
(12'-WIDE)<br />
40<br />
(35.3)<br />
(26.4)<br />
EXISTING<br />
RETAINING WALL<br />
(28.2)<br />
GENERAL CONTRACTOR TO<br />
TEST PIT BY HAND THE<br />
EXISTING VERIZON DUCT<br />
BANK PRIOR TO SOLDIER<br />
BEAM INSTALLATION<br />
+48±<br />
7'-0"<br />
3<br />
(26.6)<br />
(26.6)<br />
(26.6)<br />
(26.6)<br />
(26.6)<br />
R4409-2<br />
1'-10"±<br />
(28.2)<br />
(28.2)<br />
(28.2)<br />
(28.2) (28.2)<br />
(26.6)<br />
+43.4±<br />
25<br />
+43±<br />
+43±<br />
30<br />
+44±<br />
+45±<br />
+46±<br />
+47±<br />
(35.3)<br />
20<br />
5'-4"±<br />
(35.0) (35.0)<br />
(35.0)<br />
5 SPACES @ 6'-0"± = 30'-0"±<br />
3 SPACES @ 5'-9"± = 16'-6"±<br />
3 SPACES @ 5'-3"± = 15'-9"±<br />
3 SPACES @6'-0"± = 18'-0"±<br />
2 SPACES @ 6'-2"± = 12'-4"±<br />
35<br />
5'-0" 4"Ø STD. PIPE<br />
(TYP. LACING)<br />
83'-5"<br />
1<br />
(40.3)<br />
(40.3)<br />
R4409-2<br />
EXISTING BUILDING<br />
GROUND FLOOR EL. 40.0<br />
GARAGE 1 T/SLAB EL. 39.1<br />
S.G. EL. 38.1±<br />
SAN S.<br />
INV 38.2±<br />
1. ALL WORK DETAILED ON THESE DRAWINGS IS TO BE PERFORMED BY STEELE<br />
FOUNDATION, LLC IN ACCORD WITH THEIR STANDARD PRACTICE AND THE<br />
BUILDING CODE.<br />
2. GENERAL CONTRACTOR SHALL MAINTAIN AND PROVIDE BENCHES AND<br />
BERMS. BERMS SHOWN ARE TO REMAIN IN PLACE UNTIL BRACES OR<br />
TIEBACKS ARE INSTALLED. ADJUST DIMENSIONS IN FIELD TO FIT. ALL<br />
SOLDIER BEAMS AND LAGGING TO REMAIN IN PLACE EXCEPT FOR REMOVAL<br />
BELOW FINISHED GRADE AS FOLLOWS:<br />
A: TOP 2FT. ON PRIVATE PROPERTY<br />
B: TOP 4FT. ON PUBLIC SPACE<br />
3. STRUCTURAL MEMBERS USED SHALL HAVE EQUIVALENT STRENGTH TO<br />
THOSE SCHEDULED. MATERIALS TO BE NEW OR, IF IN SOUND CONDITION,<br />
USED. LAGGING TO BE 3" UNTREATED NATIVE HARDWOOD LUMBER.<br />
4. WELDING NOTES:<br />
A: MINIMUM SIZE 5/16" FILLET, MINIMUM LENGTH 3 INCHES<br />
B: KNEEBRACES - CONTINUOUS WELD 1 SIDE OF FLANGE AND BOTH<br />
SIDES OF WEB<br />
C: STIFFENERS - TACK WELD TO WEB AND FLANGES<br />
D: SPLICES - SINGLE BEVEL GROOVE WELD, FLANGES AND WEB<br />
E: INCLINED BRACES - CONTINUOUS WELD 1 SIDE, TOP & BOTTOM<br />
FLANGES WHERE BOTTOM FLANGE DOES NOT BEAR, WELD BOTH<br />
SIDES OF WEB 10 IN. OR FULL CONTACT DEPTH OF WEB,<br />
WHICHEVER IS LESSER.<br />
F: CROSSLOT BRACES - CONTINUOUS WELD 1 SIDE EA. FLANGE, OR<br />
WHERE BOTTOM FLANGE DOES NOT BEAR, CONTINUOUS WELD 1<br />
SIDE OR TOP FLANGE AND CONTACT DEPTH OF WEB.<br />
G: TUBE BRACES - WELD 3 SIDES<br />
5. ALL STRUCTURAL STEEL TO BE ASTM A-572 GRADE 50. MICROPILE STEEL TO<br />
BE N80 WITH YIELD STRENGTH OF 80 KSI.<br />
6. BRACES TO BEAR AGAINST CONCRETE HEELS OR FOOTINGS AS DETERMINED<br />
IN THE FIELD AND THEY MAY BE SHIFTED FROM PLAN LOCATION,<br />
SEPARATED OR COMBINED AS FIELD CONDITIONS REQUIRE. HEEL CONCRETE<br />
TO BE f'c = 2500 PSI.<br />
7. WORK THIS DRAWING WITH ARCHITECTURAL, STRUCTURAL & SITE PLAN<br />
DRAWINGS. WHERE CONFLICT OCCURS BETWEEN ARCHITECTURAL &<br />
STRUCTURAL DRAWINGS, FOLLOW STRUCTURAL.<br />
8. NO CONTRACTOR OR SUBCONTRACTOR MAY USE OR RELY ON THESE<br />
DRAWINGS FOR LOCATIONS OF UTILITY LINES. GENERAL CONTRACTOR IS TO<br />
CONTACT THE UTILITY OWNERS FOR ASSISTANCE IN LOCATING &<br />
REMOVING/RELOCATING ALL SUCH LINES AND SERVICES, ETC. GENERAL<br />
CONTRACTOR TO POSITIVELY FIELD LOCATE EXISTING UTILITIES PRIOR TO<br />
INSTALLATION OF SOLDIER BEAMS. CONTACT "MISS UTILITY" PRIOR TO<br />
BEGINNING EXCAVATION AS REQUIRED BY LAW.<br />
9. NO CONTRACTOR OR SUBCONTRACTOR SHALL RELY ON DIMENSIONS &<br />
GRADES SHOWN ON THESE DRAWINGS WITHOUT VERIFYING THEIR<br />
CORRECTNESS BY FIELD MEASURE. "ON LINE SHEETING" DIMENSIONS ARE<br />
TO NEAT CONCRETE LINE 3 INCH TOLERANCE TO BE ADDED IN FIELD.<br />
10. GENERAL CONTRACTOR SHALL, PRIOR TO INSTALLING SOLDIER BEAMS AND<br />
BRACES, PROVIDE THE FOLLOWING FREE OF CHARGE AS REQUIRED BY<br />
STEELE FOUNDATION, LLC:<br />
A: FIELD LAYOUT OF NEW AND EXISTING WALLS, FOOTINGS, GRADE<br />
BEAMS, CAISSONS, AND COLUMNS FOR SOLDIER BEAM, WALE,<br />
CORNER BRACES, RAKERS, TIEBACKS AND HEEL BLOCK<br />
INSTALLATION.<br />
B: FIELD LAYOUT OF TOWER CRANE PAD LOCATION, ELEVATOR<br />
PLUNGER SHAFTS, SUMPS, ETC. TO PERMIT LOCATION OF WORK TO<br />
CLEAR.<br />
C: REMOVAL OF OBSTRUCTIONS.<br />
D: GROUNDWATER IS TO BE CONTROLLED BY THE GENERAL<br />
CONTRACTOR TO ALLOW ACCESS TO, FROM, AND AROUND THE<br />
SITE WITHOUT THE USE OF MATS.<br />
11. IN THE EVENT THE FOOTING ELEVATIONS ARE TO BE LOWERED BELOW<br />
GRADES SHOWN ON SUBCONTRACTORS DRAWINGS, PRIOR TO EXCAVATING<br />
BELOW THESE GRADES, THE GENERAL CONTRACTOR WILL IMMEDIATELY<br />
ADVISE SUBCONTRACTOR AND ALLOW HIM ADEQUATE TIME TO REDESIGN<br />
THE SHEETING & BRACING TO ACCOMMODATE THE CHANGED GRADES &<br />
INSTALL THE NECESSARY ADDITIONAL WORK.<br />
12. SOIL BORINGS FROM JULY 8, 2010 SCHNABEL ENGINEERING GEOTECHNICAL<br />
REPORT USED TO DEVELOP THESE DRAWINGS.<br />
13. SURCHARGES IMPOSED BY MATERIALS, MACHINERY, &/OR CRANES MUST BE<br />
PROVIDED PRIOR TO INSTALLATION OF SOLDIER BEAMS TO ALLOW FOR<br />
REDESIGN. STEELE FOUNDATION, LLC ASSUMES NO LIABILITY RELATED TO<br />
THE OPERATION EQUIPMENT OR MATERIALS SURCHARGING THE<br />
ENGINEERED SYSTEM SHOWN ON THESE DRAWINGS.<br />
GENERAL TIEBACK TESTING AND STRESSING REQUIREMENTS<br />
DESCRIPTION<br />
EACH TIEBACK SHALL BE TESTED. THE MAXIMUM TEST LOAD SHALL NOT<br />
EXCEED 80 PERCENT OF THE GUARANTEED ULTIMATE TENSILE STRENGTH<br />
(G.U.T.S.) OF THE TENDON. THE TEST LOAD SHALL BE SIMULTANEOUSLY<br />
APPLIED TO THE ENTIRE TENDON. NO PERFORMANCE TESTING IS REQUIRED.<br />
ALLTIEBACKS WILL BE PROOF TESTED.<br />
THE TIEBACK TESTING EQUIPMENT SHALL CONSIST OF:<br />
· A DIAL GAUGE OF VERNIER SCALE CAPABLE OF MEASURING TO<br />
0.001-OF-AN-INCH OF TIEBACK MOVEMENT AND AN INDEPENDENT<br />
REFERENCE FRAME.<br />
· A HYDRAULIC JACK AND PUMP TO APPLY THE TEST LOAD. THE JACK AND<br />
PRESSURE GAUGE SHALL BE CALIBRATED BY AN INDEPENDENT FIRM AS A<br />
UNIT. THE PRESSURE GAUGE WILL BE USED TO MEASURE THE APPLIED LOAD.<br />
PROOF TESTING<br />
PROOF TESTING SHALL BE PERFORMED BY INCREMENTALLY LOADING THE<br />
TIEBACKS IN ACCORDANCE WITH THE FOLLOWING SCHEDULE (PER PTI 8.3.3).<br />
THE LOAD SHALL BE RAISED FROM ONE INCREMENT TO ANOTHER AS RAPIDLY<br />
AS POSSIBLE. THE TIEBACK MOVEMENTS SHALL BE MEASURED FROM THE<br />
ALIGNMENT LOAD AND RECORDED TO THE NEAREST 0.001-OF-AN-INCH WITH<br />
RESPECT TO AN INDEPENDENT FIXED REFERENCE POINT AT EACH INCREMENT<br />
OF LOAD. THE ALIGNMENT LOAD IS A NOMINAL LOAD MAINTAINED ON THE<br />
TIEBACK TO KEEP THE TESTING EQUIPMENT IN POSITION. THE TEST LOAD SHALL<br />
BE MONITORED WITH A PRESSURE GAUGE. AT LOAD INCREMENTS OTHER THAN<br />
THE MAXIMUM TEST LOAD, THE LOAD SHALL BE HELD JUST LONG ENOUGH TO<br />
OBTAIN A READING. THE MAXIMUM TEST LOAD SHALL BE HELD FOR 10 MINUTES<br />
WITH READINGS TAKEN AT 1, 2, 3, 4, 5, 6, AND 10 MINUTES. IF THE TOTAL<br />
MOVEMENT BETWEEN 1 AND 10 MINUTES IS GREATER THAN 0.04, THE LOAD<br />
HOLD WILL BE EXTENDED AND READINGS WILL BE TAKEN EVERY 5 MINUTES<br />
UNTIL THE RATE OF MOVEMENT IS LESS THAN 0.08 PER LOG CYCLE.<br />
AL 0.25DL 0.50DL 0.75DL 1.00DL 1.20DL (10 MINUTE HOLD)<br />
WHERE: AL = ALIGNMENT LOAD<br />
DL = DESIGN LOAD<br />
TIEBACK TEST ACCEPTANCE CRITERIA<br />
A PROOF TESTED TIEBACK IS ACCEPTED IF:<br />
· THE TIEBACK CARRIES THE MAXIMUM TEST LOAD.<br />
· THE MOVEMENT BETWEEN 1 AND 10 MINUTES IS LESS THAN 0.04 OR THE<br />
RATE OF MOVEMENT IS LESS THAN 0.08 PER LOG CYCLE.<br />
· TOTAL MOVEMENT IS GREATER THAN 80% THEORETICAL ELASTIC<br />
UNBONDED LENGTH MOVEMENT (PL/AE).<br />
WHEN A TIEBACK DOES NOT HOLD THE DESIRED LOAD, STEELE FOUNDATION,<br />
LLC MAY MODIFY THE DESIGN AND/OR THE CONSTRUCTION PROCEDURES.<br />
THESE MODIFICATIONS MAY INCLUDE, BUT ARE NOT LIMITED TO,<br />
POST-GROUTING AND RETESTING, MODIFYING INSTALLATION METHODS OR<br />
CHANGING THE TIEBACK TYPE.<br />
APPROVED FOR WORK TO BE PERFORMED BY STEELE FOUNDATION, LLC<br />
6-11-2012 - SUPPORT OF VERIZON DUCT BANK<br />
BY:<br />
BEYER BLINDER BELLE - ARCHITECTS<br />
TADJER-COHEN-EDELSON - STRUCTURAL ENGINEER<br />
MCCULLOUGH CONSTRUCTION - GENERAL CONTRACTOR<br />
REVISION<br />
MARK<br />
DATE<br />
SCALE<br />
DATE<br />
DRAWN BY<br />
AS SHOWN<br />
5-1-2012<br />
CM/ME<br />
ENGINEERED FOUNDATION CONSTRUCTION 3299 K STREET, N.W., WASHINGTON, D.C. 20007 (202) 342-1194<br />
LOCK-OFF<br />
SCALE: 1/8" = 1'-0"<br />
S.B. #<br />
TIEBACK<br />
(EL.)<br />
TIEBACK<br />
ANGLE<br />
TIEBACK SCHEDULE @ SOLDIER BEAMS<br />
# OF 0.6"<br />
STRANDS<br />
FIRST TIER<br />
TEST LOAD<br />
(KIPS)<br />
LOCK-OFF<br />
LOAD (KIPS)<br />
SOLDIER BEAM SCHEDULE<br />
SOLDIER<br />
BEAM N°<br />
1-49<br />
UNBONDED<br />
LENGTH (FT)<br />
SIZE<br />
7"Ø Micropile<br />
x 0.316" Wall<br />
S.B.<br />
TIP<br />
(EI.)<br />
21.6±<br />
BONDED<br />
LENGTH (FT)<br />
1-18 32.4 3:1 2 78 65 15 15<br />
19-35 31.4 3:1 2 78 65 15 15<br />
36-49 41 3:1 2 61 60 15 15<br />
Steele Foundation LLC ID#: 168051<br />
Ticket no. TBD<br />
Date:<br />
TBD<br />
Miss Utility Phone# DC: 800-257-7777; MD 1-800-257-7777<br />
VA: 800-552-7001<br />
UPON COMPLETION OF THE TIEBACK TEST, THE TIEBACK WILL BE COMPLETELY<br />
UNLOADED. THE TIEBACK WILL THEN BE LOADED TO THE INDICATED LOCK-OFF<br />
LOAD ON THE STEELE FOUNDATION, LLC TIEBACK SCHEDULE AND<br />
TRANSFERRED TO THE ANCHORAGE. THE MINIMUM LOCK-OFF LOAD SHALL BE<br />
50% OF G.U.T.S. PER STRAND.<br />
SUPPORT OF EXCAVATION MONITORING PLAN:<br />
1. AS PART OF THE EXISTING SITE SURVEY, THE OWNER WILL ENGAGE A<br />
GEOTECHNICAL ENGINEER TO PERFORM THE FOLLOWING:<br />
a. BEFORE THE START OF CONSTRUCTION, TAKE PHOTOGRAPHS OF THE<br />
SITE AND SURROUNDING PROPERTIES IN SUFFICIENT NUMBER TO SHOW<br />
ALL EXISTING CONDITIONS AND IN SUFFICIENT DETAIL TO<br />
ACCURATELY RECORD THE PHYSICAL CONDITIONS OF THE BUILDINGS.<br />
2. AT THE COMMENCEMENT OF BELOW GRADE EXCAVATION WORK THE<br />
GEOTECHNICAL ENGINEER WILL OBTAIN BASELINE DATA ON THE POSITION<br />
OF THE SUPPORT OF EXCAVATION SYSTEM. THESE BASELINE<br />
MEASUREMENTS AND SUBSEQUENT MOVEMENT EVALUATION WILL BE<br />
PERFORMED USING COMMONLY USED SURVEY EQUIPMENT SUCH AS A<br />
TOTAL STATION. THE SUPPORT OF EXCAVATION SYSTEM WILL BE<br />
MONITORED FOR BOTH VERTICAL AND LATERAL MOVEMENT.<br />
3. THE SUPPORT OF EXCAVATION MONITORING WILL BE PERFORMED BY THE<br />
GEOTECHNICAL ENGINEER. MONITORING FREQUENCY WILL REMAIN AT<br />
TWICE PER WEEK UNTIL THE STRUCTURAL ENGINEER OF RECORD,<br />
INDICATES THAT ALL BELOW GRADE LEVEL WALLS AND FLOORS ARE<br />
CONSTRUCTED AND CAPABLE OF RESISTING THE BELOW GRADE SOIL AND<br />
WATER PRESSURES.<br />
4. THE MONITORING READINGS WILL BE TRANSMITTED VERBALLY THE DAY<br />
OF THE WORK TO THE GENERAL CONTRACTOR AND STEELE FOUNDATION.<br />
WRITTEN REPORTS CONTAINING THE MONITORING DATA AND<br />
CORRESPONDING GRAPHICAL PRESENTATION OF THE WORK WILL BE<br />
SUBMITTED TO THE STRUCTURAL ENGINEER, THE GENERAL CONTRACTOR,<br />
AND STEELE WITHIN 3 DAYS.<br />
SUPPORT OF EXCAVATION CONTINGENCY PLAN:<br />
1. IF HORIZONTAL MOVEMENTS OF THE SUPPORT OF EXCAVATION EXCEED 0.5<br />
INCHES OR VERTICAL MOVEMENTS OF THE SUPPORT OF EXCAVATION<br />
EXCEED 0.2 INCHES, THE SUPPORT OF EXCAVATION DESIGN ENGINEER,<br />
JAMES ANDREW STEELE (STEELE FOUNDATION, LLC, 202-342-1194), MUST BE<br />
CONTACTED IMMEDIATELY TO ASSESS WHAT MEASURES WILL BE TAKEN.<br />
PLAN<br />
VERIZON SOCO BUILDING<br />
1045 WISCONSIN AVENUE, WASHINGTON, D.C. 20007<br />
STEELE FOUNDATION, LLC<br />
DRAWING NO.<br />
R4409-1
STEEL PLATE 7"x7"x1 1/2"<br />
A1<br />
25'-11"<br />
SCALE<br />
AS SHOWN<br />
CL<br />
MICROPILE<br />
EQUAL<br />
7" O.D. MICROPILE CASING<br />
tw = 0.316"<br />
3/16"<br />
3/16"<br />
WALE-<br />
DOUBLE<br />
CHANNEL<br />
3/16" 3" @ 24"<br />
6" MIN<br />
SCALE: 1" = 1'-0"<br />
3/16" 3" @ 24"<br />
VARIES<br />
CL<br />
SCALE: 1" = 1'-0"<br />
SCALE: 1/2" = 1'-0"<br />
SCALE: 1-1/2" = 1'-0"<br />
3/16"<br />
A<br />
R4409-2<br />
TIEBACK<br />
A1<br />
R4409-2<br />
D1<br />
R4409-2<br />
B<br />
R4409-2<br />
MICROPILE<br />
(BEYOND)<br />
EQUAL<br />
HP 10x42<br />
C L<br />
ANCHOR HEAD<br />
C12 x 20.7<br />
STEEL ANGLE 3"x3"x1/4" (TYP.)<br />
3" UNTREATED<br />
HARDWOOD LAGGING<br />
A1<br />
INV.<br />
EL. UNKNOWN<br />
12"Ø WATER (E)<br />
1<br />
1<br />
INV.<br />
EL. UNKNOWN<br />
1<br />
TELEPHONE (E)<br />
PL<br />
WASA ZONE OF<br />
INFLUENCE<br />
3<br />
INV.<br />
EL.UNKNOWN<br />
UGE (E)<br />
CURB<br />
WISCONSIN AVENUE NW<br />
WATERS ALLEY NW<br />
EX. GRADE EL. 50.0±<br />
INV. EL. UNKNOWN<br />
20' BONDED 15' UNBONDED<br />
3"Ø GAS (ABANDONED)<br />
4"Ø WATER (E)<br />
6'-8"<br />
DUCT BANK<br />
3" LAGGING<br />
SOLDIER BEAM: DRILLED MICROPILE WITH<br />
7"Ø (tw = 0.316") CASING AND GROUT<br />
4'-9"<br />
UGE (E)<br />
3'-0"<br />
1<br />
1<br />
WASA ZONE OF<br />
INFLUENCE<br />
1<br />
3<br />
40'-6"<br />
31'-10"<br />
15'-0"<br />
EX GRADE EL. 53±<br />
PL<br />
4'-3"<br />
VARIES<br />
15' BONDED 15' UNBONDED<br />
PLBL<br />
1'-11"<br />
3"±<br />
C<br />
R4409-2<br />
FACE OF<br />
SHEETING<br />
ALLEY ADJACENT<br />
TO BUILDING<br />
STRAP UTILITY TO<br />
W6x20 BEAMS<br />
EL. 41±<br />
W6x20 BETWEEN<br />
SOLDIER BEAMS<br />
3" LAGGING<br />
SOLDIER BEAM: DRILLED<br />
MICROPILE WITH 7"Ø ( tw = 0.316")<br />
CASING AND GROUT<br />
T/SLAB 1st FLOOR<br />
EL. 47.87<br />
W6x20 ON TOP OF<br />
UTILITY BOLTED TO<br />
EXISTING WALL<br />
T/SLAB GARAGE 1<br />
EL. 39.1<br />
S.G. EL. 29.4±<br />
T/SLAB GARAGE 2<br />
EL. 30.4<br />
BL<br />
FACE OF<br />
EXISTING WALL<br />
3"± TO FACE<br />
OF SHEETING<br />
D<br />
R4409-2<br />
S.B.TIP ELEVATION<br />
(SEE SCHEDULE)<br />
A<br />
R4409-2<br />
EL. 32.4±<br />
T/SLAB 1st FLOOR<br />
EL. 47.87<br />
T/SLAB GARAGE 1<br />
EL. 39.1<br />
ROCK TO BE LINE DRILLED BY<br />
OTHERS PRIOR TO EXCAVATION<br />
TO PREVENT BREAK-BACK OF<br />
ROCK. HEIGHT OF EXCAVATION<br />
LIFT TO BE DETERMINED TO SUIT<br />
FIELD CONDITIONS<br />
T/SLAB GARAGE 2<br />
EL. 30.4<br />
S.G. EL. 29.4±<br />
B/FTG EL. 26.6<br />
SCALE: 1/4" = 1'-0"<br />
EX. FOOTING PROJECTION<br />
TO BE REMOVED BY OTHERS<br />
AFTER SOLDIER BEAM<br />
INSTALLATION<br />
1<br />
R4409-2<br />
EL. 31.4±<br />
1<br />
1<br />
1'-10"±<br />
3"± TO FACE<br />
OF SHEETING<br />
1<br />
BL<br />
S.B.TIP ELEVATION<br />
(SEE SCHEDULE)<br />
3<br />
PL<br />
WASA ZONE OF<br />
INFLUENCE<br />
FACE OF<br />
EXISTING BUILDING<br />
1'-4"<br />
3" LAGGING<br />
EXISTING<br />
BUILDING<br />
R4409-2<br />
15' UNBONDED<br />
SOLDIER BEAM: DRILLED<br />
MICROPILE WITH 7"Ø ( tw = 0.316")<br />
CASING AND GROUT<br />
WATERS ALLEY NW<br />
EX. GRADE EL. 50.0±<br />
INV. EL. UNKNOWN<br />
20' BONDED 15' UNBONDED<br />
3"Ø GAS (ABANDONED)<br />
SOLDIER BEAM: DRILLED MICROPILE WITH<br />
7"Ø (tw = 0.316") CASING AND GROUT<br />
E<br />
4"Ø WATER (E)<br />
6'-8"<br />
DUCT BANK<br />
3" LAGGING<br />
4'-9"<br />
UGE (E)<br />
T/SLAB 1st FLOOR<br />
EL. 52.5<br />
3'-0"<br />
T/S.O.G.<br />
EL. 37.5<br />
3<br />
PLBL<br />
1'-11"<br />
3"±<br />
1<br />
FACE OF<br />
SHEETING<br />
15' BONDED<br />
ALLEY ADJACENT<br />
TO BUILDING<br />
EL. 41±<br />
T/SLAB 1st FLOOR<br />
EL. 47.87<br />
T/SLAB GARAGE 1<br />
EL. 39.1<br />
S.G. EL. 29.4±<br />
T/SLAB GARAGE 2<br />
EL. 30.4<br />
APPROVED FOR WORK TO BE PERFORMED BY STEELE FOUNDATION, LLC<br />
BEYER BLINDER BELLE - ARCHITECTS<br />
TADJER-COHEN-EDELSON - STRUCTURAL ENGINEER<br />
6-11-2012 - SUPPORT OF VERIZON DUCT BANK<br />
BY:<br />
MCCULLOUGH CONSTRUCTION - GENERAL CONTRACTOR<br />
REVISION<br />
MARK<br />
DATE<br />
DATE<br />
DRAWN BY<br />
5-1-2012<br />
CM/ME<br />
ENGINEERED FOUNDATION CONSTRUCTION 3299 K STREET, N.W., WASHINGTON, D.C. 20007 (202) 342-1194<br />
D1<br />
VARIES<br />
12" x 16" x 7/16"<br />
Plate<br />
6 each -3/4" Dia. Kwik<br />
Bolts w/ 4-3/4"<br />
min. embed.<br />
3/4" x 12" Plate<br />
cut to fit<br />
PL<br />
4'-3"<br />
9"±<br />
1'-1"±<br />
BL<br />
1'-0"<br />
D1<br />
3/16"<br />
3/16"<br />
2'-6"±<br />
2'-6"±<br />
1'-0"<br />
BL<br />
1'-1"±<br />
9"±<br />
2'-2"±<br />
12" x 12" x 7/16"<br />
Plate<br />
2-1/2" Dia. Kwik<br />
Bolts w/ 3-1/2"<br />
min. embed.<br />
3/4" x 12" Plate<br />
cut to fit<br />
2" DRYPACK<br />
BRACKET - HP12x53<br />
BACKFILL WITH<br />
CONCRETE f'c=2500 psi<br />
SPLIT HP12x53 KNEE BRACE<br />
3/8" WELD ONE SIDE OF<br />
EACH FLANGE AND WEB.<br />
BRACKET PILE SEQUENCING NOTES:<br />
S.B.TIP ELEVATION<br />
(SEE SCHEDULE)<br />
1. INSTALL MICROPILE FROM EXISTING GRADE.<br />
B/FTG EL. 26.6<br />
2. EXPOSE BOTTOM OF EXISTING WALL AT EACH MICROPILE LOCATION.<br />
3. IF WALL BEARS ON ROCK, BLOCK WALL TO MICROPILE (DETAIL D).<br />
4. IF WALL BEARS ON SOIL, INSTALL BRACKET UNDER WALL AND REPLACE<br />
SOIL WITH 2500 PSI CONCRETE (DETAIL E).<br />
5. LINE DRILLING OF ROCK BY OTHERS.<br />
SCALE: 1/4" = 1'-0"<br />
3<br />
R4409-2<br />
TENDON BOND LENGTH FREE STRESSING LENGTH<br />
TENDON<br />
FACE OF SOLDIER<br />
BEAM FLANGE<br />
ONE FOOT± TOLERANCE FROM<br />
ELEVATION SHOWN<br />
NEAT CONCRETE ENCASEMENT<br />
5 TO 6 GALLONS PER SACK BERMLINE<br />
(30' MIN. WIDTH)<br />
SCALE: 1/4" = 1'-0"<br />
2'-0"±<br />
2<br />
R4409-2<br />
S.B.TIP ELEVATION<br />
(SEE SCHEDULE)<br />
B/FTG EL. 26.6<br />
DETAILS AND NOTES<br />
VERIZON SOCO BUILDING<br />
1045 WISCONSIN AVENUE, WASHINGTON, D.C. 20007<br />
STEELE FOUNDATION, LLC<br />
PROPOSED NEW WALL<br />
5/16"<br />
SCALE: 1/2" = 1'-0"<br />
D<br />
R4409-2<br />
PROPOSED NEW WALL<br />
5/16"<br />
SCALE: 1/2" = 1'-0"<br />
E<br />
R4409-2<br />
NOT TO SCALE<br />
C<br />
R4409-2<br />
DRAWING NO.<br />
R4409-2