17.01.2015 Views

Post office guide part i - India Post

Post office guide part i - India Post

Post office guide part i - India Post

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

REGISTER SHOWING PARTICULARS OF REPAIRS MADE IN THE FRANKING MACHINES<br />

(To be maintained by PMRO)<br />

Name of the <strong>office</strong> Particulars of Date of which Name of the Date on which Reasons for Meter reading<br />

where the machine the franking information mechanic who the mechanic delay in repairs at the time of<br />

is installed machine regarding de- attend the was deputed if any repairs.<br />

fects in the repairs and the<br />

F/M was<br />

machine was<br />

received<br />

repaired.<br />

1 2 3 4 5 6 7<br />

Meter reading after the Signature of the Signature of the Manager<br />

machine was repaired<br />

mechanic<br />

8 9 10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!