17.01.2015 Views

Post office guide part i - India Post

Post office guide part i - India Post

Post office guide part i - India Post

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(vii)<br />

If any docket or slip is found missing in the main <strong>office</strong>, a copy<br />

thereof should be called for from the licencee and kept in the<br />

file at the appropriate place. The Franking Machine Record<br />

Book and ledger should be maintained properly and checked<br />

by the Inspecting Officers during the annual inspection.<br />

(viii) The entries in the Franking Machine ledger should be checked<br />

once in a month by the PM/DPM/SPM to see if they are<br />

correctly being made w.r.to the daily dockets etc. He will sign<br />

the last entry checked in token of having carried out this check.<br />

31. Procedure for the repairs of the hired Franking Machines<br />

(i)<br />

(ii)<br />

(iii)<br />

(iv)<br />

(v)<br />

Arrangements for the maintenance, repairing and oiling<br />

machines will be made by the deptt.<br />

in case the defect does not relate to the meter the machine<br />

should be opened and repaired by the mechanic in the presence<br />

of the Gazetted drawing and disbursing <strong>office</strong> or an <strong>office</strong>r of<br />

an equal rank in charge of the dispatch section having the<br />

Franking Machine.<br />

In case the defects relate to the meter also the machine should<br />

be repaired by the mechanic in the presence of the aforesaid<br />

<strong>office</strong>r and the PRI.<br />

In case the machine required extensive repairs in the workshop<br />

of the Deptt. a stand by machine will be supplied by the Deptt.<br />

to the licensee for use during the period the defective machine<br />

remains in the workshop. The meter in the standby machine<br />

will be set according to the reading of the machine of the<br />

licenses. A record to this effect will be made in the Franking<br />

Machine Record Book and FM Register of postings under the<br />

signatures of the mechanic PRI and the <strong>office</strong>r in charge of the<br />

dispatch section having the Franking Machine.<br />

The entries to the effect that the machine was defective and<br />

repaired should be made in the Franking Machine Record<br />

Books, where meter readings before and after the repairs<br />

should also be recorded. These entries should be attested by<br />

the mechanic and other <strong>office</strong>r (s) mentioned in item (ii) & (iii)<br />

above as the case may be. These entries should also be made<br />

in the PO records viz. F.M. Record Book & F.M. Ledger &<br />

three entries should be attested by the PM/DPM/SPM.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!