17.01.2015 Views

Track Record 41, October to December 2009 - Public Transport ...

Track Record 41, October to December 2009 - Public Transport ...

Track Record 41, October to December 2009 - Public Transport ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MINISTER’S FOREWORD<br />

An important miles<strong>to</strong>ne in the delivery of the $38 billion Vic<strong>to</strong>rian <strong>Transport</strong> Plan has<br />

been achieved with the commencement of new contracts between the Vic<strong>to</strong>rian<br />

Government and Melbourne’s new train and tram opera<strong>to</strong>rs.<br />

Metro Trains Melbourne (MTM) and Keolis Downer EDI (KDR) assumed operational<br />

control of the metropolitan train and tram networks on 30 November <strong>2009</strong>,<br />

heralding a new partnership with the Vic<strong>to</strong>rian Government <strong>to</strong> provide passengers<br />

with safe, clean and reliable public transport.<br />

Both opera<strong>to</strong>rs were chosen because of their commitments <strong>to</strong> continuously<br />

improve the train and tram services. These commitments are backed by updated<br />

franchise arrangements designed <strong>to</strong> meet cus<strong>to</strong>mer expectations.<br />

Performance measures for punctuality and reliability have been <strong>to</strong>ughened: a train or tram must now arrive<br />

within five minutes of its scheduled time <strong>to</strong> be regarded as on-time. Punctuality was previously defined as<br />

arriving within six minutes of the scheduled time.<br />

In addition, the reliability measure has now been expanded. This measure continues <strong>to</strong> include cancelled<br />

services, but now also includes services that complete some but not all of the scheduled journey.<br />

Under updated Operational Performance Regime arrangements, good performance will be rewarded<br />

with bonuses while failure <strong>to</strong> meet target benchmarks will result in fines of up <strong>to</strong> $1 million a month. A new<br />

Cus<strong>to</strong>mer Experience Performance Regime will also apply <strong>to</strong> ensure safety, cleanliness and information are<br />

core parts of service delivery.<br />

The <strong>Track</strong> <strong>Record</strong> quarterly and monthly bulletins will continue <strong>to</strong> provide the community with access <strong>to</strong><br />

performance results and ensure we have an open and accountable system.<br />

Through the Vic<strong>to</strong>rian <strong>Transport</strong> Plan, the Government is taking action <strong>to</strong> build a better transport network.<br />

MTM and KDR, along with our other public transport opera<strong>to</strong>rs, will be significant contribu<strong>to</strong>rs <strong>to</strong> that plan.<br />

MARTIN PAKULA MP<br />

Minister for <strong>Public</strong> <strong>Transport</strong><br />

2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!