Track Record 41, October to December 2009 - Public Transport ...
Track Record 41, October to December 2009 - Public Transport ...
Track Record 41, October to December 2009 - Public Transport ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
MINISTER’S FOREWORD<br />
An important miles<strong>to</strong>ne in the delivery of the $38 billion Vic<strong>to</strong>rian <strong>Transport</strong> Plan has<br />
been achieved with the commencement of new contracts between the Vic<strong>to</strong>rian<br />
Government and Melbourne’s new train and tram opera<strong>to</strong>rs.<br />
Metro Trains Melbourne (MTM) and Keolis Downer EDI (KDR) assumed operational<br />
control of the metropolitan train and tram networks on 30 November <strong>2009</strong>,<br />
heralding a new partnership with the Vic<strong>to</strong>rian Government <strong>to</strong> provide passengers<br />
with safe, clean and reliable public transport.<br />
Both opera<strong>to</strong>rs were chosen because of their commitments <strong>to</strong> continuously<br />
improve the train and tram services. These commitments are backed by updated<br />
franchise arrangements designed <strong>to</strong> meet cus<strong>to</strong>mer expectations.<br />
Performance measures for punctuality and reliability have been <strong>to</strong>ughened: a train or tram must now arrive<br />
within five minutes of its scheduled time <strong>to</strong> be regarded as on-time. Punctuality was previously defined as<br />
arriving within six minutes of the scheduled time.<br />
In addition, the reliability measure has now been expanded. This measure continues <strong>to</strong> include cancelled<br />
services, but now also includes services that complete some but not all of the scheduled journey.<br />
Under updated Operational Performance Regime arrangements, good performance will be rewarded<br />
with bonuses while failure <strong>to</strong> meet target benchmarks will result in fines of up <strong>to</strong> $1 million a month. A new<br />
Cus<strong>to</strong>mer Experience Performance Regime will also apply <strong>to</strong> ensure safety, cleanliness and information are<br />
core parts of service delivery.<br />
The <strong>Track</strong> <strong>Record</strong> quarterly and monthly bulletins will continue <strong>to</strong> provide the community with access <strong>to</strong><br />
performance results and ensure we have an open and accountable system.<br />
Through the Vic<strong>to</strong>rian <strong>Transport</strong> Plan, the Government is taking action <strong>to</strong> build a better transport network.<br />
MTM and KDR, along with our other public transport opera<strong>to</strong>rs, will be significant contribu<strong>to</strong>rs <strong>to</strong> that plan.<br />
MARTIN PAKULA MP<br />
Minister for <strong>Public</strong> <strong>Transport</strong><br />
2