Track Record 41, October to December 2009 - Public Transport ...
Track Record 41, October to December 2009 - Public Transport ...
Track Record 41, October to December 2009 - Public Transport ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
ISSUE<br />
<strong>41</strong><br />
Services <strong>Oc<strong>to</strong>ber</strong> <strong>to</strong> <strong>December</strong> <strong>2009</strong><br />
<strong>Track</strong> <strong>Record</strong><br />
Vic<strong>to</strong>rian <strong>Transport</strong> Services<br />
Quarterly Performance Bulletin<br />
Department of <strong>Transport</strong>
Contents<br />
Minister’s Foreword 2<br />
SECTION 1<br />
Introduction and Summary 3<br />
SECTION 2<br />
Punctuality and Reliability 5<br />
SECTION 3<br />
Payments 9<br />
SECTION 4<br />
Cus<strong>to</strong>mer Satisfaction 12<br />
SECTION 5<br />
Performance of<br />
Au<strong>to</strong>matic Ticketing System<br />
(ATS) Equipment 18<br />
SECTION 6<br />
Glossary of Terminology 20
MINISTER’S FOREWORD<br />
An important miles<strong>to</strong>ne in the delivery of the $38 billion Vic<strong>to</strong>rian <strong>Transport</strong> Plan has<br />
been achieved with the commencement of new contracts between the Vic<strong>to</strong>rian<br />
Government and Melbourne’s new train and tram opera<strong>to</strong>rs.<br />
Metro Trains Melbourne (MTM) and Keolis Downer EDI (KDR) assumed operational<br />
control of the metropolitan train and tram networks on 30 November <strong>2009</strong>,<br />
heralding a new partnership with the Vic<strong>to</strong>rian Government <strong>to</strong> provide passengers<br />
with safe, clean and reliable public transport.<br />
Both opera<strong>to</strong>rs were chosen because of their commitments <strong>to</strong> continuously<br />
improve the train and tram services. These commitments are backed by updated<br />
franchise arrangements designed <strong>to</strong> meet cus<strong>to</strong>mer expectations.<br />
Performance measures for punctuality and reliability have been <strong>to</strong>ughened: a train or tram must now arrive<br />
within five minutes of its scheduled time <strong>to</strong> be regarded as on-time. Punctuality was previously defined as<br />
arriving within six minutes of the scheduled time.<br />
In addition, the reliability measure has now been expanded. This measure continues <strong>to</strong> include cancelled<br />
services, but now also includes services that complete some but not all of the scheduled journey.<br />
Under updated Operational Performance Regime arrangements, good performance will be rewarded<br />
with bonuses while failure <strong>to</strong> meet target benchmarks will result in fines of up <strong>to</strong> $1 million a month. A new<br />
Cus<strong>to</strong>mer Experience Performance Regime will also apply <strong>to</strong> ensure safety, cleanliness and information are<br />
core parts of service delivery.<br />
The <strong>Track</strong> <strong>Record</strong> quarterly and monthly bulletins will continue <strong>to</strong> provide the community with access <strong>to</strong><br />
performance results and ensure we have an open and accountable system.<br />
Through the Vic<strong>to</strong>rian <strong>Transport</strong> Plan, the Government is taking action <strong>to</strong> build a better transport network.<br />
MTM and KDR, along with our other public transport opera<strong>to</strong>rs, will be significant contribu<strong>to</strong>rs <strong>to</strong> that plan.<br />
MARTIN PAKULA MP<br />
Minister for <strong>Public</strong> <strong>Transport</strong><br />
2
Section 1<br />
Introduction and Summary<br />
1.1 Introduction<br />
This edition of <strong>Track</strong> <strong>Record</strong> provides details on the performance of public transport services in Vic<strong>to</strong>ria<br />
for the period from <strong>Oc<strong>to</strong>ber</strong> <strong>to</strong> <strong>December</strong> <strong>2009</strong> (referred <strong>to</strong> as the <strong>December</strong> quarter <strong>2009</strong>).<br />
During that period, new franchise contracts for the operation of Melbourne’s passenger train and tram<br />
networks commenced. From 30 November <strong>2009</strong>, Metro Trains Melbourne (operating as Metro) and<br />
Keolis Downer EDI (operating as Yarra Trams (KDR)) commenced eight-year contracts with the<br />
Vic<strong>to</strong>rian Government.<br />
The new contracts and cus<strong>to</strong>mer charters include revised definitions for punctuality and reliability measures<br />
and new service level thresholds for passenger compensation:<br />
• Metropolitan trains and tram services are now regarded as punctual if they arrive no earlier than 59 seconds<br />
before and no later than four minutes and 59 seconds after the timetabled arrival time.<br />
• Reliability for metropolitan trains and trams is now based on the percentage of the timetable delivered.<br />
Performances measures for regional trains and coaches and for metropolitan buses are unchanged.<br />
Further explanations and threshold details are outlined in the Glossary at the back of this bulletin.<br />
To enable comparisons of performance of current and past performance, punctuality and reliability figures<br />
based on both the new and former measures are provided in Section 2 of this bulletin.<br />
The means by which the new franchisees are funded has also changed including the method by which<br />
incentive and penalty payments are determined. These changes are explained in the Payments section<br />
of this bulletin.<br />
Please note:<br />
Metropolitan trains =<br />
Connex (<strong>Oc<strong>to</strong>ber</strong> 1 –<br />
November 29) and Metro<br />
(November 30 – <strong>December</strong> 31)<br />
Metropolitan trams =<br />
Yarra Trams operated by Metrolink<br />
(<strong>Oc<strong>to</strong>ber</strong> 1 – November 29)<br />
and KDR (November 30 – <strong>December</strong> 31<br />
Regional trains<br />
= V/Line Passenger<br />
3<br />
<strong>Track</strong> <strong>Record</strong> ISSuE <strong>41</strong>
1.2 Summary<br />
Punctuality<br />
Metropolitan trains<br />
Metropolitan trams<br />
V/Line Passenger<br />
Punctual <strong>to</strong> 4 minutes, 59 seconds: 86.0%<br />
Punctual <strong>to</strong> 5 minutes, 59 seconds: 90.7%<br />
Punctual <strong>to</strong> 4 minutes, 59 seconds: 82.2%<br />
Punctual <strong>to</strong> 5 minutes, 59 seconds: 85.3%<br />
84.8 per cent<br />
Reliability<br />
Metropolitan trains<br />
Percentage of timetable not delivered: 1.2%<br />
Percentage of network cancellations: 1.0%<br />
Metropolitan trams<br />
Percentage of timetable not delivered: 0.7%<br />
Percentage of network cancellations: 0.2%<br />
V/Line Passenger Percentage of services cancelled: 1.7%<br />
Payments<br />
Yarra Trams (KDR) received an incentive payment for reducing service disruption levels below the agreed<br />
contractual performance standards. The other opera<strong>to</strong>rs did not meet these performance standards and<br />
incurred penalty payments for the <strong>December</strong> quarter <strong>2009</strong>.<br />
Metropolitan trains - Metro<br />
Metropolitan trams - KDR<br />
Metropolitan trains - Connex<br />
Metropolitan trams - Metrolink<br />
V/Line Passenger<br />
Cus<strong>to</strong>mer satisfaction<br />
Metropolitan modes (trains, trams and buses)<br />
Metropolitan taxis<br />
V/Line Passenger trains<br />
V/Line Passenger coaches<br />
Availability of ticketing equipment<br />
Railway vending machines<br />
Railway valida<strong>to</strong>rs<br />
Tram vending machines<br />
Tram valida<strong>to</strong>rs<br />
Bus ticket issuing machines<br />
Bus valida<strong>to</strong>rs<br />
-$<strong>41</strong>3 thousand<br />
$450 thousand<br />
-$4.237 million<br />
-$231 thousand<br />
-$387 thousand<br />
59.7 index points<br />
57.5 index points<br />
73.4 index points<br />
71.7 index points<br />
98.70 per cent<br />
99.51 per cent<br />
97.7 per cent<br />
98.1 per cent<br />
99.4 per cent<br />
99.5 per cent<br />
4
Section 2<br />
Punctuality and Reliability<br />
For an explanation of how punctuality and reliability is determined, please refer <strong>to</strong> the Glossary on page 20.<br />
2.1 Punctuality<br />
Please note: punctuality outcomes for metropolitan trains and trams discussed in the text below are based<br />
on revised measures introduced in the new franchise contracts, ie, punctual <strong>to</strong> 4 minutes and 59 seconds.<br />
Details of the results under both the previous and current measures appear in Table 1.<br />
Metropolitan trains Metropolitan Trams V/Line Passenger trains Metropolitan buses<br />
Metropolitan train<br />
punctuality in the<br />
<strong>December</strong> quarter<br />
<strong>2009</strong> was 86.0 per cent.<br />
This is lower than in<br />
the September quarter<br />
(88.6 per cent) and<br />
the <strong>December</strong> quarter<br />
2008 (90.9 per cent).<br />
Tram punctuality<br />
(average over route) in<br />
the <strong>December</strong> quarter<br />
<strong>2009</strong> (82.2 per cent)<br />
was comparable<br />
with the previous<br />
quarter (82.3 per cent)<br />
and higher than the<br />
<strong>December</strong> quarter<br />
2008 (78.5 per cent).<br />
Regional train<br />
punctuality was 84.8 per<br />
cent in the <strong>December</strong><br />
quarter <strong>2009</strong>, lower than<br />
in the previous quarter<br />
(89.3 per cent) and<br />
the <strong>December</strong> quarter<br />
2008 (88.2 per cent).<br />
Metropolitan buses.<br />
Metropolitan bus<br />
punctuality was 93.9 per<br />
cent in the <strong>December</strong><br />
quarter <strong>2009</strong>. This<br />
is comparable with<br />
the previous quarter<br />
result (94.2 per cent).<br />
Table 1 On-time performance for trains, trams and buses as a percentage of<br />
services run, <strong>December</strong> quarter 2008 <strong>to</strong> <strong>December</strong> quarter <strong>2009</strong><br />
Oct-Dec<br />
2008<br />
Jan–Mar<br />
<strong>2009</strong><br />
Apr–Jun<br />
<strong>2009</strong><br />
Jul–Sept<br />
<strong>2009</strong><br />
Oct-Dec<br />
<strong>2009</strong><br />
Metropolitan trains<br />
4 minutes, 59 seconds<br />
5 minutes, 59 seconds<br />
90.9<br />
94.2<br />
85.1<br />
88.7<br />
86.3<br />
90.2<br />
88.6<br />
92.4<br />
86.0<br />
90.7<br />
Metropolitan trams –<br />
average over route<br />
4 minutes, 59 seconds<br />
5 minutes, 59 seconds<br />
78.5<br />
81.9<br />
77.9<br />
81.4<br />
80.0<br />
83.5<br />
82.3<br />
85.3<br />
82.2<br />
85.3<br />
Metropolitan trams<br />
– at destination<br />
V/Line Passenger<br />
trains<br />
4 minutes, 59 seconds<br />
5 minutes, 59 seconds<br />
66.8<br />
71.8<br />
66.2<br />
71.2<br />
68.9<br />
74.0<br />
71.9<br />
76.6<br />
71.8<br />
76.7<br />
88.2 82.0 86.5 89.3 84.8<br />
Metropolitan buses 93.7 94.5 94.5 94.2 93.9<br />
5<br />
<strong>Track</strong> <strong>Record</strong> ISSuE <strong>41</strong>
Figure 1 On-time performance for trains, trams and buses, <strong>December</strong> quarter 2008<br />
<strong>to</strong> <strong>December</strong> quarter <strong>2009</strong>*<br />
Percentage of services running on time<br />
100<br />
80<br />
60<br />
Oct–Dec 2008 Jan–Mar <strong>2009</strong> Apr–Jun <strong>2009</strong><br />
Metropolitan buses<br />
Metropolitan trams – average over route<br />
Metropolitan trams – at destination<br />
V/Line Passenger trains<br />
Metropolitan trains<br />
Jul–Sep <strong>2009</strong> Oct–Dec <strong>2009</strong><br />
*On-time figures for metropolitan trains and trams in the table above are based on the new punctuality measure.<br />
2.2 Reliability (cancellations)<br />
Please note: reliability outcomes for metropolitan trains and trams discussed in the text below are based on<br />
the revised measures introduced under the new franchise contracts, ie, percentage of timetable not delivered.<br />
See the Glossary for more information on the new reliability measures. Details of the results for both the<br />
previous and current measurements appear in Table 2.<br />
Metropolitan trains Metropolitan Trams V/Line Passenger trains Metropolitan buses<br />
A <strong>to</strong>tal of 1.2 per cent<br />
of the timetable was<br />
not delivered in the<br />
<strong>December</strong> quarter <strong>2009</strong>.<br />
This is an increase on<br />
the September quarter<br />
result (0.8 per cent) but<br />
is comparable <strong>to</strong> the<br />
<strong>December</strong> quarter 2008<br />
(1.1 per cent)..<br />
A <strong>to</strong>tal of 0.7 per cent<br />
of the timetable was<br />
not delivered in the<br />
<strong>December</strong> quarter <strong>2009</strong>.<br />
This is comparable <strong>to</strong><br />
the previous quarter (0.6<br />
per cent) and lower than<br />
the <strong>December</strong> quarter<br />
2008 (0.9 per cent).<br />
Cancellations in the<br />
<strong>December</strong> quarter<br />
<strong>2009</strong> (1.7 per cent)<br />
were higher than the<br />
September quarter<br />
(1.1 per cent) and the<br />
<strong>December</strong> quarter 2008<br />
results (1.0 per cent)<br />
A <strong>to</strong>tal of 0.1 per cent of<br />
services was cancelled<br />
in the <strong>December</strong> quarter<br />
<strong>2009</strong>. This is consistent<br />
with previous quarters<br />
over the preceding 12<br />
months..<br />
6
Table 2 Cancellations of trains, trams and buses <strong>December</strong> quarter 2008<br />
<strong>to</strong> <strong>December</strong> quarter <strong>2009</strong><br />
Oct-Dec<br />
2008<br />
Jan–Mar<br />
<strong>2009</strong><br />
Apr–Jun<br />
<strong>2009</strong><br />
Jul–Sept<br />
<strong>2009</strong><br />
Oct-Dec<br />
<strong>2009</strong><br />
Metropolitan trains<br />
% of timetable not delivered<br />
% of network cancellations<br />
1.1<br />
1.0<br />
3.0<br />
2.8<br />
0.8<br />
0.6<br />
0.8<br />
0.6<br />
1.2<br />
1.0<br />
Metropolitan trams –<br />
% of timetable not delivered<br />
% of network cancellations<br />
0.9<br />
0.2<br />
1.1<br />
0.4<br />
0.8<br />
0.2<br />
0.6<br />
0.1<br />
0.7<br />
0.2<br />
V/Line Passenger<br />
trains<br />
% of network cancellations 1.0 3.5 1.4 1.1 1.7<br />
Metropolitan buses % of network cancellations 0.1 0.1 0.1 0.1 0.1<br />
Figure 2 Cancellation of trains, trams and buses, <strong>December</strong> quarter 2008<br />
<strong>to</strong> <strong>December</strong> quarter <strong>2009</strong>*<br />
Percentage of services cancelled<br />
3.5<br />
3.0<br />
2.5<br />
2.0<br />
1.5<br />
1.0<br />
0.5<br />
0.0<br />
Oct–Dec 2008 Jan–Mar <strong>2009</strong> Apr–Jun <strong>2009</strong><br />
Metropolitan buses<br />
Metropolitan trams<br />
Regional trains<br />
Metropolitan trains<br />
Jul–Sep <strong>2009</strong> Oct–Dec <strong>2009</strong><br />
*Figure 2 reflects the new reliability measure of percentage of timetable not delivered for metropolitan trains and trams.<br />
7<br />
<strong>Track</strong> <strong>Record</strong> ISSuE <strong>41</strong>
For details of thresholds for passenger compensation, please refer <strong>to</strong> the Glossary on page 20.<br />
2.3 Passenger compensation<br />
Metroplitan trains Metropolitan trams V/Line Passenger trains<br />
• Passenger compensation<br />
was payable in <strong>Oc<strong>to</strong>ber</strong>,<br />
November and <strong>December</strong> as<br />
network punctuality was below<br />
the applicable threshold.<br />
•No passenger compensation<br />
was payable in the<br />
<strong>December</strong> <strong>2009</strong> quarter.<br />
• Passenger compensation<br />
was payable in <strong>Oc<strong>to</strong>ber</strong><br />
<strong>2009</strong> as punctuality was<br />
below the applicable<br />
threshold on all corridors<br />
except Ararat, Sheppar<strong>to</strong>n<br />
and Swan Hill/Echuca.<br />
• Passenger compensation was<br />
payable in November <strong>2009</strong><br />
as punctuality was below<br />
the applicable threshold<br />
on all corridors except<br />
Ararat while reliability was<br />
also below the threshold<br />
on the Bendigo corridor.<br />
• Passenger compensation<br />
was payable in <strong>December</strong><br />
<strong>2009</strong> as punctuality was<br />
below the applicable<br />
threshold on all corridors<br />
except Ararat and Ballarat.<br />
8
Section 3<br />
Payments<br />
See the Glossary on page 20 for an explanation relating <strong>to</strong> the payment details in this section.<br />
3.1 Metropolitan trains and trams<br />
The payment information provided in Tables 3 and 4 relates <strong>to</strong> the current metropolitan franchise contracts<br />
that commenced on 30 November <strong>2009</strong>. The payment schedule in these contracts includes several<br />
adjustments in the types of payments provided.<br />
The new franchise contracts have introduced several new payments and/or payment arrangements,<br />
including:<br />
• The establishment of a monthly cap (of $1 million for train and $500,000 for tram) for penalty and<br />
incentive payments.<br />
• The replacement of farebox and farebox-related payments with a new ticketing revenue guarantee payment<br />
for the transition period (ie. until 18 months after the Metcard ticketing system is turned off).*<br />
• The introduction of a new Business Systems Upgrade payment <strong>to</strong> encourage incremental upgrades <strong>to</strong><br />
information, telecommunications and technology systems.<br />
• The introduction of the Cus<strong>to</strong>mer Service Standards and Cus<strong>to</strong>mer Experience Performance Regime<br />
(aimed at improving cus<strong>to</strong>mer satisfaction with public transport services) with capped payments/penalties<br />
(of $1 million per annum for train and $500,000 per annum for tram).<br />
* More information on the new ticketing revenue guarantee payment is available from the Glossary. The <strong>to</strong>tal metropolitan farebox<br />
for the period from 27 November <strong>to</strong> 31 <strong>December</strong> <strong>2009</strong> was $44,328,398. This farebox was not distributed <strong>to</strong> the opera<strong>to</strong>rs.<br />
All opera<strong>to</strong>rs, except KDR, incurred Operational Performance Regime penalty payments as service disruption<br />
levels exceeded the agreed target levels in the <strong>December</strong> quarter <strong>2009</strong>:<br />
• Metro -$<strong>41</strong>3 thousand<br />
• Yarra Trams (operated by KDR) $450 thousand<br />
• Connex -$4.237 million<br />
• Yarra Trams (operated by Metrolink) -$213 thousand<br />
Table 3 Metro payments ($ ,000)<br />
Table 4 Yarra Trams (KDR) payments ($ ,000)<br />
Payment type 30 Nov – 31 Dec <strong>2009</strong><br />
Base contract 23,900<br />
Ticketing revenue<br />
guarantee<br />
21,866<br />
Maintenance 0<br />
Business Systems<br />
Upgrade<br />
0<br />
Payment type 30 Nov – 31 Dec <strong>2009</strong><br />
Base contract 4,246<br />
Ticketing revenue<br />
guarantee<br />
14,648<br />
Maintenance 0<br />
Business Systems<br />
Upgrade<br />
0<br />
Rolling s<strong>to</strong>ck<br />
adjustment<br />
7,233<br />
Rolling s<strong>to</strong>ck<br />
adjustment<br />
2,922<br />
Incentive and penalty -<strong>41</strong>3<br />
Capital projects 0<br />
Other 0<br />
TOTAL 52,586<br />
Incentive and penalty 450<br />
Capital projects 0<br />
Other 1,788<br />
TOTAL 24,054<br />
9<br />
<strong>Track</strong> <strong>Record</strong> ISSuE <strong>41</strong>
The payment information provided in Tables 5 and 6 relates <strong>to</strong> the previous metropolitan rail franchise<br />
partnerships which operated from 18 April 2004 <strong>to</strong> 29 November <strong>2009</strong>. The farebox figures in these tables<br />
represent an agreed payment of 40 per cent of the metropolitan farebox <strong>to</strong> each of the rail franchisees.<br />
The remaining 20 per cent was remitted <strong>to</strong> the State.<br />
Table 5 Connex payments ($ ,000)<br />
Payment type Oct-Dec 2008 Jan-Mar <strong>2009</strong> Apr-Jun <strong>2009</strong> Jul-Sep <strong>2009</strong> 1 Oct-29 Nov <strong>2009</strong><br />
Base contract 44,5<strong>41</strong> 39,355 40,959 60,907 32,398<br />
Farebox 54,851 58,350 59,279 60,949 37,531<br />
Concession <strong>to</strong>p-up 6,979 6,109 8,263 6,810 6,923<br />
Maintenance 30,484 27,687 22,258 33,038 26,999<br />
Rolling s<strong>to</strong>ck<br />
adjustment<br />
23,149 23,046 22,748 22,366 14,588<br />
Incentive and penalty -5,558 -7,339 -4,501 -3,778 -4,237<br />
Capital projects 12,264 6,990 1,569 4,346 7,555<br />
Other 2,320 -6,779 3,314 3,488 -4,397<br />
TOTAL 169,030 147,<strong>41</strong>9 153,889 188,126 117,360<br />
Table 6 Yarra Trams (Metrolink) payments ($’000)<br />
Payment type Oct-Dec 2008 Jan-Mar <strong>2009</strong> Apr-Jun <strong>2009</strong> Jul-Sep <strong>2009</strong> 1 Oct-29 Nov <strong>2009</strong><br />
Base contract 980 -353 -279 -956 -857<br />
Farebox 54,851 58,350 59,279 60,949 37,531<br />
Concession <strong>to</strong>p-up 7,210 6,384 8,612 7,039 7,162<br />
Maintenance 6,011 8,589 14,386 7,947 4,542<br />
Rolling s<strong>to</strong>ck<br />
adjustment<br />
8,679 8,708 8,767 8,767 5,845<br />
Incentive and penalty -1,706 -1,758 -1,611 -130 -231<br />
Capital projects 990 288 7,259 845 3,064<br />
Other -13,424 3,402 7,947 3,970 5,386<br />
TOTAL 63,591 83,610 104,360 88,431 62,442<br />
10
3.2 V/Line Passenger trains<br />
Payments by the State <strong>to</strong> the regional rail opera<strong>to</strong>r (V/Line Passenger)—including payments for coach<br />
services directly contracted by V/Line—are summarised in Table 7. Farebox revenue is retained by V/Line and<br />
is included <strong>to</strong> provide an overall indication of the cost of the services. State contract payments represent the<br />
net payments required for V/Line Passenger <strong>to</strong> run the services.<br />
V/Line Passenger incurred an Operational Performance Regime penalty of -$387,000 as service disruption<br />
levels exceeded the agreed target levels in the <strong>December</strong> quarter <strong>2009</strong>.<br />
Table 7 Payment for V/Line Passenger train services ($ ,000)<br />
Payment type Oct-Dec 2008 Jan-Mar <strong>2009</strong> Apr-Jun <strong>2009</strong> Jul-Sep <strong>2009</strong> Oct-Dec <strong>2009</strong><br />
Base contract 58,866 57,683 64,509 62,284 64,444<br />
Farebox 16,175 17,193 17,739 18,191 16,729<br />
Rolling s<strong>to</strong>ck 8,953 8,953 8,953 8,953 8,953<br />
Incentive and penalty -101 -579 -176 142 -387<br />
Capital projects 1,395 843 1,036 2,607 368<br />
Other 37 0 0 0 0<br />
TOTAL 85,325 84,093 92,061 92,177 90,107<br />
3.3 Metropolitan and regional buses<br />
Payments <strong>to</strong> metropolitan, regional and school bus opera<strong>to</strong>rs are presented in Table 8. Farebox revenue<br />
collected is not included in the table as other provisions are in place. For metropolitan services, farebox<br />
revenue is returned <strong>to</strong> the State while regional bus farebox revenue is retained by the opera<strong>to</strong>r. School<br />
services, in most instances, do not collect revenue.<br />
Table 8 Payment for metropolitan and regional bus services ($ ,000)<br />
Payment type Oct-Dec 2008 Jan-Mar <strong>2009</strong> Apr-Jun <strong>2009</strong> Jul-Sep <strong>2009</strong> Oct-Dec <strong>2009</strong><br />
Metropolitan bus 105,644 105,923 111,194 111,787 110,484<br />
Regional bus 23,865 24,176 24,707 24,646 26,866<br />
School bus 45,977 30,435 45,692 46,600 46,723<br />
TOTAL 175,486 160,534 181,593 183,033 184,073<br />
3.4 Metlink<br />
Under current metropolitan rail franchises, Metlink is a provider of system-wide services. Payments <strong>to</strong> Metlink<br />
for services supplied under contracts with the State are presented in Table 9.<br />
Table 9 Payment for Metlink and services ($ ,000)<br />
Payment type Oct-Dec 2008 Jan-Mar <strong>2009</strong> Apr-Jun <strong>2009</strong> Jul-Sep <strong>2009</strong> Oct-Dec <strong>2009</strong><br />
Metlink/TTA 3,948 3,948 3,926 4,160 4,355<br />
Other 0 272 0 0 0<br />
TOTAL 3,948 4,220 3,926 4,160 4,355<br />
11<br />
<strong>Track</strong> <strong>Record</strong> ISSuE <strong>41</strong>
Section 4<br />
Cus<strong>to</strong>mer Satisfaction<br />
For an explanation of how cus<strong>to</strong>mer satisfaction is determined, please refer <strong>to</strong> the Glossary on page 20.<br />
Please Note: satisfaction rates are presented as index points, not percentages.<br />
5.1 Overall satisfaction with metropolitan services<br />
Metropolitan public transport (trains, trams and buses) recorded an overall satisfaction result of<br />
59.7 index points in the <strong>December</strong> quarter <strong>2009</strong> which is consistent with the September quarter result<br />
of 59.8 index points.<br />
Figure 3 Overall satisfaction with metropolitan public transport services (trains, trams and buses),<br />
<strong>December</strong> quarter 2007 <strong>to</strong> <strong>December</strong> quarter <strong>2009</strong><br />
Cus<strong>to</strong>mer Satisfaction Index<br />
75<br />
VERY<br />
SATISFIED<br />
70<br />
65<br />
SOMEWHAT<br />
SATISFIED<br />
60<br />
55<br />
50<br />
Oct–Dec<br />
2007<br />
Jan–Mar<br />
2008<br />
Apr–Jun<br />
2008<br />
Jul–Sep<br />
2008<br />
Oct–Dec<br />
2008<br />
Jan–Mar<br />
<strong>2009</strong><br />
Apr–Jun<br />
<strong>2009</strong><br />
Jul–Sep<br />
<strong>2009</strong><br />
Oct–Dec<br />
<strong>2009</strong><br />
Cus<strong>to</strong>mer satisfaction results for metropolitan trains, trams and buses in the <strong>December</strong> quarter <strong>2009</strong> were<br />
comparable with the September quarter results. Cus<strong>to</strong>mer satisfaction for taxis recorded a slight increase<br />
Metropolitan trains<br />
Metropolitan trams<br />
Metropolitan buses<br />
Metropolitan taxis<br />
60.6 index points<br />
70.0 index points<br />
70.7 index points<br />
57.5 index points<br />
12
Figure 4 Overall satisfaction with metropolitan train, tram, bus and taxi services,<br />
<strong>December</strong> quarter 2007 <strong>to</strong> <strong>December</strong> quarter <strong>2009</strong><br />
Cus<strong>to</strong>mer Satisfaction Index<br />
VERY<br />
SATISFIED<br />
85<br />
80<br />
75<br />
70<br />
SOMEWHAT<br />
SATISFIED<br />
65<br />
60<br />
55<br />
50<br />
Oct–Dec<br />
2007<br />
Jan–Mar<br />
2008<br />
Apr–Jun<br />
2008<br />
Jul–Sep<br />
2008<br />
Oct–Dec<br />
2008<br />
Jan–Mar<br />
<strong>2009</strong><br />
Apr–Jun<br />
<strong>2009</strong><br />
Jul–Sep<br />
<strong>2009</strong><br />
Oct–Dec<br />
<strong>2009</strong><br />
Metropolitan trains<br />
Metropolitan trams<br />
Metropolitan buses<br />
Metropolitan taxis<br />
4.2 Overall satisfaction with V/Line Passenger services<br />
Overall cus<strong>to</strong>mer satisfaction indices for the regional modes recorded slight decreases during the <strong>December</strong><br />
quarter <strong>2009</strong>.<br />
• V/Line Passenger trains 73.4 index points<br />
• V/Line Passenger coaches 71.7 index points<br />
Figure 5 Overall satisfaction with V/Line Passenger trains and coaches, <strong>December</strong> quarter 2007<br />
<strong>to</strong> <strong>December</strong> quarter <strong>2009</strong><br />
Cus<strong>to</strong>mer Satisfaction Index<br />
VERY<br />
SATISFIED<br />
85<br />
80<br />
75<br />
70<br />
SOMEWHAT<br />
SATISFIED<br />
65<br />
60<br />
55<br />
50<br />
Oct–Dec<br />
2007<br />
Jan–Mar<br />
2008<br />
Apr–Jun<br />
2008<br />
Jul–Sep<br />
2008<br />
Oct–Dec<br />
2008<br />
Jan–Mar<br />
<strong>2009</strong><br />
Apr–Jun<br />
<strong>2009</strong><br />
Jul–Sep<br />
<strong>2009</strong><br />
Oct–Dec<br />
<strong>2009</strong><br />
V/Line Passenger trains<br />
V/Line Passenger coaches<br />
13<br />
<strong>Track</strong> <strong>Record</strong> ISSuE <strong>41</strong>
4.3 Key aspects of service quality for trains, trams, taxis, buses and coaches<br />
The following graphs summarise cus<strong>to</strong>mer satisfaction with specific aspects of service. Each graph presents<br />
an overall cus<strong>to</strong>mer satisfaction index as well as separate measurements for major aspects of service, such<br />
as ‘Passenger travel experience’. Note: the overall cus<strong>to</strong>mer satisfaction index is produced from a specific<br />
question in the survey and is not an average of other results.<br />
All graphs are for the <strong>December</strong> quarter <strong>2009</strong>. A statistically significant increase or decrease in the cus<strong>to</strong>mer<br />
satisfaction index from the September <strong>2009</strong> quarter is respectively indicated by a green ‘up’ or red ‘down’<br />
arrow. Where there is no arrow, no statistically significant change has occurred. Minor shifts in the index can<br />
be due <strong>to</strong> the nature of the survey, rather than reflecting a genuine change in cus<strong>to</strong>mer satisfaction.<br />
Metropolitan trains<br />
• Metropolitan train services recorded an overall satisfaction rate of 60.6, comparable with the September<br />
quarter result (60.4).<br />
• While there were no significant changes in the satisfaction with individual service aspects, all recorded<br />
slight increases in satisfaction compared with the September quarter results.<br />
Figure 6 Cus<strong>to</strong>mer satisfaction with metropolitan trains, <strong>December</strong> quarter <strong>2009</strong><br />
Service aspects<br />
ranked highest <strong>to</strong> lowest<br />
Overall satisfaction<br />
Train staff<br />
Metcard ticketing<br />
Information<br />
Running of services<br />
Train stations<br />
Passenger travel experience<br />
Price<br />
Personal security<br />
No significant<br />
change from<br />
September<br />
quarter <strong>2009</strong><br />
<strong>to</strong> <strong>December</strong><br />
quarter <strong>2009</strong>.<br />
0 10 20 30 40 50 60 70 80 90 100<br />
Cus<strong>to</strong>mer Satisfaction Index<br />
14
Metropolitan Trams<br />
• Metropolitan trams recorded an overall satisfaction score of 70.0 points, comparable <strong>to</strong> the September<br />
quarter result (69.8 points)<br />
• The service aspects of Running of services; Metcard ticketing; Personal security; and Price all recorded<br />
significant increases in satisfaction.<br />
Figure 7 Cus<strong>to</strong>mer satisfaction with metropolitan trams, <strong>December</strong> quarter <strong>2009</strong><br />
Service aspects<br />
ranked highest <strong>to</strong> lowest<br />
Overall satisfaction<br />
Running of services<br />
Tram staff<br />
Tram s<strong>to</strong>ps<br />
Metcard ticketing<br />
Personal security<br />
Information<br />
Passenger travel experience<br />
Price<br />
Statistically<br />
significant<br />
increase<br />
from September<br />
quarter <strong>2009</strong><br />
<strong>to</strong> <strong>December</strong><br />
quarter <strong>2009</strong><br />
0 10 20 30 40 50 60 70 80 90 100<br />
Cus<strong>to</strong>mer Satisfaction Index<br />
Metropolitan buses<br />
• Metropolitan buses recorded an overall cus<strong>to</strong>mer satisfaction score of 70.7 points, comparable with the<br />
September quarter result of 70.5 points.<br />
• There was no significant change in any key service aspects between the September and <strong>December</strong> quarters.<br />
Figure 8 Cus<strong>to</strong>mer satisfaction with metropolitan buses, <strong>December</strong> quarter <strong>2009</strong><br />
Service aspects<br />
ranked highest <strong>to</strong> lowest<br />
Overall satisfaction<br />
Bus staff<br />
Passenger travel experience<br />
Metcard ticketing<br />
Personal security<br />
Bus s<strong>to</strong>ps<br />
Information<br />
Running of services<br />
Price<br />
No significant<br />
change from<br />
September<br />
quarter <strong>2009</strong><br />
<strong>to</strong> <strong>December</strong><br />
quarter <strong>2009</strong>.<br />
0 10 20 30 40 50 60 70 80 90 100<br />
Cus<strong>to</strong>mer Satisfaction Index<br />
15<br />
<strong>Track</strong> <strong>Record</strong> ISSuE <strong>41</strong>
V/Line Passenger trains<br />
• Regional train services recorded an overall cus<strong>to</strong>mer satisfaction of 73.4 points, a slight decrease compared<br />
with the September quarter result (75.0 points)<br />
• The service area of Personal security recorded a significant decrease compared with the September quarter.<br />
Figure 9 Cus<strong>to</strong>mer satisfaction with V/Line Passenger trains, <strong>December</strong> quarter <strong>2009</strong><br />
Service aspects<br />
ranked highest <strong>to</strong> lowest<br />
Overall satisfaction<br />
V/Line staff<br />
Price<br />
V/Line Ticketing<br />
Passenger Travel experience<br />
Running of services<br />
Information<br />
V/Line Train stations<br />
Personal security<br />
Statistically<br />
significant<br />
decrease<br />
from September<br />
quarter <strong>2009</strong><br />
<strong>to</strong> <strong>December</strong><br />
quarter <strong>2009</strong><br />
0 10 20 30 40 50 60 70 80 90 100<br />
Cus<strong>to</strong>mer Satisfaction Index<br />
V/Line Passenger coaches<br />
• V//Line passenger coaches recorded an overall satisfaction score of 71.7 points, a slight decrease from the<br />
September quarter result (73.0 points)<br />
• There was no significant change in any key service aspects between the September and <strong>December</strong> quarters.<br />
Figure 10 Cus<strong>to</strong>mer satisfaction with V/Line Passenger coaches, <strong>December</strong> quarter <strong>2009</strong><br />
Service aspects<br />
ranked highest <strong>to</strong> lowest<br />
Overall satisfaction<br />
V/Line staff<br />
Price<br />
Personal security<br />
Information<br />
V/Line ticketing<br />
Passenger travel experience<br />
Running of services<br />
V/Line coach s<strong>to</strong>ps<br />
No significant<br />
change from<br />
September<br />
quarter <strong>2009</strong><br />
<strong>to</strong> <strong>December</strong><br />
quarter <strong>2009</strong>.<br />
0 10 20 30 40 50 60 70 80 90 100<br />
Cus<strong>to</strong>mer Satisfaction Index<br />
16
Metropolitan taxis<br />
• Metropolitan taxis recorded an overall cus<strong>to</strong>mer satisfaction result of 57.5 points, a slight increase on the<br />
September quarter result of 55.2.<br />
• There was no significant change in any key service aspects between the September and <strong>December</strong> quarters.<br />
Figure 11 Cus<strong>to</strong>mer satisfaction with metropolitan taxis, <strong>December</strong> quarter <strong>2009</strong><br />
Service aspects<br />
ranked highest <strong>to</strong> lowest<br />
Overall satisfaction<br />
Personal security<br />
Booking service<br />
Taxi ranks<br />
Fares and payment system<br />
Passenger travel experience<br />
Finding a taxi<br />
Price<br />
Taxi drivers<br />
Information<br />
No significant<br />
change from<br />
September<br />
quarter <strong>2009</strong><br />
<strong>to</strong> <strong>December</strong><br />
quarter <strong>2009</strong>.<br />
0 10 20 30 40 50 60 70 80 90 100<br />
Cus<strong>to</strong>mer Satisfaction Index<br />
17<br />
<strong>Track</strong> <strong>Record</strong> ISSuE <strong>41</strong>
Section 5<br />
Performance of Au<strong>to</strong>matic Ticketing<br />
System (ATS) Equipment<br />
See the Glossary on page 20 for details on Cus<strong>to</strong>mer-Defined Availability (CDA) reporting and a background<br />
on the ticketing contracts.<br />
Note: all figures in this section relate <strong>to</strong> the performance of the Metcard ticketing system and equipment.<br />
5.1 Railway station ticketing equipment<br />
Availability of railway station ticketing equipment exceeded the relevant targets in the <strong>December</strong> quarter <strong>2009</strong>.<br />
Table 10 ATS CDA for ticketing equipment at railway stations (%)<br />
Device Target Oct-Dec 2008 Jan-Mar <strong>2009</strong> Apr-Jun <strong>2009</strong> Jul-Sep <strong>2009</strong> Oct-Dec <strong>2009</strong><br />
Vending machines 98.26 98.71 98.46 98.71 98.77 98.70<br />
Valida<strong>to</strong>rs 99.47 99.57 99.51 99.50 99.56 99.51<br />
5.2 Tram and bus ticketing equipment<br />
Availability remains high for ticketing machines and valida<strong>to</strong>rs on trams and buses.<br />
Table 11 ATS availability for mobile equipment (%)<br />
Mode Device Oct-Dec 2008 Jan-Mar <strong>2009</strong> Apr-Jun <strong>2009</strong> Jul-Sep <strong>2009</strong> Oct-Dec <strong>2009</strong><br />
Tram<br />
Vending<br />
machines<br />
97.8 96.7 97.6 98.2 97.7<br />
Valida<strong>to</strong>rs 98.1 97.5 98.1 98.4 98.1<br />
Bus Issuing machines 99.6 99.3 99.5 99.6 99.4<br />
Valida<strong>to</strong>rs 99.5 99.3 99.5 99.4 99.5<br />
5.3 Long term trends<br />
The availability of ticketing equipment on metropolitan trains and buses has remained very high over the past<br />
two and a half years.<br />
18
Figure 12 Quarterly availability of ATS equipment from September 2006 <strong>to</strong> <strong>December</strong> <strong>2009</strong><br />
Availability of Ticketing Equipment (%)<br />
100<br />
95<br />
90<br />
85<br />
Jul–Sep<br />
2006<br />
Oct–Dec<br />
2006<br />
Jan–Mar Apr–Jun Jul–Sep<br />
2007 2007 2007<br />
Oct–Dec Jan–Mar<br />
2007 2008 Apr–Jun Jul–Sep<br />
2008 2008<br />
Oct–Dec Jan–Mar<br />
2008 <strong>2009</strong> Apr–Jun<br />
<strong>2009</strong><br />
Jul–Sep<br />
<strong>2009</strong> Oct–Dec<br />
<strong>2009</strong><br />
Train vending machines<br />
Train valida<strong>to</strong>rs<br />
Tram vending machines<br />
Tram valida<strong>to</strong>rs<br />
Bus vending machines<br />
Bus valida<strong>to</strong>rs<br />
5.4 Vandalism of ATS equipment<br />
There were 1,523 reported incidents in the <strong>December</strong>r quarter <strong>2009</strong>..<br />
Figure 13 Incidents of vandalism <strong>to</strong> ATS equipment by quarter, March 2001 <strong>to</strong> <strong>December</strong> <strong>2009</strong><br />
Vandalism indicidents per quarter<br />
8,000<br />
7,000<br />
6,000<br />
5,000<br />
4,000<br />
3,000<br />
2,000<br />
1,000<br />
0<br />
Mar<br />
2001<br />
Sept<br />
2001<br />
Mar<br />
2002<br />
Sept<br />
2002<br />
Mar<br />
2003<br />
Sept<br />
2003<br />
Mar<br />
2004<br />
Sept<br />
2004<br />
Mar<br />
2005<br />
Sept<br />
2005<br />
Mar<br />
2006<br />
Sept<br />
2006<br />
Mar<br />
2007<br />
Sept<br />
2007<br />
Mar<br />
2008<br />
Sept<br />
2008<br />
Mar<br />
<strong>2009</strong><br />
Sept<br />
<strong>2009</strong><br />
Total Vandalism Incidents<br />
19<br />
<strong>Track</strong> <strong>Record</strong> ISSuE <strong>41</strong>
Section 6<br />
Glossary of Terminology<br />
6.1 Contracts and partnership agreements<br />
Metropolitan buses, trains and trams and regional <strong>to</strong>wn bus services are operated by the private sec<strong>to</strong>r under<br />
contracts or franchise arrangements (referred <strong>to</strong> as Partnership Agreements) with the State Government.<br />
Regional V/Line train and inter-<strong>to</strong>wn coach services are operated by the V/Line Passenger Corporation,<br />
a Government statu<strong>to</strong>ry authority.<br />
Note: new Partnership Agreements for the delivery of metropolitan train and tram services started on 30<br />
November <strong>2009</strong>.<br />
The Direc<strong>to</strong>r of <strong>Public</strong> <strong>Transport</strong> manages the train and tram Partnership Agreements and bus contracts.<br />
The agreements and contracts specify requirements which opera<strong>to</strong>rs must provide in relation <strong>to</strong>:<br />
• Levels of service and service performance;<br />
• Cus<strong>to</strong>mer Service Charters including complaints handling and the provision of compensation for poor<br />
service;<br />
• Standards for the cleanliness, services and information available at stations/s<strong>to</strong>ps and on trains and trams;<br />
• In the case of trains and trams, working with the Government on network and project planning;<br />
• The tickets they must offer and the fares they must charge for tickets; and<br />
• Other performance standards. For example, during special events and public holidays; and minimising<br />
disruptions during planned works.<br />
In response, the Government moni<strong>to</strong>rs the quality of services opera<strong>to</strong>rs provide <strong>to</strong> the community, with<br />
emphasis on:<br />
• Punctuality and reliability: comparing the performance of train, tram and bus services with government-set<br />
punctuality and service delivery targets and thresholds; and<br />
• Cus<strong>to</strong>mer satisfaction: using surveys <strong>to</strong> measure whether opera<strong>to</strong>rs are providing the quality of service<br />
cus<strong>to</strong>mers expect.<br />
6.2 Punctuality and reliability measurements<br />
Punctuality<br />
Punctuality is defined as the percentage of delivered services that run on time.<br />
Metropolitan trains, trams and buses – For trains and buses, on-time performance is measured at the end<br />
of the journey.<br />
Tram on-time performance is measured at moni<strong>to</strong>ring points along the route (as the average of the second,<br />
third and fourth of five moni<strong>to</strong>ring points) and near the destination (at point four of five moni<strong>to</strong>ring points). Since<br />
tram on-time performance is greatly affected by road congestion, both the destination punctuality performance<br />
figures and the average punctuality are reported.<br />
A metropolitan train or tram service is considered on-time if it arrives no more than 59 seconds before and no<br />
more than four minutes and 59 seconds after the time in the timetable. Prior <strong>to</strong> 30 November <strong>2009</strong>, a service<br />
was considered on-time if it arrived no more than 59 seconds before and no more than five minutes and 59<br />
seconds after the time in the timetable.<br />
Metropolitan buses are on time if they are no more than two minutes early or five minutes late at the destination.<br />
20
For tram services, the 77 per cent passenger compensation threshold for punctuality relates <strong>to</strong> the average of<br />
the punctuality at the second, third and fourth of the five moni<strong>to</strong>ring points along the length of the route under<br />
the new punctuality measure.<br />
V/Line Passenger trains – long distance V/Line Passenger services are considered <strong>to</strong> be on time if they<br />
arrive no more than ten minutes 59 seconds late, while short-distance services are considered <strong>to</strong> be on time if<br />
they arrive no more than five<br />
Reliability<br />
The reliability measure for metropolitan train and tram services changed on 30 November <strong>2009</strong>.<br />
Previously, this was a measure of the percentage of scheduled services that were cancelled and a 98 per cent<br />
threshold applied. The reliability measure has been expanded <strong>to</strong> include short services (ie services delivered<br />
in part but not in full) and loop bypass events, such as when a service is scheduled <strong>to</strong> travel through the City<br />
or Wes<strong>to</strong>na loops but fails <strong>to</strong> do so. Although the measure has been expanded, the 98 per cent threshold has<br />
not changed.<br />
For trains, a short service is counted as a quarter of a cancellation and a bypass event is counted as an<br />
eighth of a cancellation. For trams, a short service is counted as an eighth of a cancellation. This improved,<br />
new measure of service delivery is referred <strong>to</strong> as the percentage of timetable not delivered. An increase in this<br />
measure reflects a decline in performance.<br />
The reliability measure for regional trains continues <strong>to</strong> be based on the percentage of scheduled services that<br />
are not cancelled. The threshold is 96 percent. See Table 12 for further details.<br />
Metropolitan and regional bus services are deemed reliable if 99 percent of all scheduled services on any day<br />
operate and are completed.<br />
How Operational Performance Regime payments or penalties are calculated<br />
All timetabled train and tram services are moni<strong>to</strong>red every day of the week.<br />
Delays, cancellations and other service failures are measured <strong>to</strong> the nearest 60 seconds and ‘weighted’<br />
according <strong>to</strong> the number of people estimated <strong>to</strong> be travelling on the train or tram. The passenger weightings<br />
vary according <strong>to</strong> the time period, day of week and direction of travel. Delays <strong>to</strong> a heavily-loaded peak train<br />
or tram are given a greater value than delays <strong>to</strong> a less loaded off-peak train or tram. This system provides a<br />
measure of operational performance expressed in ‘passenger-weighted minutes’ of delay.<br />
Passenger-weighted minutes of delay in each month are checked against performance targets set in the<br />
partnership agreements. Performance against these targets determines whether a bonus or a penalty<br />
applies <strong>to</strong> an opera<strong>to</strong>r. This bonus and penalty system is referred <strong>to</strong> as the Operational Performance<br />
Regime (OPR). Bonuses and penalties are capped at $1 million for metropolitan trains and $500,000<br />
for trams per calendar month.<br />
Metropolitan bus services are not included in this performance regime. Bus opera<strong>to</strong>rs provide performance<br />
data for bus services (on-time running and cancellations) via monthly ‘key performance indica<strong>to</strong>r’ returns.<br />
6.3 Passenger compensation<br />
Train and tram Partnership Agreements require opera<strong>to</strong>rs <strong>to</strong> provide punctuality and reliability (number of<br />
cancellations) service levels above a government-set threshold. Opera<strong>to</strong>rs must report <strong>to</strong> passengers every<br />
month on whether or not they have met the minimum service requirements.<br />
21<br />
<strong>Track</strong> <strong>Record</strong> ISSuE <strong>41</strong>
Opera<strong>to</strong>rs who fail <strong>to</strong> meet minimum service levels must provide compensation (in the form of complimentary<br />
tickets) <strong>to</strong> passengers. The compensation applies only <strong>to</strong> passengers holding valid periodical tickets of four<br />
weeks or more who travelled on the service concerned during the month in question. Passengers apply<br />
directly <strong>to</strong> the opera<strong>to</strong>r for the compensation.<br />
V/Line services within each corridor are separated in<strong>to</strong> short-distance and long-distance services, with<br />
passenger compensation assessed and payable separately for the two categories.<br />
Table 12 Service level thresholds for compensation purposes (%)<br />
Punctuality<br />
Reliability<br />
Arrival by 4 minutes,<br />
59 seconds<br />
Arrival by 5 minutes,<br />
59 seconds<br />
Metropolitan trains Metropolitan trams V/Line Passenger<br />
88 77<br />
92 # 80 # 92^<br />
% of timetable delivered 98 98<br />
% of kilometres delivered 98 # 95 # 96<br />
#Measure valid until 29 November <strong>2009</strong><br />
^For long distance V/Line services, on-time arrival is defined as arriving no later than 10 minutes and 59 seconds after the<br />
timetabled arrival time.<br />
6.4 Payments<br />
The details presented in this bulletin on payments for public transport services include:<br />
• Components of the contract payments made by the State <strong>to</strong> the opera<strong>to</strong>rs and major service suppliers for<br />
the services provided;<br />
• Incentive or penalty payments relating <strong>to</strong> performance during a particular period; and<br />
• In the case of metropolitan train and tram opera<strong>to</strong>rs, farebox revenue for the period from 1 <strong>Oc<strong>to</strong>ber</strong> <strong>2009</strong><br />
<strong>to</strong> 26 November <strong>2009</strong> and new ticketing revenue guarantee payments from 30 November <strong>2009</strong> until 31<br />
<strong>December</strong> <strong>2009</strong>.<br />
The incentive and penalty payments are reported on an accrual basis. The magnitude of these payments<br />
(whether an incentive or penalty payment) is capped at $1 million per month for metropolitan trains and at<br />
$500 thousand dollars per month for trams. The figures are not final, as the contracts allow for adjustment in<br />
limited circumstances in later periods. Payments for prior quarters are subject <strong>to</strong> change based on audits or<br />
mitigated performance adjustments.<br />
The new ticketing revenue guarantee payment replaces the farebox distribution that was provided <strong>to</strong> all<br />
opera<strong>to</strong>rs prior <strong>to</strong> 30 November <strong>2009</strong>. The new payment is a result of the introduction of the new Myki<br />
ticketing system and is expected <strong>to</strong> continue for 18 months after the Metcard ticketing system is turned off.<br />
At that time, the franchisees will be entitled <strong>to</strong> farebox distribution under the revenue split arrangements<br />
stipulated in the New Ticketing System Revenue Sharing Agreement.<br />
The new train and tram Partnership Agreements do not include concession <strong>to</strong>p-up payments for the usage<br />
of concession tickets.<br />
All payments are exclusive of GST. Negative figures represent payments by the franchisee <strong>to</strong> the State.<br />
22
6.5 Cus<strong>to</strong>mer satisfaction<br />
The Direc<strong>to</strong>r of <strong>Public</strong> <strong>Transport</strong> commissions monthly surveys <strong>to</strong> measure whether opera<strong>to</strong>rs are providing<br />
the quality of service cus<strong>to</strong>mers expect. A sample of people is randomly selected from electronic telephone<br />
direc<strong>to</strong>ries in areas where train, tram, bus, coach and metropolitan taxi services operate. Interviews are<br />
conducted by telephone. Interviewees are asked <strong>to</strong>:<br />
• Indicate their usual public transport usage<br />
• State their level of satisfaction with specific aspects of public transport, as well as the service overall.<br />
Respondents who do not use public transport are asked for their reasons and <strong>to</strong> indicate what would<br />
influence them <strong>to</strong> begin using public transport.<br />
Up <strong>to</strong> the end of March <strong>2009</strong>, responses from interviewees were given a score of between 0 and 100 as per<br />
the following scale:<br />
• Totally satisfied 100<br />
• Very satisfied 80<br />
• Somewhat satisfied 60<br />
• Somewhat dissatisfied 40<br />
• Very dissatisfied 20<br />
• Totally dissatisfied 0<br />
From April <strong>2009</strong> onwards, cus<strong>to</strong>mers provided ratings using a 0 <strong>to</strong> 10 scale where 0 represented ’extremely<br />
dissatisfied‘ and 10 represented ’extremely satisfied‘. Note that overall satisfaction questions continued <strong>to</strong> be<br />
asked using the old scale <strong>to</strong> facilitate comparisons over time.<br />
Survey results are compiled in<strong>to</strong> quarterly cus<strong>to</strong>mer satisfaction indices <strong>to</strong> allow for comparisons between<br />
modes, opera<strong>to</strong>rs and aspects of service delivery.<br />
Note: Differences between metropolitan and regional passenger services should be taken in<strong>to</strong> account when<br />
making such comparisons. These differences include the purpose and distance of travel, and the types of<br />
services offered on metropolitan and regional services.<br />
6.6 Ticketing and Cus<strong>to</strong>mer-Defined Availability (CDA)<br />
A private company under contract <strong>to</strong> the State Government operates and maintains the Metcard ticketing<br />
system for Melbourne’s public transport. The current contract was awarded in May 1994 <strong>to</strong> the consortium<br />
OneLink Transit Systems Pty Ltd.<br />
CDA targets represent minimum levels of acceptable availability and performance, and allow for specified<br />
levels of non-availability due <strong>to</strong> maintenance, servicing and breakdowns.<br />
The targets are included in the OneLink contract and determine whether OneLink incurs a penalty or receives<br />
an incentive payment for its performance.<br />
Moni<strong>to</strong>ring of ticketing equipment<br />
The status of ticketing equipment at railway stations is au<strong>to</strong>matically moni<strong>to</strong>red via communication lines <strong>to</strong><br />
OneLink. OneLink, therefore, has accurate and up-<strong>to</strong>-date information on the availability of ticketing machines<br />
at railway stations and can promptly schedule repairs or servicing. For repairs, OneLink gives priority <strong>to</strong><br />
equipment at busier stations, where more tickets are purchased.<br />
Mobile equipment on board trams and buses does not have a permanent communication link. Therefore,<br />
equipment availability cannot be known exactly. Tram and bus opera<strong>to</strong>rs are required <strong>to</strong> make vehicles with<br />
faulty equipment available <strong>to</strong> OneLink.<br />
Due <strong>to</strong> these differences between fixed and mobile equipment, measures and performance targets vary<br />
between modes.<br />
23<br />
<strong>Track</strong> <strong>Record</strong> ISSuE <strong>41</strong>
DOT4775/10