17.01.2015 Views

Track Record 41, October to December 2009 - Public Transport ...

Track Record 41, October to December 2009 - Public Transport ...

Track Record 41, October to December 2009 - Public Transport ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ISSUE<br />

<strong>41</strong><br />

Services <strong>Oc<strong>to</strong>ber</strong> <strong>to</strong> <strong>December</strong> <strong>2009</strong><br />

<strong>Track</strong> <strong>Record</strong><br />

Vic<strong>to</strong>rian <strong>Transport</strong> Services<br />

Quarterly Performance Bulletin<br />

Department of <strong>Transport</strong>


Contents<br />

Minister’s Foreword 2<br />

SECTION 1<br />

Introduction and Summary 3<br />

SECTION 2<br />

Punctuality and Reliability 5<br />

SECTION 3<br />

Payments 9<br />

SECTION 4<br />

Cus<strong>to</strong>mer Satisfaction 12<br />

SECTION 5<br />

Performance of<br />

Au<strong>to</strong>matic Ticketing System<br />

(ATS) Equipment 18<br />

SECTION 6<br />

Glossary of Terminology 20


MINISTER’S FOREWORD<br />

An important miles<strong>to</strong>ne in the delivery of the $38 billion Vic<strong>to</strong>rian <strong>Transport</strong> Plan has<br />

been achieved with the commencement of new contracts between the Vic<strong>to</strong>rian<br />

Government and Melbourne’s new train and tram opera<strong>to</strong>rs.<br />

Metro Trains Melbourne (MTM) and Keolis Downer EDI (KDR) assumed operational<br />

control of the metropolitan train and tram networks on 30 November <strong>2009</strong>,<br />

heralding a new partnership with the Vic<strong>to</strong>rian Government <strong>to</strong> provide passengers<br />

with safe, clean and reliable public transport.<br />

Both opera<strong>to</strong>rs were chosen because of their commitments <strong>to</strong> continuously<br />

improve the train and tram services. These commitments are backed by updated<br />

franchise arrangements designed <strong>to</strong> meet cus<strong>to</strong>mer expectations.<br />

Performance measures for punctuality and reliability have been <strong>to</strong>ughened: a train or tram must now arrive<br />

within five minutes of its scheduled time <strong>to</strong> be regarded as on-time. Punctuality was previously defined as<br />

arriving within six minutes of the scheduled time.<br />

In addition, the reliability measure has now been expanded. This measure continues <strong>to</strong> include cancelled<br />

services, but now also includes services that complete some but not all of the scheduled journey.<br />

Under updated Operational Performance Regime arrangements, good performance will be rewarded<br />

with bonuses while failure <strong>to</strong> meet target benchmarks will result in fines of up <strong>to</strong> $1 million a month. A new<br />

Cus<strong>to</strong>mer Experience Performance Regime will also apply <strong>to</strong> ensure safety, cleanliness and information are<br />

core parts of service delivery.<br />

The <strong>Track</strong> <strong>Record</strong> quarterly and monthly bulletins will continue <strong>to</strong> provide the community with access <strong>to</strong><br />

performance results and ensure we have an open and accountable system.<br />

Through the Vic<strong>to</strong>rian <strong>Transport</strong> Plan, the Government is taking action <strong>to</strong> build a better transport network.<br />

MTM and KDR, along with our other public transport opera<strong>to</strong>rs, will be significant contribu<strong>to</strong>rs <strong>to</strong> that plan.<br />

MARTIN PAKULA MP<br />

Minister for <strong>Public</strong> <strong>Transport</strong><br />

2


Section 1<br />

Introduction and Summary<br />

1.1 Introduction<br />

This edition of <strong>Track</strong> <strong>Record</strong> provides details on the performance of public transport services in Vic<strong>to</strong>ria<br />

for the period from <strong>Oc<strong>to</strong>ber</strong> <strong>to</strong> <strong>December</strong> <strong>2009</strong> (referred <strong>to</strong> as the <strong>December</strong> quarter <strong>2009</strong>).<br />

During that period, new franchise contracts for the operation of Melbourne’s passenger train and tram<br />

networks commenced. From 30 November <strong>2009</strong>, Metro Trains Melbourne (operating as Metro) and<br />

Keolis Downer EDI (operating as Yarra Trams (KDR)) commenced eight-year contracts with the<br />

Vic<strong>to</strong>rian Government.<br />

The new contracts and cus<strong>to</strong>mer charters include revised definitions for punctuality and reliability measures<br />

and new service level thresholds for passenger compensation:<br />

• Metropolitan trains and tram services are now regarded as punctual if they arrive no earlier than 59 seconds<br />

before and no later than four minutes and 59 seconds after the timetabled arrival time.<br />

• Reliability for metropolitan trains and trams is now based on the percentage of the timetable delivered.<br />

Performances measures for regional trains and coaches and for metropolitan buses are unchanged.<br />

Further explanations and threshold details are outlined in the Glossary at the back of this bulletin.<br />

To enable comparisons of performance of current and past performance, punctuality and reliability figures<br />

based on both the new and former measures are provided in Section 2 of this bulletin.<br />

The means by which the new franchisees are funded has also changed including the method by which<br />

incentive and penalty payments are determined. These changes are explained in the Payments section<br />

of this bulletin.<br />

Please note:<br />

Metropolitan trains =<br />

Connex (<strong>Oc<strong>to</strong>ber</strong> 1 –<br />

November 29) and Metro<br />

(November 30 – <strong>December</strong> 31)<br />

Metropolitan trams =<br />

Yarra Trams operated by Metrolink<br />

(<strong>Oc<strong>to</strong>ber</strong> 1 – November 29)<br />

and KDR (November 30 – <strong>December</strong> 31<br />

Regional trains<br />

= V/Line Passenger<br />

3<br />

<strong>Track</strong> <strong>Record</strong> ISSuE <strong>41</strong>


1.2 Summary<br />

Punctuality<br />

Metropolitan trains<br />

Metropolitan trams<br />

V/Line Passenger<br />

Punctual <strong>to</strong> 4 minutes, 59 seconds: 86.0%<br />

Punctual <strong>to</strong> 5 minutes, 59 seconds: 90.7%<br />

Punctual <strong>to</strong> 4 minutes, 59 seconds: 82.2%<br />

Punctual <strong>to</strong> 5 minutes, 59 seconds: 85.3%<br />

84.8 per cent<br />

Reliability<br />

Metropolitan trains<br />

Percentage of timetable not delivered: 1.2%<br />

Percentage of network cancellations: 1.0%<br />

Metropolitan trams<br />

Percentage of timetable not delivered: 0.7%<br />

Percentage of network cancellations: 0.2%<br />

V/Line Passenger Percentage of services cancelled: 1.7%<br />

Payments<br />

Yarra Trams (KDR) received an incentive payment for reducing service disruption levels below the agreed<br />

contractual performance standards. The other opera<strong>to</strong>rs did not meet these performance standards and<br />

incurred penalty payments for the <strong>December</strong> quarter <strong>2009</strong>.<br />

Metropolitan trains - Metro<br />

Metropolitan trams - KDR<br />

Metropolitan trains - Connex<br />

Metropolitan trams - Metrolink<br />

V/Line Passenger<br />

Cus<strong>to</strong>mer satisfaction<br />

Metropolitan modes (trains, trams and buses)<br />

Metropolitan taxis<br />

V/Line Passenger trains<br />

V/Line Passenger coaches<br />

Availability of ticketing equipment<br />

Railway vending machines<br />

Railway valida<strong>to</strong>rs<br />

Tram vending machines<br />

Tram valida<strong>to</strong>rs<br />

Bus ticket issuing machines<br />

Bus valida<strong>to</strong>rs<br />

-$<strong>41</strong>3 thousand<br />

$450 thousand<br />

-$4.237 million<br />

-$231 thousand<br />

-$387 thousand<br />

59.7 index points<br />

57.5 index points<br />

73.4 index points<br />

71.7 index points<br />

98.70 per cent<br />

99.51 per cent<br />

97.7 per cent<br />

98.1 per cent<br />

99.4 per cent<br />

99.5 per cent<br />

4


Section 2<br />

Punctuality and Reliability<br />

For an explanation of how punctuality and reliability is determined, please refer <strong>to</strong> the Glossary on page 20.<br />

2.1 Punctuality<br />

Please note: punctuality outcomes for metropolitan trains and trams discussed in the text below are based<br />

on revised measures introduced in the new franchise contracts, ie, punctual <strong>to</strong> 4 minutes and 59 seconds.<br />

Details of the results under both the previous and current measures appear in Table 1.<br />

Metropolitan trains Metropolitan Trams V/Line Passenger trains Metropolitan buses<br />

Metropolitan train<br />

punctuality in the<br />

<strong>December</strong> quarter<br />

<strong>2009</strong> was 86.0 per cent.<br />

This is lower than in<br />

the September quarter<br />

(88.6 per cent) and<br />

the <strong>December</strong> quarter<br />

2008 (90.9 per cent).<br />

Tram punctuality<br />

(average over route) in<br />

the <strong>December</strong> quarter<br />

<strong>2009</strong> (82.2 per cent)<br />

was comparable<br />

with the previous<br />

quarter (82.3 per cent)<br />

and higher than the<br />

<strong>December</strong> quarter<br />

2008 (78.5 per cent).<br />

Regional train<br />

punctuality was 84.8 per<br />

cent in the <strong>December</strong><br />

quarter <strong>2009</strong>, lower than<br />

in the previous quarter<br />

(89.3 per cent) and<br />

the <strong>December</strong> quarter<br />

2008 (88.2 per cent).<br />

Metropolitan buses.<br />

Metropolitan bus<br />

punctuality was 93.9 per<br />

cent in the <strong>December</strong><br />

quarter <strong>2009</strong>. This<br />

is comparable with<br />

the previous quarter<br />

result (94.2 per cent).<br />

Table 1 On-time performance for trains, trams and buses as a percentage of<br />

services run, <strong>December</strong> quarter 2008 <strong>to</strong> <strong>December</strong> quarter <strong>2009</strong><br />

Oct-Dec<br />

2008<br />

Jan–Mar<br />

<strong>2009</strong><br />

Apr–Jun<br />

<strong>2009</strong><br />

Jul–Sept<br />

<strong>2009</strong><br />

Oct-Dec<br />

<strong>2009</strong><br />

Metropolitan trains<br />

4 minutes, 59 seconds<br />

5 minutes, 59 seconds<br />

90.9<br />

94.2<br />

85.1<br />

88.7<br />

86.3<br />

90.2<br />

88.6<br />

92.4<br />

86.0<br />

90.7<br />

Metropolitan trams –<br />

average over route<br />

4 minutes, 59 seconds<br />

5 minutes, 59 seconds<br />

78.5<br />

81.9<br />

77.9<br />

81.4<br />

80.0<br />

83.5<br />

82.3<br />

85.3<br />

82.2<br />

85.3<br />

Metropolitan trams<br />

– at destination<br />

V/Line Passenger<br />

trains<br />

4 minutes, 59 seconds<br />

5 minutes, 59 seconds<br />

66.8<br />

71.8<br />

66.2<br />

71.2<br />

68.9<br />

74.0<br />

71.9<br />

76.6<br />

71.8<br />

76.7<br />

88.2 82.0 86.5 89.3 84.8<br />

Metropolitan buses 93.7 94.5 94.5 94.2 93.9<br />

5<br />

<strong>Track</strong> <strong>Record</strong> ISSuE <strong>41</strong>


Figure 1 On-time performance for trains, trams and buses, <strong>December</strong> quarter 2008<br />

<strong>to</strong> <strong>December</strong> quarter <strong>2009</strong>*<br />

Percentage of services running on time<br />

100<br />

80<br />

60<br />

Oct–Dec 2008 Jan–Mar <strong>2009</strong> Apr–Jun <strong>2009</strong><br />

Metropolitan buses<br />

Metropolitan trams – average over route<br />

Metropolitan trams – at destination<br />

V/Line Passenger trains<br />

Metropolitan trains<br />

Jul–Sep <strong>2009</strong> Oct–Dec <strong>2009</strong><br />

*On-time figures for metropolitan trains and trams in the table above are based on the new punctuality measure.<br />

2.2 Reliability (cancellations)<br />

Please note: reliability outcomes for metropolitan trains and trams discussed in the text below are based on<br />

the revised measures introduced under the new franchise contracts, ie, percentage of timetable not delivered.<br />

See the Glossary for more information on the new reliability measures. Details of the results for both the<br />

previous and current measurements appear in Table 2.<br />

Metropolitan trains Metropolitan Trams V/Line Passenger trains Metropolitan buses<br />

A <strong>to</strong>tal of 1.2 per cent<br />

of the timetable was<br />

not delivered in the<br />

<strong>December</strong> quarter <strong>2009</strong>.<br />

This is an increase on<br />

the September quarter<br />

result (0.8 per cent) but<br />

is comparable <strong>to</strong> the<br />

<strong>December</strong> quarter 2008<br />

(1.1 per cent)..<br />

A <strong>to</strong>tal of 0.7 per cent<br />

of the timetable was<br />

not delivered in the<br />

<strong>December</strong> quarter <strong>2009</strong>.<br />

This is comparable <strong>to</strong><br />

the previous quarter (0.6<br />

per cent) and lower than<br />

the <strong>December</strong> quarter<br />

2008 (0.9 per cent).<br />

Cancellations in the<br />

<strong>December</strong> quarter<br />

<strong>2009</strong> (1.7 per cent)<br />

were higher than the<br />

September quarter<br />

(1.1 per cent) and the<br />

<strong>December</strong> quarter 2008<br />

results (1.0 per cent)<br />

A <strong>to</strong>tal of 0.1 per cent of<br />

services was cancelled<br />

in the <strong>December</strong> quarter<br />

<strong>2009</strong>. This is consistent<br />

with previous quarters<br />

over the preceding 12<br />

months..<br />

6


Table 2 Cancellations of trains, trams and buses <strong>December</strong> quarter 2008<br />

<strong>to</strong> <strong>December</strong> quarter <strong>2009</strong><br />

Oct-Dec<br />

2008<br />

Jan–Mar<br />

<strong>2009</strong><br />

Apr–Jun<br />

<strong>2009</strong><br />

Jul–Sept<br />

<strong>2009</strong><br />

Oct-Dec<br />

<strong>2009</strong><br />

Metropolitan trains<br />

% of timetable not delivered<br />

% of network cancellations<br />

1.1<br />

1.0<br />

3.0<br />

2.8<br />

0.8<br />

0.6<br />

0.8<br />

0.6<br />

1.2<br />

1.0<br />

Metropolitan trams –<br />

% of timetable not delivered<br />

% of network cancellations<br />

0.9<br />

0.2<br />

1.1<br />

0.4<br />

0.8<br />

0.2<br />

0.6<br />

0.1<br />

0.7<br />

0.2<br />

V/Line Passenger<br />

trains<br />

% of network cancellations 1.0 3.5 1.4 1.1 1.7<br />

Metropolitan buses % of network cancellations 0.1 0.1 0.1 0.1 0.1<br />

Figure 2 Cancellation of trains, trams and buses, <strong>December</strong> quarter 2008<br />

<strong>to</strong> <strong>December</strong> quarter <strong>2009</strong>*<br />

Percentage of services cancelled<br />

3.5<br />

3.0<br />

2.5<br />

2.0<br />

1.5<br />

1.0<br />

0.5<br />

0.0<br />

Oct–Dec 2008 Jan–Mar <strong>2009</strong> Apr–Jun <strong>2009</strong><br />

Metropolitan buses<br />

Metropolitan trams<br />

Regional trains<br />

Metropolitan trains<br />

Jul–Sep <strong>2009</strong> Oct–Dec <strong>2009</strong><br />

*Figure 2 reflects the new reliability measure of percentage of timetable not delivered for metropolitan trains and trams.<br />

7<br />

<strong>Track</strong> <strong>Record</strong> ISSuE <strong>41</strong>


For details of thresholds for passenger compensation, please refer <strong>to</strong> the Glossary on page 20.<br />

2.3 Passenger compensation<br />

Metroplitan trains Metropolitan trams V/Line Passenger trains<br />

• Passenger compensation<br />

was payable in <strong>Oc<strong>to</strong>ber</strong>,<br />

November and <strong>December</strong> as<br />

network punctuality was below<br />

the applicable threshold.<br />

•No passenger compensation<br />

was payable in the<br />

<strong>December</strong> <strong>2009</strong> quarter.<br />

• Passenger compensation<br />

was payable in <strong>Oc<strong>to</strong>ber</strong><br />

<strong>2009</strong> as punctuality was<br />

below the applicable<br />

threshold on all corridors<br />

except Ararat, Sheppar<strong>to</strong>n<br />

and Swan Hill/Echuca.<br />

• Passenger compensation was<br />

payable in November <strong>2009</strong><br />

as punctuality was below<br />

the applicable threshold<br />

on all corridors except<br />

Ararat while reliability was<br />

also below the threshold<br />

on the Bendigo corridor.<br />

• Passenger compensation<br />

was payable in <strong>December</strong><br />

<strong>2009</strong> as punctuality was<br />

below the applicable<br />

threshold on all corridors<br />

except Ararat and Ballarat.<br />

8


Section 3<br />

Payments<br />

See the Glossary on page 20 for an explanation relating <strong>to</strong> the payment details in this section.<br />

3.1 Metropolitan trains and trams<br />

The payment information provided in Tables 3 and 4 relates <strong>to</strong> the current metropolitan franchise contracts<br />

that commenced on 30 November <strong>2009</strong>. The payment schedule in these contracts includes several<br />

adjustments in the types of payments provided.<br />

The new franchise contracts have introduced several new payments and/or payment arrangements,<br />

including:<br />

• The establishment of a monthly cap (of $1 million for train and $500,000 for tram) for penalty and<br />

incentive payments.<br />

• The replacement of farebox and farebox-related payments with a new ticketing revenue guarantee payment<br />

for the transition period (ie. until 18 months after the Metcard ticketing system is turned off).*<br />

• The introduction of a new Business Systems Upgrade payment <strong>to</strong> encourage incremental upgrades <strong>to</strong><br />

information, telecommunications and technology systems.<br />

• The introduction of the Cus<strong>to</strong>mer Service Standards and Cus<strong>to</strong>mer Experience Performance Regime<br />

(aimed at improving cus<strong>to</strong>mer satisfaction with public transport services) with capped payments/penalties<br />

(of $1 million per annum for train and $500,000 per annum for tram).<br />

* More information on the new ticketing revenue guarantee payment is available from the Glossary. The <strong>to</strong>tal metropolitan farebox<br />

for the period from 27 November <strong>to</strong> 31 <strong>December</strong> <strong>2009</strong> was $44,328,398. This farebox was not distributed <strong>to</strong> the opera<strong>to</strong>rs.<br />

All opera<strong>to</strong>rs, except KDR, incurred Operational Performance Regime penalty payments as service disruption<br />

levels exceeded the agreed target levels in the <strong>December</strong> quarter <strong>2009</strong>:<br />

• Metro -$<strong>41</strong>3 thousand<br />

• Yarra Trams (operated by KDR) $450 thousand<br />

• Connex -$4.237 million<br />

• Yarra Trams (operated by Metrolink) -$213 thousand<br />

Table 3 Metro payments ($ ,000)<br />

Table 4 Yarra Trams (KDR) payments ($ ,000)<br />

Payment type 30 Nov – 31 Dec <strong>2009</strong><br />

Base contract 23,900<br />

Ticketing revenue<br />

guarantee<br />

21,866<br />

Maintenance 0<br />

Business Systems<br />

Upgrade<br />

0<br />

Payment type 30 Nov – 31 Dec <strong>2009</strong><br />

Base contract 4,246<br />

Ticketing revenue<br />

guarantee<br />

14,648<br />

Maintenance 0<br />

Business Systems<br />

Upgrade<br />

0<br />

Rolling s<strong>to</strong>ck<br />

adjustment<br />

7,233<br />

Rolling s<strong>to</strong>ck<br />

adjustment<br />

2,922<br />

Incentive and penalty -<strong>41</strong>3<br />

Capital projects 0<br />

Other 0<br />

TOTAL 52,586<br />

Incentive and penalty 450<br />

Capital projects 0<br />

Other 1,788<br />

TOTAL 24,054<br />

9<br />

<strong>Track</strong> <strong>Record</strong> ISSuE <strong>41</strong>


The payment information provided in Tables 5 and 6 relates <strong>to</strong> the previous metropolitan rail franchise<br />

partnerships which operated from 18 April 2004 <strong>to</strong> 29 November <strong>2009</strong>. The farebox figures in these tables<br />

represent an agreed payment of 40 per cent of the metropolitan farebox <strong>to</strong> each of the rail franchisees.<br />

The remaining 20 per cent was remitted <strong>to</strong> the State.<br />

Table 5 Connex payments ($ ,000)<br />

Payment type Oct-Dec 2008 Jan-Mar <strong>2009</strong> Apr-Jun <strong>2009</strong> Jul-Sep <strong>2009</strong> 1 Oct-29 Nov <strong>2009</strong><br />

Base contract 44,5<strong>41</strong> 39,355 40,959 60,907 32,398<br />

Farebox 54,851 58,350 59,279 60,949 37,531<br />

Concession <strong>to</strong>p-up 6,979 6,109 8,263 6,810 6,923<br />

Maintenance 30,484 27,687 22,258 33,038 26,999<br />

Rolling s<strong>to</strong>ck<br />

adjustment<br />

23,149 23,046 22,748 22,366 14,588<br />

Incentive and penalty -5,558 -7,339 -4,501 -3,778 -4,237<br />

Capital projects 12,264 6,990 1,569 4,346 7,555<br />

Other 2,320 -6,779 3,314 3,488 -4,397<br />

TOTAL 169,030 147,<strong>41</strong>9 153,889 188,126 117,360<br />

Table 6 Yarra Trams (Metrolink) payments ($’000)<br />

Payment type Oct-Dec 2008 Jan-Mar <strong>2009</strong> Apr-Jun <strong>2009</strong> Jul-Sep <strong>2009</strong> 1 Oct-29 Nov <strong>2009</strong><br />

Base contract 980 -353 -279 -956 -857<br />

Farebox 54,851 58,350 59,279 60,949 37,531<br />

Concession <strong>to</strong>p-up 7,210 6,384 8,612 7,039 7,162<br />

Maintenance 6,011 8,589 14,386 7,947 4,542<br />

Rolling s<strong>to</strong>ck<br />

adjustment<br />

8,679 8,708 8,767 8,767 5,845<br />

Incentive and penalty -1,706 -1,758 -1,611 -130 -231<br />

Capital projects 990 288 7,259 845 3,064<br />

Other -13,424 3,402 7,947 3,970 5,386<br />

TOTAL 63,591 83,610 104,360 88,431 62,442<br />

10


3.2 V/Line Passenger trains<br />

Payments by the State <strong>to</strong> the regional rail opera<strong>to</strong>r (V/Line Passenger)—including payments for coach<br />

services directly contracted by V/Line—are summarised in Table 7. Farebox revenue is retained by V/Line and<br />

is included <strong>to</strong> provide an overall indication of the cost of the services. State contract payments represent the<br />

net payments required for V/Line Passenger <strong>to</strong> run the services.<br />

V/Line Passenger incurred an Operational Performance Regime penalty of -$387,000 as service disruption<br />

levels exceeded the agreed target levels in the <strong>December</strong> quarter <strong>2009</strong>.<br />

Table 7 Payment for V/Line Passenger train services ($ ,000)<br />

Payment type Oct-Dec 2008 Jan-Mar <strong>2009</strong> Apr-Jun <strong>2009</strong> Jul-Sep <strong>2009</strong> Oct-Dec <strong>2009</strong><br />

Base contract 58,866 57,683 64,509 62,284 64,444<br />

Farebox 16,175 17,193 17,739 18,191 16,729<br />

Rolling s<strong>to</strong>ck 8,953 8,953 8,953 8,953 8,953<br />

Incentive and penalty -101 -579 -176 142 -387<br />

Capital projects 1,395 843 1,036 2,607 368<br />

Other 37 0 0 0 0<br />

TOTAL 85,325 84,093 92,061 92,177 90,107<br />

3.3 Metropolitan and regional buses<br />

Payments <strong>to</strong> metropolitan, regional and school bus opera<strong>to</strong>rs are presented in Table 8. Farebox revenue<br />

collected is not included in the table as other provisions are in place. For metropolitan services, farebox<br />

revenue is returned <strong>to</strong> the State while regional bus farebox revenue is retained by the opera<strong>to</strong>r. School<br />

services, in most instances, do not collect revenue.<br />

Table 8 Payment for metropolitan and regional bus services ($ ,000)<br />

Payment type Oct-Dec 2008 Jan-Mar <strong>2009</strong> Apr-Jun <strong>2009</strong> Jul-Sep <strong>2009</strong> Oct-Dec <strong>2009</strong><br />

Metropolitan bus 105,644 105,923 111,194 111,787 110,484<br />

Regional bus 23,865 24,176 24,707 24,646 26,866<br />

School bus 45,977 30,435 45,692 46,600 46,723<br />

TOTAL 175,486 160,534 181,593 183,033 184,073<br />

3.4 Metlink<br />

Under current metropolitan rail franchises, Metlink is a provider of system-wide services. Payments <strong>to</strong> Metlink<br />

for services supplied under contracts with the State are presented in Table 9.<br />

Table 9 Payment for Metlink and services ($ ,000)<br />

Payment type Oct-Dec 2008 Jan-Mar <strong>2009</strong> Apr-Jun <strong>2009</strong> Jul-Sep <strong>2009</strong> Oct-Dec <strong>2009</strong><br />

Metlink/TTA 3,948 3,948 3,926 4,160 4,355<br />

Other 0 272 0 0 0<br />

TOTAL 3,948 4,220 3,926 4,160 4,355<br />

11<br />

<strong>Track</strong> <strong>Record</strong> ISSuE <strong>41</strong>


Section 4<br />

Cus<strong>to</strong>mer Satisfaction<br />

For an explanation of how cus<strong>to</strong>mer satisfaction is determined, please refer <strong>to</strong> the Glossary on page 20.<br />

Please Note: satisfaction rates are presented as index points, not percentages.<br />

5.1 Overall satisfaction with metropolitan services<br />

Metropolitan public transport (trains, trams and buses) recorded an overall satisfaction result of<br />

59.7 index points in the <strong>December</strong> quarter <strong>2009</strong> which is consistent with the September quarter result<br />

of 59.8 index points.<br />

Figure 3 Overall satisfaction with metropolitan public transport services (trains, trams and buses),<br />

<strong>December</strong> quarter 2007 <strong>to</strong> <strong>December</strong> quarter <strong>2009</strong><br />

Cus<strong>to</strong>mer Satisfaction Index<br />

75<br />

VERY<br />

SATISFIED<br />

70<br />

65<br />

SOMEWHAT<br />

SATISFIED<br />

60<br />

55<br />

50<br />

Oct–Dec<br />

2007<br />

Jan–Mar<br />

2008<br />

Apr–Jun<br />

2008<br />

Jul–Sep<br />

2008<br />

Oct–Dec<br />

2008<br />

Jan–Mar<br />

<strong>2009</strong><br />

Apr–Jun<br />

<strong>2009</strong><br />

Jul–Sep<br />

<strong>2009</strong><br />

Oct–Dec<br />

<strong>2009</strong><br />

Cus<strong>to</strong>mer satisfaction results for metropolitan trains, trams and buses in the <strong>December</strong> quarter <strong>2009</strong> were<br />

comparable with the September quarter results. Cus<strong>to</strong>mer satisfaction for taxis recorded a slight increase<br />

Metropolitan trains<br />

Metropolitan trams<br />

Metropolitan buses<br />

Metropolitan taxis<br />

60.6 index points<br />

70.0 index points<br />

70.7 index points<br />

57.5 index points<br />

12


Figure 4 Overall satisfaction with metropolitan train, tram, bus and taxi services,<br />

<strong>December</strong> quarter 2007 <strong>to</strong> <strong>December</strong> quarter <strong>2009</strong><br />

Cus<strong>to</strong>mer Satisfaction Index<br />

VERY<br />

SATISFIED<br />

85<br />

80<br />

75<br />

70<br />

SOMEWHAT<br />

SATISFIED<br />

65<br />

60<br />

55<br />

50<br />

Oct–Dec<br />

2007<br />

Jan–Mar<br />

2008<br />

Apr–Jun<br />

2008<br />

Jul–Sep<br />

2008<br />

Oct–Dec<br />

2008<br />

Jan–Mar<br />

<strong>2009</strong><br />

Apr–Jun<br />

<strong>2009</strong><br />

Jul–Sep<br />

<strong>2009</strong><br />

Oct–Dec<br />

<strong>2009</strong><br />

Metropolitan trains<br />

Metropolitan trams<br />

Metropolitan buses<br />

Metropolitan taxis<br />

4.2 Overall satisfaction with V/Line Passenger services<br />

Overall cus<strong>to</strong>mer satisfaction indices for the regional modes recorded slight decreases during the <strong>December</strong><br />

quarter <strong>2009</strong>.<br />

• V/Line Passenger trains 73.4 index points<br />

• V/Line Passenger coaches 71.7 index points<br />

Figure 5 Overall satisfaction with V/Line Passenger trains and coaches, <strong>December</strong> quarter 2007<br />

<strong>to</strong> <strong>December</strong> quarter <strong>2009</strong><br />

Cus<strong>to</strong>mer Satisfaction Index<br />

VERY<br />

SATISFIED<br />

85<br />

80<br />

75<br />

70<br />

SOMEWHAT<br />

SATISFIED<br />

65<br />

60<br />

55<br />

50<br />

Oct–Dec<br />

2007<br />

Jan–Mar<br />

2008<br />

Apr–Jun<br />

2008<br />

Jul–Sep<br />

2008<br />

Oct–Dec<br />

2008<br />

Jan–Mar<br />

<strong>2009</strong><br />

Apr–Jun<br />

<strong>2009</strong><br />

Jul–Sep<br />

<strong>2009</strong><br />

Oct–Dec<br />

<strong>2009</strong><br />

V/Line Passenger trains<br />

V/Line Passenger coaches<br />

13<br />

<strong>Track</strong> <strong>Record</strong> ISSuE <strong>41</strong>


4.3 Key aspects of service quality for trains, trams, taxis, buses and coaches<br />

The following graphs summarise cus<strong>to</strong>mer satisfaction with specific aspects of service. Each graph presents<br />

an overall cus<strong>to</strong>mer satisfaction index as well as separate measurements for major aspects of service, such<br />

as ‘Passenger travel experience’. Note: the overall cus<strong>to</strong>mer satisfaction index is produced from a specific<br />

question in the survey and is not an average of other results.<br />

All graphs are for the <strong>December</strong> quarter <strong>2009</strong>. A statistically significant increase or decrease in the cus<strong>to</strong>mer<br />

satisfaction index from the September <strong>2009</strong> quarter is respectively indicated by a green ‘up’ or red ‘down’<br />

arrow. Where there is no arrow, no statistically significant change has occurred. Minor shifts in the index can<br />

be due <strong>to</strong> the nature of the survey, rather than reflecting a genuine change in cus<strong>to</strong>mer satisfaction.<br />

Metropolitan trains<br />

• Metropolitan train services recorded an overall satisfaction rate of 60.6, comparable with the September<br />

quarter result (60.4).<br />

• While there were no significant changes in the satisfaction with individual service aspects, all recorded<br />

slight increases in satisfaction compared with the September quarter results.<br />

Figure 6 Cus<strong>to</strong>mer satisfaction with metropolitan trains, <strong>December</strong> quarter <strong>2009</strong><br />

Service aspects<br />

ranked highest <strong>to</strong> lowest<br />

Overall satisfaction<br />

Train staff<br />

Metcard ticketing<br />

Information<br />

Running of services<br />

Train stations<br />

Passenger travel experience<br />

Price<br />

Personal security<br />

No significant<br />

change from<br />

September<br />

quarter <strong>2009</strong><br />

<strong>to</strong> <strong>December</strong><br />

quarter <strong>2009</strong>.<br />

0 10 20 30 40 50 60 70 80 90 100<br />

Cus<strong>to</strong>mer Satisfaction Index<br />

14


Metropolitan Trams<br />

• Metropolitan trams recorded an overall satisfaction score of 70.0 points, comparable <strong>to</strong> the September<br />

quarter result (69.8 points)<br />

• The service aspects of Running of services; Metcard ticketing; Personal security; and Price all recorded<br />

significant increases in satisfaction.<br />

Figure 7 Cus<strong>to</strong>mer satisfaction with metropolitan trams, <strong>December</strong> quarter <strong>2009</strong><br />

Service aspects<br />

ranked highest <strong>to</strong> lowest<br />

Overall satisfaction<br />

Running of services<br />

Tram staff<br />

Tram s<strong>to</strong>ps<br />

Metcard ticketing<br />

Personal security<br />

Information<br />

Passenger travel experience<br />

Price<br />

Statistically<br />

significant<br />

increase<br />

from September<br />

quarter <strong>2009</strong><br />

<strong>to</strong> <strong>December</strong><br />

quarter <strong>2009</strong><br />

0 10 20 30 40 50 60 70 80 90 100<br />

Cus<strong>to</strong>mer Satisfaction Index<br />

Metropolitan buses<br />

• Metropolitan buses recorded an overall cus<strong>to</strong>mer satisfaction score of 70.7 points, comparable with the<br />

September quarter result of 70.5 points.<br />

• There was no significant change in any key service aspects between the September and <strong>December</strong> quarters.<br />

Figure 8 Cus<strong>to</strong>mer satisfaction with metropolitan buses, <strong>December</strong> quarter <strong>2009</strong><br />

Service aspects<br />

ranked highest <strong>to</strong> lowest<br />

Overall satisfaction<br />

Bus staff<br />

Passenger travel experience<br />

Metcard ticketing<br />

Personal security<br />

Bus s<strong>to</strong>ps<br />

Information<br />

Running of services<br />

Price<br />

No significant<br />

change from<br />

September<br />

quarter <strong>2009</strong><br />

<strong>to</strong> <strong>December</strong><br />

quarter <strong>2009</strong>.<br />

0 10 20 30 40 50 60 70 80 90 100<br />

Cus<strong>to</strong>mer Satisfaction Index<br />

15<br />

<strong>Track</strong> <strong>Record</strong> ISSuE <strong>41</strong>


V/Line Passenger trains<br />

• Regional train services recorded an overall cus<strong>to</strong>mer satisfaction of 73.4 points, a slight decrease compared<br />

with the September quarter result (75.0 points)<br />

• The service area of Personal security recorded a significant decrease compared with the September quarter.<br />

Figure 9 Cus<strong>to</strong>mer satisfaction with V/Line Passenger trains, <strong>December</strong> quarter <strong>2009</strong><br />

Service aspects<br />

ranked highest <strong>to</strong> lowest<br />

Overall satisfaction<br />

V/Line staff<br />

Price<br />

V/Line Ticketing<br />

Passenger Travel experience<br />

Running of services<br />

Information<br />

V/Line Train stations<br />

Personal security<br />

Statistically<br />

significant<br />

decrease<br />

from September<br />

quarter <strong>2009</strong><br />

<strong>to</strong> <strong>December</strong><br />

quarter <strong>2009</strong><br />

0 10 20 30 40 50 60 70 80 90 100<br />

Cus<strong>to</strong>mer Satisfaction Index<br />

V/Line Passenger coaches<br />

• V//Line passenger coaches recorded an overall satisfaction score of 71.7 points, a slight decrease from the<br />

September quarter result (73.0 points)<br />

• There was no significant change in any key service aspects between the September and <strong>December</strong> quarters.<br />

Figure 10 Cus<strong>to</strong>mer satisfaction with V/Line Passenger coaches, <strong>December</strong> quarter <strong>2009</strong><br />

Service aspects<br />

ranked highest <strong>to</strong> lowest<br />

Overall satisfaction<br />

V/Line staff<br />

Price<br />

Personal security<br />

Information<br />

V/Line ticketing<br />

Passenger travel experience<br />

Running of services<br />

V/Line coach s<strong>to</strong>ps<br />

No significant<br />

change from<br />

September<br />

quarter <strong>2009</strong><br />

<strong>to</strong> <strong>December</strong><br />

quarter <strong>2009</strong>.<br />

0 10 20 30 40 50 60 70 80 90 100<br />

Cus<strong>to</strong>mer Satisfaction Index<br />

16


Metropolitan taxis<br />

• Metropolitan taxis recorded an overall cus<strong>to</strong>mer satisfaction result of 57.5 points, a slight increase on the<br />

September quarter result of 55.2.<br />

• There was no significant change in any key service aspects between the September and <strong>December</strong> quarters.<br />

Figure 11 Cus<strong>to</strong>mer satisfaction with metropolitan taxis, <strong>December</strong> quarter <strong>2009</strong><br />

Service aspects<br />

ranked highest <strong>to</strong> lowest<br />

Overall satisfaction<br />

Personal security<br />

Booking service<br />

Taxi ranks<br />

Fares and payment system<br />

Passenger travel experience<br />

Finding a taxi<br />

Price<br />

Taxi drivers<br />

Information<br />

No significant<br />

change from<br />

September<br />

quarter <strong>2009</strong><br />

<strong>to</strong> <strong>December</strong><br />

quarter <strong>2009</strong>.<br />

0 10 20 30 40 50 60 70 80 90 100<br />

Cus<strong>to</strong>mer Satisfaction Index<br />

17<br />

<strong>Track</strong> <strong>Record</strong> ISSuE <strong>41</strong>


Section 5<br />

Performance of Au<strong>to</strong>matic Ticketing<br />

System (ATS) Equipment<br />

See the Glossary on page 20 for details on Cus<strong>to</strong>mer-Defined Availability (CDA) reporting and a background<br />

on the ticketing contracts.<br />

Note: all figures in this section relate <strong>to</strong> the performance of the Metcard ticketing system and equipment.<br />

5.1 Railway station ticketing equipment<br />

Availability of railway station ticketing equipment exceeded the relevant targets in the <strong>December</strong> quarter <strong>2009</strong>.<br />

Table 10 ATS CDA for ticketing equipment at railway stations (%)<br />

Device Target Oct-Dec 2008 Jan-Mar <strong>2009</strong> Apr-Jun <strong>2009</strong> Jul-Sep <strong>2009</strong> Oct-Dec <strong>2009</strong><br />

Vending machines 98.26 98.71 98.46 98.71 98.77 98.70<br />

Valida<strong>to</strong>rs 99.47 99.57 99.51 99.50 99.56 99.51<br />

5.2 Tram and bus ticketing equipment<br />

Availability remains high for ticketing machines and valida<strong>to</strong>rs on trams and buses.<br />

Table 11 ATS availability for mobile equipment (%)<br />

Mode Device Oct-Dec 2008 Jan-Mar <strong>2009</strong> Apr-Jun <strong>2009</strong> Jul-Sep <strong>2009</strong> Oct-Dec <strong>2009</strong><br />

Tram<br />

Vending<br />

machines<br />

97.8 96.7 97.6 98.2 97.7<br />

Valida<strong>to</strong>rs 98.1 97.5 98.1 98.4 98.1<br />

Bus Issuing machines 99.6 99.3 99.5 99.6 99.4<br />

Valida<strong>to</strong>rs 99.5 99.3 99.5 99.4 99.5<br />

5.3 Long term trends<br />

The availability of ticketing equipment on metropolitan trains and buses has remained very high over the past<br />

two and a half years.<br />

18


Figure 12 Quarterly availability of ATS equipment from September 2006 <strong>to</strong> <strong>December</strong> <strong>2009</strong><br />

Availability of Ticketing Equipment (%)<br />

100<br />

95<br />

90<br />

85<br />

Jul–Sep<br />

2006<br />

Oct–Dec<br />

2006<br />

Jan–Mar Apr–Jun Jul–Sep<br />

2007 2007 2007<br />

Oct–Dec Jan–Mar<br />

2007 2008 Apr–Jun Jul–Sep<br />

2008 2008<br />

Oct–Dec Jan–Mar<br />

2008 <strong>2009</strong> Apr–Jun<br />

<strong>2009</strong><br />

Jul–Sep<br />

<strong>2009</strong> Oct–Dec<br />

<strong>2009</strong><br />

Train vending machines<br />

Train valida<strong>to</strong>rs<br />

Tram vending machines<br />

Tram valida<strong>to</strong>rs<br />

Bus vending machines<br />

Bus valida<strong>to</strong>rs<br />

5.4 Vandalism of ATS equipment<br />

There were 1,523 reported incidents in the <strong>December</strong>r quarter <strong>2009</strong>..<br />

Figure 13 Incidents of vandalism <strong>to</strong> ATS equipment by quarter, March 2001 <strong>to</strong> <strong>December</strong> <strong>2009</strong><br />

Vandalism indicidents per quarter<br />

8,000<br />

7,000<br />

6,000<br />

5,000<br />

4,000<br />

3,000<br />

2,000<br />

1,000<br />

0<br />

Mar<br />

2001<br />

Sept<br />

2001<br />

Mar<br />

2002<br />

Sept<br />

2002<br />

Mar<br />

2003<br />

Sept<br />

2003<br />

Mar<br />

2004<br />

Sept<br />

2004<br />

Mar<br />

2005<br />

Sept<br />

2005<br />

Mar<br />

2006<br />

Sept<br />

2006<br />

Mar<br />

2007<br />

Sept<br />

2007<br />

Mar<br />

2008<br />

Sept<br />

2008<br />

Mar<br />

<strong>2009</strong><br />

Sept<br />

<strong>2009</strong><br />

Total Vandalism Incidents<br />

19<br />

<strong>Track</strong> <strong>Record</strong> ISSuE <strong>41</strong>


Section 6<br />

Glossary of Terminology<br />

6.1 Contracts and partnership agreements<br />

Metropolitan buses, trains and trams and regional <strong>to</strong>wn bus services are operated by the private sec<strong>to</strong>r under<br />

contracts or franchise arrangements (referred <strong>to</strong> as Partnership Agreements) with the State Government.<br />

Regional V/Line train and inter-<strong>to</strong>wn coach services are operated by the V/Line Passenger Corporation,<br />

a Government statu<strong>to</strong>ry authority.<br />

Note: new Partnership Agreements for the delivery of metropolitan train and tram services started on 30<br />

November <strong>2009</strong>.<br />

The Direc<strong>to</strong>r of <strong>Public</strong> <strong>Transport</strong> manages the train and tram Partnership Agreements and bus contracts.<br />

The agreements and contracts specify requirements which opera<strong>to</strong>rs must provide in relation <strong>to</strong>:<br />

• Levels of service and service performance;<br />

• Cus<strong>to</strong>mer Service Charters including complaints handling and the provision of compensation for poor<br />

service;<br />

• Standards for the cleanliness, services and information available at stations/s<strong>to</strong>ps and on trains and trams;<br />

• In the case of trains and trams, working with the Government on network and project planning;<br />

• The tickets they must offer and the fares they must charge for tickets; and<br />

• Other performance standards. For example, during special events and public holidays; and minimising<br />

disruptions during planned works.<br />

In response, the Government moni<strong>to</strong>rs the quality of services opera<strong>to</strong>rs provide <strong>to</strong> the community, with<br />

emphasis on:<br />

• Punctuality and reliability: comparing the performance of train, tram and bus services with government-set<br />

punctuality and service delivery targets and thresholds; and<br />

• Cus<strong>to</strong>mer satisfaction: using surveys <strong>to</strong> measure whether opera<strong>to</strong>rs are providing the quality of service<br />

cus<strong>to</strong>mers expect.<br />

6.2 Punctuality and reliability measurements<br />

Punctuality<br />

Punctuality is defined as the percentage of delivered services that run on time.<br />

Metropolitan trains, trams and buses – For trains and buses, on-time performance is measured at the end<br />

of the journey.<br />

Tram on-time performance is measured at moni<strong>to</strong>ring points along the route (as the average of the second,<br />

third and fourth of five moni<strong>to</strong>ring points) and near the destination (at point four of five moni<strong>to</strong>ring points). Since<br />

tram on-time performance is greatly affected by road congestion, both the destination punctuality performance<br />

figures and the average punctuality are reported.<br />

A metropolitan train or tram service is considered on-time if it arrives no more than 59 seconds before and no<br />

more than four minutes and 59 seconds after the time in the timetable. Prior <strong>to</strong> 30 November <strong>2009</strong>, a service<br />

was considered on-time if it arrived no more than 59 seconds before and no more than five minutes and 59<br />

seconds after the time in the timetable.<br />

Metropolitan buses are on time if they are no more than two minutes early or five minutes late at the destination.<br />

20


For tram services, the 77 per cent passenger compensation threshold for punctuality relates <strong>to</strong> the average of<br />

the punctuality at the second, third and fourth of the five moni<strong>to</strong>ring points along the length of the route under<br />

the new punctuality measure.<br />

V/Line Passenger trains – long distance V/Line Passenger services are considered <strong>to</strong> be on time if they<br />

arrive no more than ten minutes 59 seconds late, while short-distance services are considered <strong>to</strong> be on time if<br />

they arrive no more than five<br />

Reliability<br />

The reliability measure for metropolitan train and tram services changed on 30 November <strong>2009</strong>.<br />

Previously, this was a measure of the percentage of scheduled services that were cancelled and a 98 per cent<br />

threshold applied. The reliability measure has been expanded <strong>to</strong> include short services (ie services delivered<br />

in part but not in full) and loop bypass events, such as when a service is scheduled <strong>to</strong> travel through the City<br />

or Wes<strong>to</strong>na loops but fails <strong>to</strong> do so. Although the measure has been expanded, the 98 per cent threshold has<br />

not changed.<br />

For trains, a short service is counted as a quarter of a cancellation and a bypass event is counted as an<br />

eighth of a cancellation. For trams, a short service is counted as an eighth of a cancellation. This improved,<br />

new measure of service delivery is referred <strong>to</strong> as the percentage of timetable not delivered. An increase in this<br />

measure reflects a decline in performance.<br />

The reliability measure for regional trains continues <strong>to</strong> be based on the percentage of scheduled services that<br />

are not cancelled. The threshold is 96 percent. See Table 12 for further details.<br />

Metropolitan and regional bus services are deemed reliable if 99 percent of all scheduled services on any day<br />

operate and are completed.<br />

How Operational Performance Regime payments or penalties are calculated<br />

All timetabled train and tram services are moni<strong>to</strong>red every day of the week.<br />

Delays, cancellations and other service failures are measured <strong>to</strong> the nearest 60 seconds and ‘weighted’<br />

according <strong>to</strong> the number of people estimated <strong>to</strong> be travelling on the train or tram. The passenger weightings<br />

vary according <strong>to</strong> the time period, day of week and direction of travel. Delays <strong>to</strong> a heavily-loaded peak train<br />

or tram are given a greater value than delays <strong>to</strong> a less loaded off-peak train or tram. This system provides a<br />

measure of operational performance expressed in ‘passenger-weighted minutes’ of delay.<br />

Passenger-weighted minutes of delay in each month are checked against performance targets set in the<br />

partnership agreements. Performance against these targets determines whether a bonus or a penalty<br />

applies <strong>to</strong> an opera<strong>to</strong>r. This bonus and penalty system is referred <strong>to</strong> as the Operational Performance<br />

Regime (OPR). Bonuses and penalties are capped at $1 million for metropolitan trains and $500,000<br />

for trams per calendar month.<br />

Metropolitan bus services are not included in this performance regime. Bus opera<strong>to</strong>rs provide performance<br />

data for bus services (on-time running and cancellations) via monthly ‘key performance indica<strong>to</strong>r’ returns.<br />

6.3 Passenger compensation<br />

Train and tram Partnership Agreements require opera<strong>to</strong>rs <strong>to</strong> provide punctuality and reliability (number of<br />

cancellations) service levels above a government-set threshold. Opera<strong>to</strong>rs must report <strong>to</strong> passengers every<br />

month on whether or not they have met the minimum service requirements.<br />

21<br />

<strong>Track</strong> <strong>Record</strong> ISSuE <strong>41</strong>


Opera<strong>to</strong>rs who fail <strong>to</strong> meet minimum service levels must provide compensation (in the form of complimentary<br />

tickets) <strong>to</strong> passengers. The compensation applies only <strong>to</strong> passengers holding valid periodical tickets of four<br />

weeks or more who travelled on the service concerned during the month in question. Passengers apply<br />

directly <strong>to</strong> the opera<strong>to</strong>r for the compensation.<br />

V/Line services within each corridor are separated in<strong>to</strong> short-distance and long-distance services, with<br />

passenger compensation assessed and payable separately for the two categories.<br />

Table 12 Service level thresholds for compensation purposes (%)<br />

Punctuality<br />

Reliability<br />

Arrival by 4 minutes,<br />

59 seconds<br />

Arrival by 5 minutes,<br />

59 seconds<br />

Metropolitan trains Metropolitan trams V/Line Passenger<br />

88 77<br />

92 # 80 # 92^<br />

% of timetable delivered 98 98<br />

% of kilometres delivered 98 # 95 # 96<br />

#Measure valid until 29 November <strong>2009</strong><br />

^For long distance V/Line services, on-time arrival is defined as arriving no later than 10 minutes and 59 seconds after the<br />

timetabled arrival time.<br />

6.4 Payments<br />

The details presented in this bulletin on payments for public transport services include:<br />

• Components of the contract payments made by the State <strong>to</strong> the opera<strong>to</strong>rs and major service suppliers for<br />

the services provided;<br />

• Incentive or penalty payments relating <strong>to</strong> performance during a particular period; and<br />

• In the case of metropolitan train and tram opera<strong>to</strong>rs, farebox revenue for the period from 1 <strong>Oc<strong>to</strong>ber</strong> <strong>2009</strong><br />

<strong>to</strong> 26 November <strong>2009</strong> and new ticketing revenue guarantee payments from 30 November <strong>2009</strong> until 31<br />

<strong>December</strong> <strong>2009</strong>.<br />

The incentive and penalty payments are reported on an accrual basis. The magnitude of these payments<br />

(whether an incentive or penalty payment) is capped at $1 million per month for metropolitan trains and at<br />

$500 thousand dollars per month for trams. The figures are not final, as the contracts allow for adjustment in<br />

limited circumstances in later periods. Payments for prior quarters are subject <strong>to</strong> change based on audits or<br />

mitigated performance adjustments.<br />

The new ticketing revenue guarantee payment replaces the farebox distribution that was provided <strong>to</strong> all<br />

opera<strong>to</strong>rs prior <strong>to</strong> 30 November <strong>2009</strong>. The new payment is a result of the introduction of the new Myki<br />

ticketing system and is expected <strong>to</strong> continue for 18 months after the Metcard ticketing system is turned off.<br />

At that time, the franchisees will be entitled <strong>to</strong> farebox distribution under the revenue split arrangements<br />

stipulated in the New Ticketing System Revenue Sharing Agreement.<br />

The new train and tram Partnership Agreements do not include concession <strong>to</strong>p-up payments for the usage<br />

of concession tickets.<br />

All payments are exclusive of GST. Negative figures represent payments by the franchisee <strong>to</strong> the State.<br />

22


6.5 Cus<strong>to</strong>mer satisfaction<br />

The Direc<strong>to</strong>r of <strong>Public</strong> <strong>Transport</strong> commissions monthly surveys <strong>to</strong> measure whether opera<strong>to</strong>rs are providing<br />

the quality of service cus<strong>to</strong>mers expect. A sample of people is randomly selected from electronic telephone<br />

direc<strong>to</strong>ries in areas where train, tram, bus, coach and metropolitan taxi services operate. Interviews are<br />

conducted by telephone. Interviewees are asked <strong>to</strong>:<br />

• Indicate their usual public transport usage<br />

• State their level of satisfaction with specific aspects of public transport, as well as the service overall.<br />

Respondents who do not use public transport are asked for their reasons and <strong>to</strong> indicate what would<br />

influence them <strong>to</strong> begin using public transport.<br />

Up <strong>to</strong> the end of March <strong>2009</strong>, responses from interviewees were given a score of between 0 and 100 as per<br />

the following scale:<br />

• Totally satisfied 100<br />

• Very satisfied 80<br />

• Somewhat satisfied 60<br />

• Somewhat dissatisfied 40<br />

• Very dissatisfied 20<br />

• Totally dissatisfied 0<br />

From April <strong>2009</strong> onwards, cus<strong>to</strong>mers provided ratings using a 0 <strong>to</strong> 10 scale where 0 represented ’extremely<br />

dissatisfied‘ and 10 represented ’extremely satisfied‘. Note that overall satisfaction questions continued <strong>to</strong> be<br />

asked using the old scale <strong>to</strong> facilitate comparisons over time.<br />

Survey results are compiled in<strong>to</strong> quarterly cus<strong>to</strong>mer satisfaction indices <strong>to</strong> allow for comparisons between<br />

modes, opera<strong>to</strong>rs and aspects of service delivery.<br />

Note: Differences between metropolitan and regional passenger services should be taken in<strong>to</strong> account when<br />

making such comparisons. These differences include the purpose and distance of travel, and the types of<br />

services offered on metropolitan and regional services.<br />

6.6 Ticketing and Cus<strong>to</strong>mer-Defined Availability (CDA)<br />

A private company under contract <strong>to</strong> the State Government operates and maintains the Metcard ticketing<br />

system for Melbourne’s public transport. The current contract was awarded in May 1994 <strong>to</strong> the consortium<br />

OneLink Transit Systems Pty Ltd.<br />

CDA targets represent minimum levels of acceptable availability and performance, and allow for specified<br />

levels of non-availability due <strong>to</strong> maintenance, servicing and breakdowns.<br />

The targets are included in the OneLink contract and determine whether OneLink incurs a penalty or receives<br />

an incentive payment for its performance.<br />

Moni<strong>to</strong>ring of ticketing equipment<br />

The status of ticketing equipment at railway stations is au<strong>to</strong>matically moni<strong>to</strong>red via communication lines <strong>to</strong><br />

OneLink. OneLink, therefore, has accurate and up-<strong>to</strong>-date information on the availability of ticketing machines<br />

at railway stations and can promptly schedule repairs or servicing. For repairs, OneLink gives priority <strong>to</strong><br />

equipment at busier stations, where more tickets are purchased.<br />

Mobile equipment on board trams and buses does not have a permanent communication link. Therefore,<br />

equipment availability cannot be known exactly. Tram and bus opera<strong>to</strong>rs are required <strong>to</strong> make vehicles with<br />

faulty equipment available <strong>to</strong> OneLink.<br />

Due <strong>to</strong> these differences between fixed and mobile equipment, measures and performance targets vary<br />

between modes.<br />

23<br />

<strong>Track</strong> <strong>Record</strong> ISSuE <strong>41</strong>


DOT4775/10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!