Request for proposal for preparation of feasibility report for four laining with paved shoulder of Sidhi to Singrauli (NH-75E)<br />

Topographic Survey<br />

Attachment A to the TOR<br />

1. The field surveys would be sufficiently detailed to meet the following objectives:<br />

(i) Finalising the alignment including location of new bridges and other grade<br />

separated structures.<br />

(ii) Preliminary layout of intersections and grade separators.<br />

(iii) Preparation of Land Plans for acquisition of additional land where<br />

necessary.<br />

(iv) Plans for shifting and relocation of utilities.<br />

2. The field surveys shall be carried out using high precision instruments, i.e. total<br />

stations and would cover the following activities:<br />

(i) Running a continuous open traverse along the existing road and<br />

realignments, wherever required to improve geometrics.<br />

(ii) Collection of details for all features such as structures (bridges, culverts,<br />

etc.) utilities, existing roads, electric and telephone installations (both O/H<br />

as well as underground), huts, buildings, fencing, trees, oil and gas lines,<br />

etc. falling within the extent of survey.<br />

3. The width of survey corridor shall be as under:<br />

(i) The topographic surveys shall cover sufficient width beyond the centre line<br />

of the carriageway considering height of the embankment. The width of the<br />

survey corridor shall take into account the existing land width,<br />

realignments, service roads, if any, layout of intersections, extent of<br />

embankment and cut slopes and the general ground profile.<br />

(ii) In case need for bypassing the congested locations is felt and the feasibility<br />

study for the bypass is included in the TOR, preliminary survey would be<br />

carried out along the possible alignments in order to identify and select the<br />

most suitable alignment for the bypass. The final alignment shall be got<br />

approved by the Authority. Further surveys shall be carried out along the<br />

final alignment.<br />

(iii) Where existing roads cross the alignment, the survey shall extend to a<br />

minimum of 100 m on either side of the road centre line and shall be for<br />

sufficient width to allow improvements, including at grade intersection.<br />

4. The important features of the survey conducted and the reference points taken in<br />

consideration like GPS bench mark, temporary and permanent bench marks, etc.<br />

shall be listed in appropriate formats.