Request for proposal for preparation of feasibility report for four laining with paved shoulder of Sidhi to Singrauli (NH-75E)<br />

Key<br />

Date No.<br />

Description of Deliverables Week No £ . Payment<br />

KD1 Inception Report 2 --<br />

KD 2 Report on Alignment (including proposed<br />

geometric improvements) and first traffic survey<br />

KD3 Report on Land Plan Schedules and Utility<br />

Relocation<br />

8 15%<br />

12 10%<br />

KD4 Indicative GAD of structures (bridges, grade 13 10%<br />

separators, ROB/RUBs)<br />

KD5 Report on Environment and Social Impact 14 10%<br />

Assessment<br />

KD6 Draft Feasibility Report and Schedules to the 16 25%<br />

Concession Agreement and financial analysis<br />

KD7 Final Feasibility Report 18 $ 20%<br />

KD8<br />

(a) Project related clerances from concerned 52 10%<br />

departments<br />

(b) Completion of Services including assistance<br />

during Bid Process<br />

Total 100<br />

6.3 In the event that the TOR for the Consultant envisages assistance in the process of<br />

public hearings, etc. in respect of the Environment Impact Assessment (EIA) of the<br />

Project Highway specified in para 3.12 and the process cannot be completed within<br />

the period specified herein for completion of Final Feasibility Report, the EIA<br />

Report may be completed and submitted to the Authority within an extended<br />

period of 6 (six) weeks after submission of the Feasibility Report. A sum equal to<br />

5% (five percent) of the total payment due shall be withheld and paid to the<br />

Consultant upon submission of the EIA Report and environment management plan.<br />

7 Consultancy Team<br />

7.1 The Consultant shall form a multi-disciplinary team (the “Consultancy Team”)<br />

for undertaking this assignment. The following Key Personnel whose experience<br />

and responsibilities are briefly described herein would be considered for evaluation<br />

of the Technical Proposal. Other expertise such as that required for financial<br />

analysis, pavement design, material investigation characterisation, quantity survey,<br />

social impact assessment etc. for the Project highway shall be included in the Team<br />

either by way of Key Personnel or other Professional Personnel, as necessary.<br />

(a) Senior Highway Engineer-cum-Team Leader<br />

(i) Educational Qualifications Graduate in Civil Engineering<br />

(ii) Essential Experience 10 years in planning, project preparation<br />

and design of highway projects.<br />

(iii) Experience in Similar Capacity He should have worked as a Team Leader<br />

for preparation of DPR of 4-lane highway