Request for proposal for preparation of feasibility report for four laining with paved shoulder of Sidhi to Singrauli (NH-75E)<br />
(l)<br />
(m)<br />
(n)<br />
(o)<br />
(p)<br />
(q)<br />
(r)<br />
(s)<br />
(t)<br />
(u)<br />
(v)<br />
(w)<br />
(x)<br />
Provide specific recommendations for low-level bridges. Normally all<br />
bridges are required to be high-level bridges. However, there may be<br />
situations where an existing bridge is in a sound condition but may not be<br />
satisfying the requirement of a high-level bridge. Such structures shall be<br />
examined with a view to stipulating whether they need to be upgraded as<br />
high level bridges, together with reasons therefor. In such cases, construction<br />
of high-level bridges can also be phased out after seven years (Refer para<br />
7.1(ii) of Manual).<br />
Provide a list of utility services which are required to be carried over<br />
structures (Refer para 7.1(vii) of Manual).<br />
Provide a list of culverts to be reconstructed and/or widened (Refer para<br />
7.3(iii)d of Manual).<br />
Provide a list of bridge structures including existing ROBs/RUBs to be<br />
reconstructed and/or widened (Refer para 7.3(iii) of Manual). The possibility<br />
of postponing reconstruction of any bridge for a period of say 7 to 8 years<br />
shall be explored and indicated.<br />
Specifically bring out the requirements of any special structures like cable<br />
stayed or special super structure for any particular bridge on the Project<br />
Highway.<br />
Provide a list of stretches where reinforced earth wall is proposed together<br />
with maximum height of earth wall. Where the height of wall proposed is<br />
more than 6 m, reasons for the same may also be given (Refer para 7.16.1 of<br />
Manual).<br />
Provide a list of existing bridges where railings on them are proposed to be<br />
replaced by crash barriers (Refer para 7.18(iv) of Manual).<br />
Provide a list of existing bridges/culverts where parapets/railings are<br />
proposed to be repaired or replaced (Refer para 7.18(v) of Manual).<br />
Provide a list of railway level crossings which need not be replaced with<br />
ROB/RUB (Refer para 7.19 of Manual).<br />
Provide a list of structures under marine environment (Refer para 7.22 of<br />
Manual).<br />
Provide a list of existing bridges/culverts where repairs/strengthening is<br />
proposed together with nature and extent of repairs (Refer para 7.23(i) of<br />
Manual).<br />
Indicate specifications for reflecting sheeting for road signs whether High<br />
Intensity Grade with encapsulated lens or Microprismatic retro-reflective<br />
element material (Refer para 9.3.1. of Manual).<br />
Indicate proposed location of toll plazas on the Project Highway (Refer paras<br />
10.2 and 10.3 of Manual).