Request for proposal for preparation of feasibility report for four laining with paved shoulder of Sidhi to Singrauli (NH-75E)<br />

(l)<br />

(m)<br />

(n)<br />

(o)<br />

(p)<br />

(q)<br />

(r)<br />

(s)<br />

(t)<br />

(u)<br />

(v)<br />

(w)<br />

(x)<br />

Provide specific recommendations for low-level bridges. Normally all<br />

bridges are required to be high-level bridges. However, there may be<br />

situations where an existing bridge is in a sound condition but may not be<br />

satisfying the requirement of a high-level bridge. Such structures shall be<br />

examined with a view to stipulating whether they need to be upgraded as<br />

high level bridges, together with reasons therefor. In such cases, construction<br />

of high-level bridges can also be phased out after seven years (Refer para<br />

7.1(ii) of Manual).<br />

Provide a list of utility services which are required to be carried over<br />

structures (Refer para 7.1(vii) of Manual).<br />

Provide a list of culverts to be reconstructed and/or widened (Refer para<br />

7.3(iii)d of Manual).<br />

Provide a list of bridge structures including existing ROBs/RUBs to be<br />

reconstructed and/or widened (Refer para 7.3(iii) of Manual). The possibility<br />

of postponing reconstruction of any bridge for a period of say 7 to 8 years<br />

shall be explored and indicated.<br />

Specifically bring out the requirements of any special structures like cable<br />

stayed or special super structure for any particular bridge on the Project<br />

Highway.<br />

Provide a list of stretches where reinforced earth wall is proposed together<br />

with maximum height of earth wall. Where the height of wall proposed is<br />

more than 6 m, reasons for the same may also be given (Refer para 7.16.1 of<br />

Manual).<br />

Provide a list of existing bridges where railings on them are proposed to be<br />

replaced by crash barriers (Refer para 7.18(iv) of Manual).<br />

Provide a list of existing bridges/culverts where parapets/railings are<br />

proposed to be repaired or replaced (Refer para 7.18(v) of Manual).<br />

Provide a list of railway level crossings which need not be replaced with<br />

ROB/RUB (Refer para 7.19 of Manual).<br />

Provide a list of structures under marine environment (Refer para 7.22 of<br />

Manual).<br />

Provide a list of existing bridges/culverts where repairs/strengthening is<br />

proposed together with nature and extent of repairs (Refer para 7.23(i) of<br />

Manual).<br />

Indicate specifications for reflecting sheeting for road signs whether High<br />

Intensity Grade with encapsulated lens or Microprismatic retro-reflective<br />

element material (Refer para 9.3.1. of Manual).<br />

Indicate proposed location of toll plazas on the Project Highway (Refer paras<br />

10.2 and 10.3 of Manual).