Request for proposal for preparation of feasibility report for four laining with paved shoulder of Sidhi to Singrauli (NH-75E)<br />
(b)<br />
Preliminary Cost Estimate for construction of Project Highway.<br />
(c) Total Project Cost (Refer paras 3.14 and 3.15).<br />
(5) Implementation schedule<br />
(a)<br />
(b)<br />
Construction period.<br />
Likely delays, if any, on account of land acquisition.<br />
H. Schedules of Concession Agreement<br />
The Consultant shall separately provide Schedules A, B, C, D and H of the<br />
Concession Agreement for the Project Highway with all supporting documentation<br />
relating to these Schedules. (See Appendix I of the Manual). Explanation of the<br />
specific requirements for the Project Highway is given in para 5 below.<br />
I. Financial analysis<br />
A preliminary financial assessment of the Project indicating the likely IRR for a 10<br />
(ten) year, 15 (fifteen) year, 20 (twenty) year and 25 (twenty five) year concession<br />
period respectively (Refer para 3.15).<br />
The Consultant shall, based on the assumptions specified in paragraph 3.15,<br />
indicate the likely viability gap funding for the project. In case the viability gap<br />
funding projected in the Feasibility Report exceeds the projection in the Inception<br />
Report by more than 10% (ten per cent) of the capital costs, a deduction of 10%<br />
(ten per cent) of the Agreement Value shall be made from the payment due to the<br />
Consultant. Such deduction shall be deemed to be mutually agreed genuine preestimated<br />
compensation and damages suffered by the Authority on account of<br />
inaccurate projections leading to higher costs.<br />
J. Assistance during bid process<br />
The Consultant shall provide the required assistance to the financial consultant and<br />
the legal adviser in preparation of bid documents. The Consultant shall also<br />
participate in Pre-bid Conferences and assist in preparation of answers to the<br />
Bidders’ queries on technical aspects of the Project Highway and Bid Documents.<br />
5. Specific requirements for the Project Highway<br />
For preparing Schedules A, B, C, D and H of the Concession Agreement and other<br />
specific requirements (refer Appendix-I of the Manual), the Consultant shall:<br />
(a)<br />
(b)<br />
Provide utility wise preliminary plans for shifting of existing utilities and<br />
construction of new utilities along or across the Project Highway.<br />
Based on the Consultant’s assessment of the time period until which sixlaning<br />
of the Project Highway may not be required, the Consultant shall<br />
identify and indicate the list of stretches/sections where six-laning need not<br />
be provided by the Concessionaire even when traffic actually exceeds the<br />
specified design service volume for a 4-lane highway.