Request for proposal for preparation of feasibility report for four laining with paved shoulder of Sidhi to Singrauli (NH-75E)<br />

(a)<br />

(b)<br />

An Index Plan of the Project Highway<br />

Plans, L-sections, and typical cross-sections showing the existing<br />

features within the ROW (e.g. carriageway, structures, drains, crash<br />

barriers, service roads, utilities, adjoining land use, intersecting<br />

roads/access roads, road side developments etc.) with the proposed<br />

improvements marked thereon (e.g. raising of embankment,<br />

widening of embankment, location of median, placement of new<br />

carriageway, geometric improvements, widening or reconstruction<br />

of structures, new subways/underpasses/grade separators, service<br />

roads, arrangements for merging/diverging, traffic circulation,<br />

relocation of utilities, etc.) (Refer para 3.3.2).<br />

(2) Investigation Reports<br />

(a) Report on traffic survey and demand assessment (Refer para 3.2).<br />

(b) Inventory survey report (Refer para 3.3.3).<br />

(c)<br />

<strong>Road</strong> and bridge condition survey report (Refer paras 3.3.4 and<br />

3.3.5).<br />

(d) Soil, geotechnical and drainage report (Refer para 3.3.6).<br />

(3) Preliminary designs<br />

Preliminary designs of the Project Highway including service roads,<br />

consistent with the existing facility and the additional requirements<br />

including:<br />

(a)<br />

Traffic and toll forecasting for 10 (ten), 15 (fifteen), 20 (twenty) and<br />

25 (twenty five) years.<br />

(b) Preliminary pavement design for new carriageway and<br />

strengthening of existing carriageway along with typical crosssections.<br />

(c)<br />

(d)<br />

(e)<br />

Options for retention of existing bridges and other structures or their<br />

replacement by new structures together with preliminary design. For<br />

new bridges, the length from abutment to abutment shall not be less<br />

than the length of the existing bridge and foundations need not be<br />

above the existing foundations unless soil conditions justify<br />

otherwise.<br />

Preliminary drainage assessment.<br />

Preliminary layout of inter-sections, grade separators and interchanges<br />

with ramps.<br />

(4) Preliminary costing<br />

(a)<br />

Indicative BOQ.