Request for proposal for preparation of feasibility report for four laining with paved shoulder of Sidhi to Singrauli (NH-75E)<br />

(iv)<br />

(v)<br />

structures requiring widening (for such structures indicate widening<br />

methodology);<br />

structures that shall be retained.<br />

3.3.6 Soil, geotechnical, material, hydrology and drainage surveys<br />

The activities and deliverables forming part of the soil, geotechnical, material,<br />

hydrology and drainage surveys are described below:<br />

(a)<br />

The characteristics of the existing soil, two samples from every five km of<br />

the Project Highway or closer where change in soil type is encountered.<br />

(b) The determination of subgrade CBR (soaked) every three km of the Project<br />

Highway or closer where change in soil type is encountered.<br />

(c ) Benkleman Beam Deflection measurements on the Project Highway – one set<br />

of ten readings in 250 m for every three km of the Project Highway.<br />

(d) Investigations of the subsoil strata (one trial bore and/or test pit at embankment<br />

and one in river bed at locations where new bridges or other structures are<br />

proposed. The depth of trial bore/ test pit shall be as per IRC standards).<br />

(e) Preliminary hydraulic data for bridges, design discharge, HFL, LWL, etc. with<br />

a view to checking adequacy of existing waterway.<br />

(f) A broad assessment of the drainage condition and requirement of the Project<br />

Highway.<br />

3.4 Proposal for Sections passing through urban areas<br />

(a)<br />

(b)<br />

The task at 3.3.2(c) would identify the stretches of the Project Highway<br />

which pass through the urban areas. For each of these stretches, the<br />

Consultant shall prepare an improvement plan of the stretch to provide a<br />

four-lane divided carriageway with footpaths, covered drains, etc.<br />

Possibility of providing service roads shall also be explored and indicated.<br />

If there is any constraint due to available ROW or additional land to be<br />

acquired, the same shall be brought to the attention of the Authority on<br />

immediate basis. In such situations, a bypass may be needed to avoid the<br />

urban area. The surveys and investigations for the alignment and other<br />

features of the bypass are also a part of this Consultancy.<br />

Bypasses:- Construction of bypasses should be identified on the basis of<br />

data derived from reconnaissance and traffic studies. The available<br />

alignment options should worked out on the basis of available maps. The