Request for proposal for preparation of feasibility report for four laining with paved shoulder of Sidhi to Singrauli (NH-75E)<br />

alongwith their brief description shall also be prepared and included in the<br />

Feasibility Report.<br />

(i)<br />

(j)<br />

For additional land proposed to be acquired as per final alignment plan of<br />

the Project Highway, the Land Plans shall be marked on duly certified<br />

village maps showing khasra numbers and shall be furnished along with a<br />

report which will include detailed schedules in respect of the proposed<br />

acquisition of land holdings as per revenue records in a format that would<br />

enable the Authority to initiate land acquisition proceedings.<br />

A set of cross-sections of the existing road including urban sections at one<br />

km intervals for each homogeneous section in plain/rolling terrain and at<br />

100 m intervals in mountainous/steep terrain shall be provided by the<br />

Consultant. In plain/ rolling terrain, additional cross-sections shall be<br />

provided for curves at the start, at the middle and at the end. These crosssections<br />

along with proposed improvement plan and preliminary design<br />

shall form the basis of preparation of indicative BOQ for the Project<br />

Highway.<br />

3.3.3 <strong>Road</strong> inventory survey<br />

Deliverables under this component shall include:<br />

(a)<br />

An inventory of road, culverts, bridges and other structures like railway<br />

over/underbridges, flyovers (grade separated structures), underpasses and<br />

overpasses.<br />

The proformae for road, culverts and bridges or other structures have been<br />

provided at Proforma – 1, 2 and 3 respectively .<br />

(b) Identification of stretches of the Project Highway which -<br />

(i)<br />

(ii)<br />

(iii)<br />

(iv)<br />

(v)<br />

are affected by frequent flooding;<br />

are subjected to water logging;<br />

pass through black cotton soil area;<br />

pass through marshy area; or<br />

pass through weak soil stratum<br />

(c)<br />

(d)<br />

Typical cross-sections of the existing road showing the crust composition<br />

of pavement, shoulders and drains (one cross-section for every five km of<br />

the road).<br />

Identification of sections in cutting.