16.01.2015 Views

performed by an installer with LonWorks engineering ... - PNet - Trend

performed by an installer with LonWorks engineering ... - PNet - Trend

performed by an installer with LonWorks engineering ... - PNet - Trend

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

! 8 = <br />

!<br />

) <br />

5 JH= JA C O<br />

1,<br />

5 A HE= <br />

! " # $ %<br />

5 4 8<br />

! " # 2 1<br />

" 8 = <br />

+ + <br />

+<br />

<br />

<br />

" # $ % & ' ! " # $ % & ' ! " # $ % &<br />

5<br />

' ! ! !<br />

<br />

) <br />

5<br />

5 JH= JA C O<br />

1,<br />

5 A HE= <br />

! " # $ %<br />

5 4 8<br />

! 8 = <br />

! " # 2 1<br />

<br />

" 8 = <br />

" 8<br />

+ + <br />

" 8<br />

+<br />

<br />

<br />

! " # $ % & ' ! " # $ % & ' ! " # $ % &<br />

' ! ! !<br />

Installation Instructions<br />

IQL13+/xxx<br />

LonMark Terminal Unit Controllers<br />

Import<strong>an</strong>t: Retain these instructions<br />

CONTENTS<br />

1 Unpacking .................................................... 1<br />

2 Storage ......................................................... 1<br />

3 Installation - Mounting .................................. 1<br />

4 Installation - Configuration .......................... 6<br />

5 Disposal ...................................................... 12<br />

1 Unpacking<br />

IQL13+/xxx<br />

Installation Instructions<br />

TG200383<br />

2 Storage<br />

-10 °C<br />

(14 °F)<br />

+50 °C<br />

(122 °F)<br />

0 <br />

3 Installation - Mount ing<br />

0<br />

90 %RH<br />

It is recommended that the<br />

installation should comply <strong>with</strong><br />

the HSE Memor<strong>an</strong>dum of<br />

Guid<strong>an</strong>ce on Electricity at Work<br />

Regulations 1989.<br />

For USA install equipment in<br />

accord<strong>an</strong>ce <strong>with</strong> National Electric Code.<br />

!<br />

Note that this product may involve Lonworks system integration<br />

as referred to in section 4 step 4: this procedure should only be<br />

<strong>performed</strong> <strong>by</strong> <strong>an</strong> <strong>installer</strong> <strong>with</strong> <strong>LonWorks</strong> <strong>engineering</strong> expertise.<br />

1<br />

Dimensions<br />

205 mm (8.07”)<br />

a<br />

2<br />

Requirements<br />

b<br />

! <br />

<br />

" 8<br />

" 8<br />

<br />

<br />

129 mm (5.08”)<br />

! <br />

75 mm (3”)<br />

63 mm (2.48”)<br />

IQL13+/xxx Installation Instructions TG200383 Issue 3/C 06/09/07 1


! <br />

! <br />

<br />

! 8 = <br />

+<br />

!<br />

<br />

! 8 = <br />

+<br />

!<br />

) <br />

5 JH= JA C O<br />

1,<br />

5 A HE= <br />

! " # $ % ! " #<br />

" 8 = <br />

" 8 " 8<br />

+ <br />

+<br />

" # $ % & ' ! " # $ % & ' ! " # $ % &<br />

5<br />

<br />

) <br />

5 JH= JA C O<br />

1,<br />

5 A HE= <br />

! " # $ % ! " #<br />

" 8 = <br />

" 8 " 8<br />

+ <br />

+<br />

" # $ % & ' ! " # $ % & ' ! " # $ % &<br />

5 4 8<br />

2 1<br />

<br />

<br />

<br />

' ! ! !<br />

5<br />

<br />

5 4 8<br />

2 1<br />

<br />

<br />

<br />

' ! ! !<br />

! 8 = <br />

!<br />

! 8 = <br />

!<br />

! " # $ %<br />

" 8 = <br />

" 8 " 8<br />

" # $ % & ' ! " # $ % & ' <br />

) <br />

5 JH= JA C O<br />

1,<br />

5 A HE= <br />

<br />

! " #<br />

+ + <br />

+<br />

! " # $ % &<br />

) <br />

5<br />

5 JH= JA C O<br />

1,<br />

5 A HE= <br />

! " # $ %<br />

5 4 8<br />

! " # 2 1<br />

<br />

" 8 = <br />

" 8<br />

+ + <br />

" 8<br />

+<br />

<br />

<br />

" # $ % & ' ! " # $ % & ' ! " # $ % &<br />

' ! ! !<br />

5<br />

5 4 8<br />

2 1<br />

<br />

<br />

<br />

' ! ! !<br />

! <br />

<br />

! 8 = <br />

+<br />

!<br />

) <br />

5 JH= JA C O<br />

1,<br />

5 A HE= <br />

! " # $ % ! " #<br />

" 8 = <br />

" 8 " 8<br />

+ <br />

+<br />

" # $ % & ' ! " # $ % & ' ! " # $ % &<br />

5<br />

<br />

5 4 8<br />

2 1<br />

<br />

<br />

<br />

' ! ! !<br />

! 8 = <br />

!<br />

" 8 = <br />

! " # $ %<br />

" # $ % & ' ! " # $ % & ' <br />

! 8 = <br />

!<br />

" 8<br />

" 8<br />

) <br />

5 JH= JA C O<br />

1,<br />

5 A HE= <br />

! " #<br />

<br />

+ <br />

+ <br />

! " # $ % &<br />

+<br />

5<br />

5 4 8<br />

2 1<br />

<br />

<br />

<br />

' ! ! !<br />

) <br />

5<br />

5 JH= JA C O<br />

1,<br />

5 A HE= <br />

! " # $ %<br />

5 4 8<br />

! " # 2 1<br />

<br />

" 8 = <br />

" 8<br />

+ + <br />

" 8<br />

+<br />

<br />

<br />

" # $ % & ' ! " # $ % & ' ! " # $ % &<br />

' ! ! !<br />

IQL13+/xxx<br />

Installation Instructions<br />

3 Installation - Mounting (continued)<br />

c<br />

2<br />

Requirements (continued)<br />

d<br />

! <br />

If not installed well outside<br />

normal reach (e.g behind false<br />

ceiling)<br />

<br />

e<br />

0 <br />

0 °C<br />

(32 °F)<br />

0<br />

+45 °C<br />

(113 °F)<br />

90 %RH<br />

Protection: IP20, NEMA 1<br />

f<br />

Avoid locations where corrosive<br />

fumes or explosive vapours are<br />

present. Avoid electrical noise<br />

interference<br />

3<br />

Mounting<br />

189 mm (7.44”)<br />

4 holes<br />

! <br />

either surface mount<br />

114 mm<br />

(4.49”)<br />

<br />

<br />

or DIN rail mount<br />

∅ 6 mm<br />

(0.24”)<br />

a b c d<br />

! <br />

<br />

<br />

! <br />

<br />

<br />

4<br />

Lift Hinged Cover<br />

b<br />

c<br />

a<br />

WARNING: Failure to use a screwdriver<br />

to open the cover will cause damage to<br />

the unit.<br />

2<br />

IQL13+/xxx Installation Instructions TG200383 Issue 3/C 06/09/07


) <br />

5 JH= JA C O<br />

1,<br />

5<br />

) <br />

5 JH= JA C O<br />

1,<br />

5<br />

Installation Instructions<br />

IQL13+/xxx<br />

3 Installation - Mounting (continued)<br />

5<br />

Connect Power<br />

/24VAC option<br />

IQL consumption<br />


) <br />

5 JH= JA C O<br />

1,<br />

5<br />

IQL13+/xxx<br />

Installation Instructions<br />

3 Installation - Mounting (continued)<br />

6<br />

LINC<br />

IQ Outstations<br />

Connect <strong>LonWorks</strong> Bus (continued)<br />

IQL<br />

LINC<br />

LonMark<br />

Device<br />

IQ Outstation<br />

Lonworks bus<br />

Normal IQ System current loop L<strong>an</strong> cable is not<br />

recommended<br />

Do not use screened cable<br />

Cable<br />

Max<br />

bus length<br />

Max node to node<br />

B elden 85102 500<br />

m (545 yds)<br />

500 m (545 yds)<br />

IQ system<br />

TP/1/0/16/HF/200 500<br />

m (545 yds) 400 m (430 yds)<br />

(Belden 8471)<br />

U L Level IV, 22 AWG 500<br />

m (545 yds)<br />

400 m (430 yds)<br />

J Y(St) Y2 x 2 x 0.8 500<br />

m (545 yds)<br />

320 m (350 yds)<br />

TIA5268A Cat. 5,<br />

24 AWG<br />

450<br />

m (490 yds) 250 m (270 yds)<br />

Terminal size 0.5 to 2.5 mm 2 (14 to 20 AWG)<br />

If used <strong>with</strong> LPT-10 (powered bus), cable lengths differ - see “Link Power Tr<strong>an</strong>sceiver<br />

User’s Guide (078-0105-01C)”.<br />

Connect Inputs <strong>an</strong>d Outputs<br />

7 If non st<strong>an</strong>dard strategy, follow<br />

special installation instructions <strong>an</strong>d<br />

jump to step 12<br />

Non-st<strong>an</strong>dard Strategy<br />

Installation Instructions<br />

8<br />

! " #<br />

+ + <br />

+<br />

Connect Inputs<br />

Terminal size 0.5 to<br />

2.55 mm 2 (14 to<br />

20 AWG)<br />

! <br />

<br />

<br />

Sensors TB/TS, TB/TS/K, TB/TS/KE, TB/TS/KEF<br />

recommended; wire as shown below.<br />

<br />

! " # $ % &<br />

! " #<br />

<br />

+ <br />

+ <br />

! " # $ % &<br />

2 1 3 6 5 4<br />

TB/TS /K /F /E<br />

Room Display Module (RD-IQL/K, /KOS,<br />

/KOSF) provides monitor <strong>an</strong>d control; wired<br />

as shown below:<br />

polarity<br />

independent<br />

Note that the IQL must be<br />

correctly set up to use the<br />

RD-IQL, see section 4 step 13<br />

+<br />

"<br />

+<br />

$ %<br />

RD-IQL<br />

Note that terminal types COM <strong>an</strong>d C should<br />

not be connected together<br />

Local<br />

Space<br />

Temperature<br />

Sensor<br />

Auto<br />

Local Setpoint<br />

Adjust<br />

Potentiometer<br />

Off<br />

F<strong>an</strong> Speed Select<br />

T<br />

Pushbutton<br />

or PIR input<br />

ΔT<br />

Window or<br />

Alarm<br />

contact<br />

Pushbutton or PIR<br />

input type selected<br />

<strong>by</strong> configuration<br />

parameter W6<br />

PIR<br />

PIR<br />

T B/TS ! " " " / "<br />

T B/TS/K ! ! " " / "<br />

T B/TS/KE ! ! ! " / "<br />

T B/TS/KEF ! ! ! ! / "<br />

R D/IQL/K !S ! / " / "<br />

R D/IQL/KOS !S ! ! " / "<br />

R D/IQL/KOSF !S ! ! !S / "<br />

input included in TB or RD<br />

S separate input may be used<br />

/ Input either c<strong>an</strong>not be connected, or will be ignored<br />

Connection of separate device to input required<br />

4<br />

IQL13+/xxx Installation Instructions TG200383 Issue 3/C 06/09/07


) <br />

5 JH= JA C O<br />

1,<br />

5<br />

) <br />

5 JH= JA C O<br />

1,<br />

5<br />

Installation Instructions<br />

IQL13+/xxx<br />

3 Installation - Mounting (continued)<br />

9<br />

Connect Heat/Cool Outputs<br />

(24 Vac, 400 mA maximum shared between 24 Vac<br />

auxiliary output <strong>an</strong>d all triac outputs used)<br />

! <br />

<br />

<br />

/AR2 /WR2 /WR4 /WT2 /WT4<br />

" # $ %<br />

< " 8 < " 8<br />

" # $ %<br />

< " 8 < " 8<br />

" # $ %<br />

< " 8 < " 8<br />

" # $ %<br />

< " 8 < " 8<br />

" # $ %<br />

< " 8 < " 8<br />

# $ % & ' <br />

# $ % & ' <br />

# $ % & ' <br />

# $ % & ' <br />

# $ % & ' <br />

Raise<br />

Common<br />

Lower<br />

Heat/Cool<br />

Damper<br />

not used<br />

Raise<br />

Common<br />

Lower<br />

Heat or Cool<br />

Valve<br />

not used<br />

Raise<br />

Common<br />

Lower<br />

Raise<br />

Common<br />

Lower<br />

Heat Valve Cool Valve<br />

Heat or Cool<br />

Valve<br />

not used<br />

Heat Valve Cool Valve<br />

terminal size 0.5 to 2.5 mm 2 (14 to 20 AWG)<br />

10<br />

Connect F<strong>an</strong> Outputs<br />

5 A maximum @240 Vac resistive or inductive (cosø>=0.4)<br />

5A @ 30 Vdc (resistive), 2 A @ 24 Vdc (inductive, T


! 8 = <br />

!<br />

) <br />

5<br />

5 JH= JA C O<br />

1,<br />

5 A HE= <br />

! " # $ %<br />

5 4 8<br />

! " # 2 1<br />

<br />

" 8 = <br />

" 8<br />

+ + <br />

" 8<br />

+<br />

<br />

<br />

" # $ % & ' ! " # $ % & ' ! " # $ % &<br />

' ! ! !<br />

) <br />

5 JH= JA C O<br />

1,<br />

5 A HE= <br />

5<br />

) <br />

5 JH= JA C O<br />

1,<br />

5<br />

1, ) # ! $ # ) <br />

5 A HE= 13 N 9 4 " # # 5<br />

IQL13+/xxx<br />

Installation Instructions<br />

3 Installation - Mounting (continued)<br />

11<br />

Connect 24 Vac Auxiliary<br />

Output<br />

12<br />

a<br />

Close Hinged Cover<br />

&<br />

" 8 = <br />

! <br />

<br />

<br />

" #<br />

400 mA maximum shared<br />

between 24 Vac Auxiliary output<br />

<strong>an</strong>d all triac outputs used.<br />

b<br />

Load<br />

terminal size 0.5 to 2.5 mm 2<br />

(14 to 20 AWG)<br />

4 Installation - Configuration<br />

1<br />

Tear off Label Strip<br />

‘locate’<br />

2<br />

Switch On<br />

! <br />

<br />

1, 00:A0:25:36:51:00<br />

5 A HE= <br />

IQL1xWR4_50100025<br />

) 117 5 027<br />

5 JH= JA C O IQL1x WR4 E 06<br />

1, 00:A0:25:36:51:00<br />

5 A HE= IQL1xWR4_50100025<br />

<br />

1<br />

3<br />

Check IQL/LINC on <strong>LonWorks</strong><br />

IQL<br />

LonMark<br />

Device<br />

Lonworks bus<br />

LINC<br />

LINC<br />

! <br />

<br />

<br />

LON OK (green)<br />

IQ Outstations<br />

IQ Outstation<br />

Flashes every 24 s, ON after 1½ mins<br />

Flashes every 1 s (Deaf IQL. Check <strong>LonWorks</strong>)<br />

(Check <strong>LonWorks</strong>, LINCs)<br />

6<br />

IQL13+/xxx Installation Instructions TG200383 Issue 3/C 06/09/07


) <br />

5 JH= JA C O<br />

1,<br />

5 A HE= <br />

5<br />

Installation Instructions<br />

IQL13+/xxx<br />

4 Installation - Configuration (continued)<br />

Install using <strong>LonWorks</strong> Network M<strong>an</strong>ager Tool<br />

4 If a binding IQLs to LonMark devices<br />

or b LINCs version


) <br />

5 JH= JA C O<br />

1,<br />

5 A HE= <br />

5<br />

IQL13+/xxx<br />

Installation Instructions<br />

4 Installation - Configuration (continued)<br />

7<br />

Test input/output functionality<br />

If non st<strong>an</strong>dard strategy follow special installation instructions <strong>an</strong>d jump to step 14.<br />

Non-st<strong>an</strong>dard Strategy Installation Instructions<br />

8<br />

Check Strategy, Sensor/F<strong>an</strong>/Heat Cool Outputs/Electric Heater<br />

! <br />

<br />

<br />

IN1<br />

6<br />

S<br />

OUT1<br />

heat<br />

<br />

<br />

cool<br />

<br />

S<br />

<br />

heat<br />

<br />

<br />

/ AR2 / WR2<br />

/ WR4<br />

/ WT2<br />

/WT4<br />

OUT4,5<br />

OUT4,5 OUT4,5 OUT4<br />

If W2=0<br />

If W2=0<br />

OUT4<br />

damper (Winter Mode)<br />

heat valve<br />

(Winter Mode) heat valve<br />

heating<br />

heating<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

cool<br />

<br />

OUT4,5<br />

damper<br />

OUT4,5<br />

If W2=1<br />

(Summer Mode)<br />

cooling<br />

OUT6,7<br />

cool valve<br />

OUT4<br />

If W2=1<br />

(Summer Mode)<br />

cooling<br />

OUT6<br />

cool valve<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

8<br />

IQL13+/xxx Installation Instructions TG200383 Issue 3/C 06/09/07


) <br />

5 JH= JA C O<br />

1,<br />

5 A HE= <br />

5<br />

) <br />

5 JH= JA C O<br />

1,<br />

5 A HE= <br />

) <br />

5 JH= JA C O<br />

1,<br />

5 A HE= <br />

5<br />

5<br />

Installation Instructions<br />

IQL13+/xxx<br />

4 Installation - Configuration (continued)<br />

9<br />

Check Operation - Window Contact Input<br />

! <br />

<br />

if Window Mode (W5=1)<br />

<br />

Window<br />

IN5<br />

OUT1, 2, 3<br />

<br />

<br />

<br />

heat<br />

cool<br />

f<strong>an</strong> off<br />

<br />

<br />

<br />

heat<br />

/ AR2 / WR2<br />

/ WR4<br />

/ WT2<br />

/WT4<br />

OUT4,5<br />

OUT4<br />

OUT4,5 OUT4,5 heat valve OUT4 heat valve<br />

damper<br />

<br />

<br />

<br />

<br />

<br />

<br />

cool<br />

damper goes to<br />

neutral<br />

<br />

valve closes<br />

<br />

OUT6,7<br />

cool valve<br />

<br />

valve closes<br />

<br />

OUT6<br />

cool valve<br />

<br />

<br />

<br />

<br />

10<br />

Check Operation<br />

- Pushbutton or PIR Input<br />

11<br />

Check Operation<br />

- Local SP Adjust<br />

! <br />

! <br />

<br />

<br />

If F<strong>an</strong> Speed Auto<br />

<br />

<br />

PIR if in<br />

st<strong>an</strong>d<strong>by</strong><br />

Pushbutton<br />

if non-occupied<br />

or st<strong>an</strong>d<strong>by</strong><br />

IN4 OUT1, 2, 3<br />

f<strong>an</strong> on<br />

see table<br />

step 8<br />

Pb/PIR input type selected<br />

<strong>by</strong> configuration parameter<br />

W6 - see step 13.<br />

Pushbutton c<strong>an</strong> be provided <strong>by</strong> TB/TS/KE, /KEF,<br />

or RD-IQL/KOS, /KOSF (see section 3 step 8)<br />

IN2<br />

OUT1, 2, 3<br />

heat<br />

cool<br />

If F<strong>an</strong> Speed Auto<br />

Local adjustment c<strong>an</strong> be provided <strong>by</strong> TB/TS/K,<br />

/KE, /KEF or RD-IQL/K, /KOS, /KOSF (see<br />

section 3 step 8).<br />

Wait 6 secs at each end to calibrate<br />

potentiometer<br />

<br />

<br />

<br />

<br />

see table<br />

step 8<br />

IQL13+/xxx Installation Instructions TG200383 Issue 3/C 06/09/07 9


) <br />

5 JH= JA C O<br />

1,<br />

5 A HE= <br />

5<br />

IQL13+/xxx<br />

Installation Instructions<br />

4 Installation - Configuration (continued)<br />

12<br />

Check Operation - F<strong>an</strong> Speed Select<br />

IN3<br />

) K J<br />

OUT1, 2, 3<br />

! <br />

<br />

<br />

BB<br />

If Occupied <strong>an</strong>d Remote F<strong>an</strong> Speed (K7) Auto<br />

F<strong>an</strong> Speed Switch c<strong>an</strong> be provided <strong>by</strong> TB/TS/KEF or<br />

RD-IQL/KOSF (see section 3 step 8)<br />

Set up Strategy Parameters<br />

13 if required<br />

Use IqlTool2 (see step 5 ) <strong>an</strong>d text communications<br />

For st<strong>an</strong>dard strategies use table below, else refer<br />

to non-st<strong>an</strong>dard strategy installation instructions<br />

Parameter<br />

K1(V)<br />

K2(V)<br />

K3(V)<br />

K4(V)<br />

K5(V)<br />

K6(V)<br />

K7(V)<br />

K8(V)<br />

Label<br />

Remote<br />

Setpoint<br />

RemoteSpaceTemp<br />

OCC Deadbnd<br />

St<strong>an</strong>d<strong>by</strong><br />

Deadbnd<br />

NOCC Deadbnd<br />

Remote<br />

Occ<br />

Remote<br />

F<strong>an</strong> Spd<br />

Remote<br />

SP Offset<br />

Function<br />

Base<br />

setpoint c<strong>an</strong> be adjusted remotely<br />

Used<br />

if bound to Lon sensor, or if local sensor disconnected<br />

Deadb<strong>an</strong>d<br />

around setpoint during Occ<br />

Deadb<strong>an</strong>d<br />

around setpoint during St<strong>an</strong>d<strong>by</strong><br />

Deadb<strong>an</strong>d<br />

around setpoint during Nocc<br />

Sets<br />

state 0=Occ, 1=Nocc, 2=Bypass, 3=St<strong>an</strong>d<strong>by</strong><br />

Sets<br />

speed 0=off, 1=Low, 2=Med, 3=High, 4=Auto<br />

Used<br />

if bound to a Lon Sensor or if local adjust is disconnected<br />

Default<br />

20 ° C<br />

20 ° C<br />

1 ° C<br />

2 ° C<br />

12 ° C<br />

0=Occupied<br />

4=Auto<br />

0 ° C<br />

K15(V)<br />

W1(S)<br />

W2(S)<br />

W3(S)<br />

W4(S)<br />

W5(S)<br />

W6(S)<br />

W7(S)<br />

W8(S)<br />

L1(G)<br />

L1(I)<br />

L2(G)<br />

L2(I)<br />

O ffset r<strong>an</strong>ge<br />

Defines<br />

r<strong>an</strong>ge of Local SP adjust pot.<br />

2 ° C<br />

O =4Pipe I=2Pipe<br />

S trategy ch<strong>an</strong>ge W1=O (WR4, WT4, AR2) W1=I (WR2, WT2)<br />

*<br />

S ummer Mode<br />

Winter<br />

(heat only) or Summer (cool only) (only used for /WR2, /WT2)<br />

O=Winter<br />

Elec<br />

Disable<br />

=Water I=Air<br />

Window mode<br />

O=Pb<br />

I=PIR<br />

Frost<br />

Condition<br />

Remote<br />

Shutdown<br />

eat Loop Gain<br />

Heat<br />

Loop Integral<br />

ool Loop Gain<br />

Cool<br />

Loop Integral<br />

Disable<br />

Electric Heater if set to I<br />

trategy ch<strong>an</strong>ge W4=O (WR, WT) W4=I (AR<br />

Window contact if set to I, alarm contact if set to O<br />

PIR if set to I, Pushbutton if set to O<br />

Overrides<br />

heating to 98 % (not /AR2) if unoccupied<br />

Shuts<br />

off f<strong>an</strong>, <strong>an</strong>d sets heat/cool to zero<br />

O S )<br />

*<br />

H 0<br />

C 0<br />

O=enable Elec<br />

O=alarm contact<br />

O=pushbutton<br />

O=no frost<br />

O=no shutdown<br />

4<br />

0 mins<br />

-4<br />

0 mins<br />

Note that <strong>an</strong>y ch<strong>an</strong>ges to the strategy parameters should immediately be followed <strong>by</strong> a write to the address<br />

module, [text comms comm<strong>an</strong>d, R(z=0), recommended], to commit ch<strong>an</strong>ges to flash memory.<br />

* Default depends on strategy<br />

If used <strong>with</strong> RD-IQL (see section 3 step 8), the following must be configured: Local Space Temp<br />

Type S9(Y=6), Local SP Adjust Type S10(Y=6), Local F<strong>an</strong> Speed Type S11(Y=6), O=Pb I=PIR<br />

W6(S=O) default, Remote F<strong>an</strong> Spd K7(V=4) default, followed <strong>by</strong> R(z=1) to write ch<strong>an</strong>ges to flash<br />

<strong>an</strong>d reset. Configuration for RD-IQL is facilitated <strong>by</strong> IqlTool2.<br />

If the sensor on IN1 is to be used, leave Local Space Temp type at default, S9(Y=1). If the f<strong>an</strong> speed<br />

switch on IN3 is to be used, leave Local F<strong>an</strong> Speed type at default, S11(Y=3).<br />

If required the strategy type may be ch<strong>an</strong>ged (e.g. /AR2 to /WR2):<br />

IQL13+/xxx data<br />

sheet TA200284<br />

Note that for AR2, WR2, WR4 strategies D2 <strong>an</strong>d D3 full scale drive times should not be greater th<strong>an</strong> 262s.<br />

10<br />

IQL13+/xxx Installation Instructions TG200383 Issue 3/C 06/09/07


Installation Instructions<br />

IQL13+/xxx<br />

4 Installation - Configuration (continued)<br />

14<br />

Set up System Core Firmware Module Parameters<br />

if required - see conditions<br />

Using IqlTool2 (see step 5) <strong>an</strong>d text communications<br />

Parameter<br />

Setting<br />

Function<br />

Condition<br />

Note<br />

R(..address<br />

L - own address<br />

device<br />

address of IQL<br />

if required to rearr<strong>an</strong>ge<br />

L<strong>an</strong>s, address<br />

1, 2,<br />

4<br />

N - own LaN<br />

L<strong>an</strong><br />

number of IQL<br />

if required to rearr<strong>an</strong>ge<br />

1, 2<br />

L<strong>an</strong>s, address<br />

D - identifier<br />

identifier<br />

attribute of IQL<br />

For alarm ident, text<br />

1<br />

comms, IC comms<br />

F - attribute 2<br />

text<br />

comms attributes<br />

For<br />

text comms, IC comms<br />

1<br />

G - attribute 3<br />

1<br />

A - own L<strong>an</strong> alarm address<br />

address <strong>an</strong>d L<strong>an</strong> of own<br />

to report L<strong>an</strong> alarms to a 1<br />

R - Own L<strong>an</strong> alarm L<strong>an</strong><br />

L<strong>an</strong> alarm target supervisor<br />

1<br />

E - Internetwork alarm<br />

address <strong>an</strong>d L<strong>an</strong> of to report internetwork<br />

1<br />

address<br />

Internetwork alarm alarms to a supervisor (only<br />

T - Internetwork alarm L<strong>an</strong><br />

target<br />

for lowest addressed IQ<br />

System device on L<strong>an</strong>)<br />

1<br />

r - <strong>LonWorks</strong> retry time<br />

See IQ System <strong>LonWorks</strong><br />

2<br />

i - <strong>LonWorks</strong> interpacket<br />

Products Engineering 2<br />

delay<br />

M<strong>an</strong>ual for details<br />

a - <strong>LonWorks</strong> service class<br />

2<br />

b - router Buffer size buffer size<br />

specifies smallest router If routers separate<br />

2<br />

(<strong>by</strong>tes)<br />

Default = 146<br />

buffer on system IQLs/LINCs/LONCs <strong>an</strong>d<br />

have buffer size smaller that<br />

146 <strong>by</strong>tes - set to smallest<br />

buffer size. (minimum = 66)<br />

m - <strong>LonWorks</strong> Message<br />

code<br />

code number.<br />

Default = 64<br />

Code used <strong>by</strong><br />

IQLs/LINCs/LONCs, all<br />

LINCs/LONCs must use<br />

same code<br />

If message code being used<br />

<strong>by</strong> other users - must be<br />

exclusive to IQ System<br />

2, 5<br />

T(..Time<br />

U1(..User<br />

g - generator number<br />

e - neuron id<br />

H - Hours<br />

N - Minutes<br />

D - Day of month<br />

unique<br />

identifier for<br />

neuron<br />

T o find PIN if lost<br />

(read only)<br />

To find PIN if lost; to (read only)<br />

identify Lon node<br />

Current<br />

time<br />

Current<br />

date<br />

To synchronise time for<br />

alarms <strong>an</strong>d logging<br />

To synchronise date for<br />

alarms <strong>an</strong>d logging<br />

M - Month<br />

3<br />

Y - Year<br />

3<br />

l - L<strong>an</strong> of system<br />

timemaster<br />

P - PIN<br />

l -level<br />

IQL timekeeper gets<br />

time sync from IQ at<br />

address 11 on this L<strong>an</strong><br />

PIN number in IQ<br />

authority<br />

level of PIN<br />

IQL will be timekeeper If this 3, 4<br />

'l'<br />

parameter is non-zero<br />

<strong>an</strong>d own address = 11<br />

To protect from<br />

3, 6<br />

unauthorised ch<strong>an</strong>ges<br />

No<br />

protection if zero<br />

3<br />

Note 1: IqlTool2 facilitates setting of these parameters across the <strong>LonWorks</strong> segment<br />

Note 2: Ch<strong>an</strong>ging <strong>an</strong>y of these parameters results in a controller reset (clears down time <strong>an</strong>d <strong>an</strong>d sensor logs)<br />

Note 3: Any ch<strong>an</strong>ges to these parameters should immediately be followed <strong>by</strong> a write to the address<br />

module, [text comms comm<strong>an</strong>d, R(z=0), recommended], to commit ch<strong>an</strong>ges to flash memory.<br />

Note 4: IqlTool2 facilitates setting to timekeeper (sets up timemaster L<strong>an</strong> <strong>an</strong>d ch<strong>an</strong>ges own address to 11)<br />

Note 5: Message code c<strong>an</strong> only be ch<strong>an</strong>ged <strong>by</strong> text comms if 'lonworks m<strong>an</strong>aged' (read only) is set to No.<br />

Note 6: If PIN is forgotten see note in step 5<br />

3<br />

15<br />

Set up L<strong>an</strong> System<br />

if required<br />

Check L<strong>an</strong><br />

SET<br />

IQL<br />

<strong>LonWorks</strong><br />

LINC<br />

IQ<br />

Use SET <strong>an</strong>d terse text communications<br />

LINC Installation<br />

Instructions TG103062<br />

IQ System <strong>LonWorks</strong><br />

Products Engineering<br />

M<strong>an</strong>ual - TE200292<br />

IQL13+/xxx Installation Instructions TG200383 Issue 3/C 06/09/07 11


IQL13+/xxx<br />

Installation Instructions<br />

4 Installation - Configuration (Continued)<br />

16<br />

Set up IC Comms from IQL<br />

if required<br />

IC Comms Module Nx(.. - (x=1 to y; y=4 for st<strong>an</strong>dard strategies)<br />

Parameter<br />

Function<br />

A - Remote device address<br />

If zero, 'global to' comms. If non-zero specifies<br />

target device address for 'data to' comms<br />

For 'global to' comms only, attribute of target IQ,<br />

B - Attribute<br />

references attribute in address module (0 'no<br />

attribute', - all IQs on L<strong>an</strong>,1 'identifier', 2 'attribute<br />

2', 3 'attribute 3')<br />

N - Remote L<strong>an</strong><br />

Target IQ L<strong>an</strong> number; if L<strong>an</strong> zero, address zero,<br />

specifies global global<br />

I - Interval<br />

Interval between sending (minutes)<br />

S - Signific<strong>an</strong>t ch<strong>an</strong>ge Amount <strong>an</strong>alogue must ch<strong>an</strong>ge before sending<br />

M - Source item string Item <strong>an</strong>d parameter being sent (e.g. S1(V) )<br />

E - Destination module number No. of destination module receiving IC comms<br />

T - Destination type<br />

Type of destn module receiving comms (e.g. W,K)<br />

Use IqlTool2 (see step 5) <strong>an</strong>d text communications<br />

<strong>LonWorks</strong><br />

LCI<br />

IQL<br />

S1<br />

S8<br />

K1<br />

K2<br />

K8<br />

I1<br />

I8<br />

W1<br />

W7<br />

W8<br />

Nx<br />

Nx<br />

IC Comms<br />

LINC<br />

IQ<br />

17<br />

Set up IC Comms from IQ<br />

if required<br />

IC Comms ‘direction’ in IQ must be:<br />

Global To, Min, Max, Sum, or<br />

Average (directions 2 to 6)<br />

see IQ Configuration<br />

M<strong>an</strong>ual 90-1533<br />

Use SET <strong>an</strong>d terse text communications<br />

18<br />

<strong>LonWorks</strong><br />

Set up Communications from<br />

Supervisor if required<br />

e.g. 963 (drag <strong>an</strong>d drop values)<br />

Note that st<strong>an</strong>dard strategy pages are available<br />

for 963 from Partnernet<br />

IQL<br />

S1<br />

Terse Text Comms<br />

LINC<br />

<strong>LonWorks</strong><br />

S1<br />

IQL<br />

A1<br />

LINC<br />

S8<br />

K1<br />

K2<br />

K8<br />

I1<br />

IQ<br />

S16<br />

K1<br />

K8<br />

I1<br />

A16<br />

A17<br />

A24<br />

B1,0<br />

Nx<br />

I8<br />

W1<br />

W7<br />

W8<br />

I16<br />

W1<br />

W8<br />

B2,7<br />

B18,0<br />

B19,7<br />

IC Comms<br />

Nx<br />

IQ<br />

Note that <strong>an</strong>y ch<strong>an</strong>ges to the strategy parameters<br />

should immediately be followed <strong>by</strong> a write to the<br />

address module, [text comms comm<strong>an</strong>d, R(z=0),<br />

recommended], to commit ch<strong>an</strong>ges to flash memory.<br />

5 Disposal<br />

WEEE Directive :<br />

At the end of their useful life the packaging <strong>an</strong>d product should be disposed of <strong>by</strong> a<br />

suitable recycling centre. Do not dispose of <strong>with</strong> normal household waste. Do not burn.<br />

M<strong>an</strong>ufactured for <strong>an</strong>d on behalf of the Environmental <strong>an</strong>d Combustion Controls Division of Honeywell Technologies Sàrl, Ecublens, Route<br />

du Bois 37,Switzerl<strong>an</strong>d <strong>by</strong> its Authorized Representative, <strong>Trend</strong> Control Systems Limited.<br />

<strong>Trend</strong> Control Systems Limited reserves the right to revise this publication from time to time <strong>an</strong>d make ch<strong>an</strong>ges to the content hereof<br />

<strong>with</strong>out obligation to notify <strong>an</strong>y person of such revisions or ch<strong>an</strong>ges.<br />

<strong>Trend</strong> Control Systems Limited<br />

P.O. Box 34, Horsham, West Sussex, RH12 2YF, UK. Tel:+44 (0)1403 21888 Fax:+44 (0)1403 241608 www.trend-controls.com<br />

<strong>Trend</strong> Control Systems USA<br />

6670 185th Avenue NE, Redmond, Washington 98052, USA. Tel: (425)897-3900, Fax: (425)869-8445 www.trend-controls.com<br />

12<br />

IQL13+/xxx Installation Instructions TG200383 Issue 3/C 06/09/07

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!