In 2012, the project was carried out in accordance with the plan, but with smaller intensity<br />

than expected. The procedure for HPPs Renke, Trbovlje and Suhadol NSP started, but<br />

was suspended at the spatial planning conference, due to unsigned concession contract.<br />

Despite considerable efforts of the concessionaire – <strong>HSE</strong>, the contract has not been signed<br />

yet. In the second half of 2012, the Ministry of Agriculture and the Environment presented<br />

its proposal on expanding the Nature 2000 programme as far as Kresnice.<br />

In 2012, two documents that should be signed along with the concession contract<br />

were prepared in collaboration with the Zasavje region municipalities: Agreement on<br />

Cooperation and Mutual Rights and Obligations Regarding Construction of HPP Suhadol,<br />

Hpp Trbovlje and HPP Renke, and as appendix, List of Projects and Financing Sources.<br />

The two documents define participation of individual municipalities in the project and all<br />

arrangements carried out within HPPs (due to their effect, as well as other arrangements<br />

that do not relate to HPPs). They include list of sources to fund individual project, as well<br />

as people responsible for them.<br />

In 2011, the company SRESA was established (with the partners on the project – SEL and<br />

GEN). In 2012, the company still did not operate in full extent, since the holder of concession<br />

is <strong>HSE</strong>; therefore, all activities are still managed by <strong>HSE</strong>.<br />

The project investor is the company <strong>HSE</strong>.<br />

2.9.4 PSP Kozjak<br />

The basic concept behind the construction of PSP on the Drava River is to exploit natural<br />

possibilities for electricity production in times of its peak consumption and to provide<br />

better exploitation of base load power plants. PSP will ensure back-up power in the event<br />

of major production outages in the Slovenian electricity system and will enable control<br />

over the network power and frequency.<br />

In 2012, activities for preparation of Environmental Impact Report and relating expert<br />

assessments in the area of electromagnetic radiation, noise and vibrations, and<br />

archaeology, were carried out.<br />

The project investor is the company DEM.<br />

2.9.5 Reconstruction of HPPs Doblar I,<br />

second stage<br />

The reconstruction of HPP Doblar, started in 2009, comprises a gradual replacement of all<br />

three turbines and ancillary systems. After a successful launch of operations on the third<br />

turbine, de-installation of the second turbine began in September 2011, with complete<br />

removal of turbine, generator, inlet penstock and other electronic equipment . Demolition<br />

works were performed, the new spiral case was concreted and new turbine generator<br />

and other equipment were installed. Technical inspection was carried out. After the<br />

first synchronisation in October 2012 and trial runs on the network, the contractual trial<br />

operation of turbine 2 began.<br />

The project investor is the company SENG.<br />

2.9.6 PV investments<br />

A major investment of the company PV, started in 2011, comprises establishment of<br />

connections to the opening parts of the pit centre and connections for extraction of the<br />

pillar of central part. PV continued with the construction of NOP II shaft and carried out the<br />

necessary maintenance of external facilities.<br />

<strong>Annual</strong> Report <strong>HSE</strong> 2012<br />

2 Business Report<br />

67