• On 31 May, <strong>HSE</strong> Invest celebrated its 10 th anniversary.<br />

• DEM started using new gantry crane at HPP Dravograd.<br />

June<br />

• On 4 June, TEŠ and Alstom signed an agreement on postponement of the deadline for<br />

ZPODPTEŠ adoption until 16 June 2012, due to issues with obtaining the government<br />

guarantee. Since the discussed condition was not met, the agreement on main<br />

technological equipment supply for Unit 6 was suspended from 17 June to 2 July 2012.<br />

• On 6 June, an official spatial planning procedure for HPP on the Mura River with<br />

preparation of NSP for the first HPP on the river.<br />

• On 12 June, first stage of rotation with water flow on the HPP Krško turbine 3 was carried<br />

out, so the launch of hydro- and electrical equipment tests could start.<br />

• On 13 June, operations of renewed joint control centre for DEM and <strong>HSE</strong> were launched.<br />

• On 21 June, the Committee on Finance and Monetary Policy of the National Assembly<br />

discussed the proposed ZPODPTEŠ; discussions continued on 28 June and were<br />

successfully completed on 13 July.<br />

• On 29 June, the Government approved the NSP for HPP Brežice.<br />

• SENG successfully completed the TI of the ventilation tube – stage I at PSP Avče.<br />

• TET submitted their offer for tenders regarding provision of reliable electricity supply<br />

through use of local primary sources and gained funds in the amount of EUR 7.4 million.<br />

• The 52 th traditional event ‘Skok čez kožo’ took place in PV.<br />

• The largest daily extraction in 2012 was achieved in PV with 24,749 tonnes of coal<br />

extracted.<br />

July<br />

• On 2 July, TEŠ and Alstom entered into an agreement in order to proceed with the project<br />

within the planned timeline, i.e. in the form of annex regarding termination of suspension<br />

of contract implementation and change of the payment plan until 31 October, with<br />

control point on 5 October 2012.<br />

• On 18 July, the National Assembly adopted the ZPODPTEŠ act.<br />

• On 19 July, the Government adopted the Decree on National Spatial Plan for GSPP in TET.<br />

• On 3 July, compliant with the testing programme, HESS successfully completed the first<br />

integration of HPP Krško in the electricity network of Slovenia.<br />

August<br />

• On 1 August, ZPODPTEŠ was published in the Official Gazette of the Republic of Slovenia<br />

and, thus, became effective.<br />

• On 13 August, the SB of HESS approved the energy part of the Investment programme<br />

for HPP Brežice.<br />

• On 27 August, after a year of reconstruction, DEM launched operations of the second<br />

turbine at HPP Zlatoličje.<br />

• SENG performed partial TI for the reconstruction of HPP Doblar I, stage II, turbine 2 (LOT<br />

EE).<br />

<strong>Annual</strong> Report <strong>HSE</strong> 2012<br />

1 Introduction<br />

20<br />

September<br />

• On 25 September, a short celebration took place in DEM due to official completion of the<br />

small HPP Ruše construction project.<br />

• The TEŠ and <strong>HSE</strong> Supervisory Boards discussed and approved NIP 5 (Revised investment<br />

plan, 5 th revision) for the TEŠ replacement Unit 6.<br />

• TEŠ obtained the approval from the guarantor banks and the EBRD on suspension of<br />

the condition on providing applicable government guarantee for liabilities arising from<br />

the long-term loan in the amount of EUR 440 million from the EIB for the purpose of<br />

financing the construction replacement Unit 6, namely until 30 November 2012.<br />

• The primary and secondary steel constructions – the suspension part of Unit 6 were<br />

successfully installed.<br />

• PV handed over the construction of NOP II shaft to the main contractor, the related<br />

company RGP Velenje, meaning that the works should be completed within 30 days.<br />

• The regular annual overhaul of TET was completed.<br />

October<br />

• On 12 October, DEM performed internal technical inspection of turbine 1 equipment at<br />

HPP Zlatoličje.