16.01.2015 Views

Annual report - HSE

Annual report - HSE

Annual report - HSE

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1.3 Electricity production and trading<br />

in the <strong>HSE</strong> Group<br />

SALES IN FOREIGN MARKETS<br />

19,187 GWh | 61% of sales<br />

SALES IN DOMESTIC MARKET<br />

12,193 GWh | 39% of sales<br />

SALES OF ELECTRICITY<br />

<strong>HSE</strong> COMPANY<br />

132 employees 31,380 GWh 100% RS<br />

as at 31.12.2012<br />

OTHER SOURCES<br />

23,541 GWh 75% of<br />

sources<br />

SOURCES OF ELECTRICITY<br />

OWN PRODUCTION SOURCES<br />

2,440 employees 7,839 GWh 25% of<br />

as at 31.12.2012 1,888 MW sources<br />

domestic market 39%<br />

foreign market 61%<br />

own sources 25%<br />

other sources 75%<br />

45% of sources 55% of sources<br />

HYDRO<br />

450 employees 3,527 GWh<br />

as at 31.12.2012 1,033 MW<br />

72 turbines<br />

THERMAL<br />

657 employees 4,312 GWh<br />

as at 31.12.2012 855 MW<br />

4 units and<br />

4 gas turbines<br />

PRIMARY SOURCES<br />

1,333 employees 41,799 TJ<br />

as at 31.12.2012<br />

DEM<br />

290 employees 2,645 GWh 100% <strong>HSE</strong><br />

as at 31.12.2012 589 MW<br />

24 turbines<br />

TEŠ<br />

464 employees 3,743 GWh 100% <strong>HSE</strong><br />

as at 31.12.2012 687 MW<br />

3 units and 2<br />

gas turbines<br />

PV<br />

1,333 employees 42,385 TJ 77.7% <strong>HSE</strong><br />

as at 31.12.2012<br />

SENG<br />

129 employees 641 GWh 100% <strong>HSE</strong><br />

as at 31.12.2012 335 MW<br />

39 turbines<br />

TET<br />

193 employees 569 GWh 81.3% <strong>HSE</strong><br />

as at 31.12.2012 168 MW<br />

1 unit and 2<br />

gas turbines<br />

HESS**<br />

31 employees 242 GWh 84.6% <strong>HSE</strong><br />

as at 31.12.2012 109 MW<br />

9 turbines<br />

* Net capacity in MW is represented at the end of 2012.<br />

** According to the contract, 15.4 % of HESS production is sold outside the <strong>HSE</strong> Group; the test operation of HPP<br />

Krško started in in October 2012 (test production in the October-December 2013 period amounted to 23.5 GWh).<br />

<strong>Annual</strong> Report <strong>HSE</strong> 2012<br />

1 Introduction<br />

15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!