The Public Procurement Rules 2008 - LGED
The Public Procurement Rules 2008 - LGED
The Public Procurement Rules 2008 - LGED
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
(b)<br />
the response to a clarification request shall be copied to all Applicants who have<br />
purchased the Pre-Qualification Document, without indicating the source<br />
requesting the clarification.<br />
(9) A Procuring Entity may, in order to clarify issues and answer to questions on any<br />
matter arising in the Pre-Qualification Document, also invite the prospective Applicants to attend a<br />
Pre-Qualification Meeting at a place, date and time duly specified in the Pre-Qualification<br />
Document.<br />
(10) <strong>The</strong> Pre-Qualification Applications shall be received by the Procuring Entity and kept<br />
in safe custody until opening of the same by the Tender Opening Committee (TOC);<br />
(11) Applications received after the deadline for submission of Pre-Qualification<br />
Application shall be returned unopened to the Applicant by the Procuring Entity.<br />
(12) <strong>The</strong> format and text to be used by Procuring Entities for the Invitation for Pre-<br />
Qualification (IFPQ) is shown in Schedule X .<br />
(13) Procuring Entities shall use the standard Pre-Qualification Document issued by the<br />
CPTU when undertaking a <strong>Procurement</strong> using the Pre-Qualification process.<br />
(14) <strong>The</strong> Procuring Entity may permit the use the Pre-Qualification Document posted on<br />
their Website for the submission of Applications.<br />
92. Opening of Pre-Qualification Applications. |— `(1) <strong>The</strong> Tender Opening<br />
Committee (TOC) constituted under Rule 7 shall open the Applications in public after the deadline<br />
for submission date at the time and place specified in the Pre-Qualification Document.<br />
(2) <strong>The</strong> TOC shall record the name, address and any other relevant identity of each<br />
Applicant during opening and, furnish a copy of the record of opening upon such written request to<br />
any Applicant.<br />
(3) <strong>The</strong> Tender Opening Committee shall forward the Applications to the Procuring Entity<br />
which will then be responsible for its safe custody and further action in line with Rule 32.<br />
93. Evaluation of Pre-Qualification Applications. |— (1) <strong>The</strong> TEC shall use the<br />
conditions, criteria, and requirements defined in the Pre-Qualification Document to evaluate the<br />
qualifications of the Applicants.<br />
(2) <strong>The</strong> Head of the Procuring Entity may, to assist the Tender Evaluation Committee,<br />
form a Technical Sub-committee comprising of experienced persons and experts.<br />
(3) <strong>The</strong> TEC shall evaluate the Applications received on a pass or fail basis.<br />
(4) <strong>The</strong>re shall be no upper limit for number of Pre-Qualified Applicants and all<br />
Applicants who passed the Qualification requirements shall be included in the list.<br />
(5) <strong>The</strong> TEC may consider minor deviations in the qualification criteria if they do not<br />
materially affect the capability of an Applicant to perform Works under the Contract.<br />
(6) Qualifications of Subcontractors that have been identified in the Application may be<br />
considered in the evaluation of an Applicant but only in relation to Subcontractors’ specific<br />
assignment.<br />
(7) <strong>The</strong> general experience and financial capacity of Subcontractors shall not be added to<br />
75